• Frame Steel Scaffolding Rack   CNBM System 1
  • Frame Steel Scaffolding Rack   CNBM System 2
  • Frame Steel Scaffolding Rack   CNBM System 3
Frame Steel Scaffolding Rack   CNBM

Frame Steel Scaffolding Rack CNBM

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
20 m.t
Supply Capability:
3000 m.t/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.Quick Details

  • Model Number: FAS-DB

  • Surface: Galvanized

  • Material: High Strength Steel

  • Type: Diagonal Brace

  • Certification: CE

Frame Steel Scaffolding Rack   CNBM


Packaging & Delivery

Packaging Details:pallet

2.Product Description

Model No: FAS-DB

Product Name: Scaffolding System--Cross Brace With Single Coupler 

3.Feature:

1. Made of Φ48.3mm x 3.20mm thickness steel tube,

    Specification(mm): 2000(H)x2070/2570/3070(W) etc.

2. Surface: painted/cold (hot) dipped galvanized or to be order

3. Also can manufacture it as your requiremen


 4.

Ring   Lock System Scaffold Steel Plank (9.5" wide)

Model

Description

Weight(kg)

Weight(lbs)

AR.SSP.3050

Ring Lock Steel Plank 3050mm (10')

20.56

42.92

AR.SSP.2440

Ring Lock Steel Plank 2440mm (8')

17.01

35.13

AR.SSP.2130

Ring Lock Steel Plank 2130mm (7')

15.21

31.17

AR.SSP.1830

Ring Lock Steel Plank 1830mm (6')

13.47

27.34

AR.SSP.1520

Ring Lock Steel Plank 1520mm (5')

11.66

23.39

AR.SSP.1220

Ring Lock Steel Plank 1220mm (4')

9.92

19.56

AR.SSP.1150

Ring Lock Steel Plank 1150mm (3'10")



5.What is considerations of Scaffolding installation?

There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

(1) scaffold frontage hurtful to prevent falling objects protection is required.

(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

Q: Will the equipment based on the beam column and other structures, can not be poured once completed, should be set up civil construction or fixed?
The following model for your reference, the project budget is to determine the project cost and work, material consumption of the document, is the basis for assessing the economic investment
Q: How to carry out fire inspection at construction site construction site (including information and site)
the construction unit should establish fire safety management organizations and voluntary organizations, and clear responsibility and responsibility
Q: How to do a good job in typhoon prevention work in rural areas?
Listen to weather forecasts, reinforce Dapeng and other infrastructure, to prevent lightning, to quickly cut off all kinds of electrical power
Q: The obvious would be helpful too!
Number one: Never clean with peroxide, alcohol or neosporin. -Get yourself a nice antibacterial soap without lotions, dyes or scents. (Try Satin) As for sleeping, my suggestion is to bend your arm under your head in a triangle fashion and to keep your ear in the little hole so it won't be bothered much. Sea salt soaks! They can really change the healing process right around. They're easy to do and well worth the time. Good luck!
Q: Seeking the Responsibility System of Safety Responsibility of Each Function Department Garden company for safe production permit
System, and to monitor the implementation of the situation
Q: Such as the title, raw materials and structural parts What is the difference, how to divide?
Prefabricated concrete pipe piles are structural parts Raw materials refers to the main components of steel, cement, sand, stone and so on
Q: Also if its possible part B wants to know A ball thrown vertically upward is caught bythe thrower after 2 s.Find the initial velocity of the ball. Theacceleration of gravity is 9.8 m/s2Answer in units of m/sFind the maximum height it reaches.Answer in units of m
A) Speed of falling brush = at =9.8 x 3.39 = 33.22m/sec B) Vertical distance Y = Vo x t - 0.5 x at^2 0 = Vo x 2 - 0.5 x 9.8 x 4 Initial Velocity = Vo = 9.8m/sec^2 Vertical height = Vo^2/2g = 9.8^2/2 x 9.8 = 4.9m
Q: 2009 and 2010 construction of secondary construction division of the exam questions and answers, Jiqiu ~!
2009 and 2010 construction of secondary construction division of the exam questions and answers, Jiqiu ~
Q: what do you call a place of great significance? such as the scaffold in the Scarlet Letter?
Historical a place with alot of history attached to it Landmarks
Q: I'm still at school and if I got my scaffolding done at the start of the summer holidays it would have 6 weeks to heal, I would have to take it out once a week for 2 hours, would I experience any issues?
They take 9-12 months to heal and an unhealed piercing should never be removed. Yes, you would experience issues. It would likely close or shrink in size or if it somehow didn't then you could easily cause infection, irritation, prolonged healing, hypertrophic scarring...nothing you should be willing to risk. 6 weeks is far from being long enough.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords