• Frame Steel Scaffolding Rack   CNBM System 1
  • Frame Steel Scaffolding Rack   CNBM System 2
  • Frame Steel Scaffolding Rack   CNBM System 3
Frame Steel Scaffolding Rack   CNBM

Frame Steel Scaffolding Rack CNBM

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
20 m.t
Supply Capability:
3000 m.t/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.Quick Details

  • Model Number: FAS-DB

  • Surface: Galvanized

  • Material: High Strength Steel

  • Type: Diagonal Brace

  • Certification: CE

Frame Steel Scaffolding Rack   CNBM


Packaging & Delivery

Packaging Details:pallet

2.Product Description

Model No: FAS-DB

Product Name: Scaffolding System--Cross Brace With Single Coupler 

3.Feature:

1. Made of Φ48.3mm x 3.20mm thickness steel tube,

    Specification(mm): 2000(H)x2070/2570/3070(W) etc.

2. Surface: painted/cold (hot) dipped galvanized or to be order

3. Also can manufacture it as your requiremen


 4.

Ring   Lock System Scaffold Steel Plank (9.5" wide)

Model

Description

Weight(kg)

Weight(lbs)

AR.SSP.3050

Ring Lock Steel Plank 3050mm (10')

20.56

42.92

AR.SSP.2440

Ring Lock Steel Plank 2440mm (8')

17.01

35.13

AR.SSP.2130

Ring Lock Steel Plank 2130mm (7')

15.21

31.17

AR.SSP.1830

Ring Lock Steel Plank 1830mm (6')

13.47

27.34

AR.SSP.1520

Ring Lock Steel Plank 1520mm (5')

11.66

23.39

AR.SSP.1220

Ring Lock Steel Plank 1220mm (4')

9.92

19.56

AR.SSP.1150

Ring Lock Steel Plank 1150mm (3'10")



5.What is considerations of Scaffolding installation?

There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

(1) scaffold frontage hurtful to prevent falling objects protection is required.

(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

Q: What would you like to ask?At what height do scaffolds have to be engineered?
At all heights...they are engineered as a system.
Q: What kind of insulation materials and equipment are allowed to be imported in China?
One of China Polypropylene board (EPS board) or extruded board (XPS board), extruded board special interface agent
Q: What is the bamboo board for the scaffolding of the building?
Scaffolding, also known as scaffolding, in the scaffolding, the operating frame laying, to facilitate workers walking in the top, transport materials and construction operations of a temporary turnover of the use of building materials
Q: Pain on a scale of 1-10Advice on piercing?I heard it's easily infected??
Pain will differ from person to person so no one can really answer that. My advice is to sleep with your arm bent under your head so your ear is in that little whole and nothing can bother it. Also, avoid dying your hair for the next two months and be care when putting on sweaters, shirts, brushing hair, et cetera. Infection is a problem if you keep it clean but irritation is because every time you bump on side, you bump the other as well. Good luck!
Q: I live on a 2nd floor apartment with gorgeous, huge, arched windows. Until a week ago, we had a lovely view of a tree-lined street in NYC, but my building just installed a scaffolding which almost acts as a balcony for us. Our view is gone, and there is definitely a safety issue as anyone could climb off the scaffolding into our apartment through the windows. The windows are so old, and cannot fully lock unless wedged shut - and then we cannot open them for any kind of ventilation.There is work being done on the building and the super says the scaffolding will be up for at least a year.As a tenant, what rights do I have? I want to call my landlord and ask for a rent reduction as these windows were a huge spelling point at the time of rental. I am also worried that someone will enter my apartment during the day when I am not here. We have been here happily for 5 months, but this is really upsetting. Any advice on what I should do?
explain to your land lord the problems you are facing because of the old windows. i hope he understands you otherwise vacate the house and search for a new one. some companies also insurance for renters.go for it. i hope my answer helps you. all the best!
Q: Please advise the construction industry experts: residential full scaffolding inside the frame how to calculate the number of steel pipe needs, pay attention, I asked how many meters! Or tell me how many meters per square meter of steel pipe? And then attached to the high requirements, thank you For example: now a layer of 1000 square meters area, a total of 10 standard layer of residential buildings, 3 meters high! How to calculate the amount of steel required to do a layer? The amount of steel pipe in meters, or tonnage units.
Look at how many holes are needed with a few meters of steel pipe
Q: What is the most important safety hazard at the construction site?
Civilized construction Site fencing Some works in the urban area of ??the main section of the site is not set above the 25m fence some site fence material is not strong, unstable, not clean, do not meet the local aesthetic requirements
Q: for 10 sq. meters = ? h/sq. m. and how many person need to do the job?
It depend upon availability sorting of ledger to be used.If prop ledger has been transported sorted then three person can do 10 sqm in maximum 3/4 hour .i.e.0.075 h/sqm
Q: Also if its possible part B wants to know A ball thrown vertically upward is caught bythe thrower after 2 s.Find the initial velocity of the ball. Theacceleration of gravity is 9.8 m/s2Answer in units of m/sFind the maximum height it reaches.Answer in units of m
Use, Vf = Vo + g * t With Vo = 0 , Vf = g * t = 9.8 m/s^2 * 3.39 s = 33.222 m/s. part B, use the same equation, but take into consideration to watch for direction and adopt a convention. As before we have considered +ve for downward direction. Now Vf = 0 0 = Vo + g * t. Vo = - 9.8 m/s^2 * 2 s = -19.6 m/s . Negative means upward direction according to the adopted convention.
Q: what do you call a place of great significance? such as the scaffold in the Scarlet Letter?
Historical a place with alot of history attached to it Landmarks

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords