• Formwork Ductile Iron tie rod for construction System 1
  • Formwork Ductile Iron tie rod for construction System 2
  • Formwork Ductile Iron tie rod for construction System 3
Formwork Ductile Iron tie rod for construction

Formwork Ductile Iron tie rod for construction

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
500 pc
Supply Capability:
10000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Specification

usage:
be used with wing nut
Process:
cold rolled
Tensile strength:
more than 190KN
type:
formwork accessories
Item:
Formwork Ductile Iron tie rod for construction
finish:
black,electroplate
weight:
as your size
Size:
1m,2m,3m,4m,5m,6m etc
Material:
45# steel
color:
white,yellow

Formwork Ductile Iron  tie rod for construction

Product Description


Commodity name

Formwork Ductile Iron  tie rod for construction

Usage

be used with wing nut 

Origin

China Mainland

Material

Q235 or 45#steel

Process

cold rolled

Surface

Electro-galvanized,natural,HDG

M.O.Q

2000PCS

Packing

steel pallet

Delivery time

20-25 days after order confirmation

Payment term

T/T, L/C, Western Union

Business type

Manufacturer and exporter

Certifications

SGS

Advantage

1.High Quality  2.Professional service 3.Competitive price

Notes

Special marks can be made according to customers requirements;


It is available to produce by customer drawing.

Main products

Different kinds of scaffold coupler, Ringlock scaffolding system, Cuplock Scaffolding System,

 Kwikstage scaffolding  system, shoring prop, formwork system, frame system, Accessories

Formwork Ductile Iron tie rod for construction

Formwork Ductile Iron tie rod for construction

Formwork Ductile Iron tie rod for construction

                                    Formwork Ductile Iron  tie rod for construction Formwork Ductile Iron tie rod for construction

.jpg

 

Company Information

 

Our Services

Formwork Ductile Iron tie rod for construction 

Production processes

Formwork Ductile Iron tie rod for construction 

Packaging & Shipping

Formwork Ductile Iron tie rod for construction

Certificates

3 (1)



Q: Standard for inspection of portal scaffolding
1.4 willow nails shall be made of ML2 steel specified in GB 715. All accord with the 1.5 electrode should be used in GB 5117 series E43 electrode. Comply with the 2 basic requirements: qualified 2.1 door frame and accessories in different combination conditions, shall be accorded with the inspection results are summarized in table NO:2008JW1658 inspection project and standard units of measurement test results 1# 2# single determine connectivity and interchangeability. When the 2.2 cross support, the connecting rod and other accessories are connected with the door frame, the utility model is in conformity with the retreat mechanism which is used to prevent the exit. When the connecting rod is used with the lock arm, the connecting rod is not limited by the limit. The 2.3 level frame, and the door frame scaffolding should prevent off the hooks, are in line with the fastening mechanism of the fall.
Q: HELP me out please. im struggling with this book
I dont think she explained the rose bush very well. i think that it refers to Good and bad. Good being the rose and bad being the thorns Hester said in the book that she picked Pearl off a rose bush. Hester loves pearl but also fears her
Q: What are the general specifications of bowl buckle scaffold?
2, of course, scaffolding to the new is better than the quality of steel is much improved with the old, regular use can generally be used for about 10 years, abandoning the bolt connection. Component jingpengnaike. Even if the corrosion does not affect the spelling and use. This does not require special maintenance and maintenance. Fastener type steel pipe scaffolding in general about 3 years on the need for screws and other operations. So I think it is convenient to bowl buckle scaffold. 3, disassembly more secure, more convenient, better performance than traditional fastener type steel pipe scaffolding.
Q: What is a bowl buckle scaffold?
Compared with other types of scaffolding, bowl buckle type multifunctional scaffolding is a new scaffold with broad development prospects.
Q: How to calculate the rental price of portal scaffolding
Fierce competition, is 2 yuan / sets / dayPulleys, pedals, and base are normally 1 yuan per day
Q: Im hoping to get an industrial/scaffold piercing done at the very beginning of the summer holidays.Is it possible that they can be pierced with 2 separate pieces of jewellery rather than one bar.Also would it be healed in time to take it out once the holidays are over (6 weeks)??Please help??!?Thanks x
Yep, some piercers prefer to do it that way. Just make sure you let them know that that's what you want when you go into the shop and they can accommodate you. No cartilage piercing is healed enough to remove in 6 weeks. Cartilage piercings can take anywhere from 6-12 MONTHS to fully heal.
Q: Calculation method of complete scaffold
No matter where we are, we all have time to go with us. It's an eternal departure
Q: I think that'd be extremely entertaining.
New Jack only likes to beat up fat guys (Vic Grimes) and old men (Gypsy Joe). I don't think he'd want to try messing with Cena lol
Q: I would like to ask how much scaffolding steel prices, scaffolding steel pipe use what are the requirements?
Scaffolding steel pipe1, set up a high-level scaffolding, the various materials used must meet the quality requirements.2, the foundation must be firm, before the erection of the calculation, to meet the load requirements, and according to the construction code set up, do drainage measures.3, scaffolding erection technical requirements shall comply with the relevant provisions of the code.4, we must attach great importance to a variety of structural measures: scissors, pull nodes, etc. should be set according to requirements.5, the level should be closed: the first step, every step or two, covered with planks or hand foot fence, scaffolding to laying along the long, joints should be overlapped in the small bar, do not appear short board. And in between in the pole and the wall every four steps long laying safety bottom fence.6, vertical closure: from the second step to the fifth step, each step required in the outer row of pole side door set like baluster 1.00m high and block feet or to set up protective net, rod (net) and the vertical rod fastened; more than fifth steps in a protective railing, should all the safety fence or security legislation net; in the street or densely populated areas, should be from the second step, the safety fence or outside of all network security legislation.
Q: by scaffolding ?
I'm guessing it is a reference to large breasts. But I could be wrong.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords