F-type (water only) New Building Materials
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 50 kg
- Supply Capability:
- 3000 kg/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
This product is refined from natural polymer materials, non-toxic, tasteless, odorless, can be quickly dissolved in cold water to form a transparent viscous solution, formulated at any time at the construction site, ready to use.
usable range:
The site needs to do waterproofing and other waterproofing products is a good substitute.
Directions:
Clean water was added in the barrel 20kg, agitator, so that the water in the bucket when
running fast, the F-type powder bag 500g- times poured into water, stirred for 2-3 minutes, add a 50kg bag of cement, stirring after evenly, you can use, when used, like cream, as approved putty construction, scrape the thickness of l-2mm, using the bathroom waterproof material, paste tiles will not fall off, waterproof better. Facades use of the material, the first layer of external wall scraping, and then paste the tiles, exterior paint, etc. do, there is absolutely no water to seep into the wall.
Performance and characteristics of instant powder: buildings instant powder, is a group of wall, ceramic tile, porcelain, blow be bored with child, ash, scraper ideal additive etc.
1, soluble in water, less dosage, high viscosity.
2, enzyme moisture resistance, ageing resistance;
3, long shelf life and temperature resistant frozen resistance, not easy to gel, stable performance;
- Q:What material waterproofing can be mixed with cement sand
- Waterproof layer used in the cement label of not less than 32.5MPa, the thickness of cement mortar should be 2-3cm, the surface clean and solid without cracks; mortar leveling layer of cement should not be less than 32.5MPa, leveling layer to smooth compaction, finished product maintenance is not low In 5 days.
- Q:FRP finished brush on what can be waterproof do not fade
- On the surface of the gel coat it is, a lot of gel coat points, the specific performance of what you want, you can communicate with the supplier
- Q:How do you make waterproofing in the kitchen and bathroom?
- Kitchen and toilet to do waterproof, it is recommended to use kitchen and toilet waterproof paste, it is specifically for the kitchen and toilet water and easy to seepage yin and yang angle, pipe, sanitary ware, floor drain and other parts of the development, special materials, so waterproof Ordinary waterproof material is better, and waterproof coating construction is more convenient, only need to brush 2-3 times, the thickness of 1.2-1.5MM on it. Specific construction methods are as follows: 1, will penetrate the root, floor drain and other cracks, need to repair the site cut into "V" shape, and clean, sprinkler moist; 2, the [infiltration of crystalline repair mortar] add water (water and ash weight ratio of 1: 2 ~ 3) mixed evenly, in the early condensate before (5 minutes) to repair the construction, the root of the pipe, the floor drain, yin and yang, Should be made r angle; 3, repair mortar after the final setting, the [durable waterproof paste] powder and liquid material mixing evenly, put it aside for 3 minutes, and then stir evenly after brushing on the base surface, should be cross brush twice, and so on The first time after the dry, can be carried out the second time construction; 4, after the completion of anti-stamped, 48 hours after the closed water test.
- Q:Villa roof leakage what general reasons, what materials to remedy
- Third, for some of the city building cover the construction of red tiles leakage, as long as the removal of tiles on the grass, moss or dust after the replacement of tiles, leak-proof effect is the same. For flat roofs, the roof of the obvious cracks, with the tool will be cracked into a "V" or "U" shape, filling the caulking ointment, filled with cracks and above the use of waterproof wrap around the package.
- Q:Eastern rainbow waterproof how to do
- General family bathroom is brush JBL waterproof coating, buy back to the first dilution, and then clean up the ground with brushing uniform brushing, the bathroom should brush the ground and the wall 1.6 meters high,
- Q:What is the car waterproof sticker material?
- Engraving process car sticks A. knife engraving process: refers to the computer will be vector graphics input knife machine, the knife will be cut into a preset film shape, and then by hand will be different colors together Finished, and finally in the finished product posted on the surface of a layer of transparent transfer film, after the stickers to remove the stickers; due to knife car paste production process is complex, high cost of materials, currently only suitable for individual car and Che Youhui team Small customization
- Q:What should you pay attention to before the construction of the basement waterproofing membrane?
- Plastic runway construction should pay attention to: 1, before the construction, must be on the asphalt concrete foundation for quality acceptance, acceptance criteria according to design standards and technical specifications, the plastic runway in the corresponding drainage facilities, can be used around the clock. The ambient temperature should be controlled at 5 ℃ ~ 38 ℃, to avoid below 5 ℃, 38 ℃ above the ambient temperature operation, the relative humidity control below 70%, the foundation requires a clean, according to the temperature and relative humidity to adjust the amount of catalyst The curing speed control appropriate. Color paste and prepolymer storage, the lid to be tightened, before use to detect moisture, qualified after use, the water in the foundation should also be controlled to avoid the bubble after the glue. Plastic pavement materials must be carefully checked when the quality inspection certificate and validity period.
- Q:Do you use the waterproof material on the building to be harmful to the human body?
- Your pores, the respiratory tract, the lungs, will be hurt, when young do not feel out, the consequences more powerful than smoking.
- Q:Waterproof material water leakage construction should pay attention to what
- 3, do the closed water test After the waterproof construction is completed, the water storage test. Will be blocked all the toilet outlet, the door at a pound of about 200mm high barrier, and then poured in the bathroom about 20mm ~ 30mm deep water, and 24 hours after the inspection of the walls and the ground around the leakage phenomenon , Waterproof test is to ensure the quality of the bathroom waterproofing the key, we must do. Such as after 24 hours without leakage as qualified. If you find a leak, you should immediately stop the water storage test, re-waterproof layer to improve the treatment, after passing the water test.
- Q:Roof for the insulation, Master roof, using two waterproof construction program
- Construction of roof waterproofing membrane First, the process (hot melt construction) Clean up the grass-roots → brushing the primary treatment agent → paving the film additional layer → paving the film → hot melt sealing side → water test → protective layer
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
F-type (water only) New Building Materials
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 50 kg
- Supply Capability:
- 3000 kg/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords