• exterior cedar panel siding wall panel VD100601-VDC113 System 1
exterior cedar panel siding wall panel VD100601-VDC113

exterior cedar panel siding wall panel VD100601-VDC113

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Vida faux cedar wall panel is an ideal way to create the look and beauty of brick without the time, cost and long installation process of actual brick. Vida faux brick wall panel can enchance many types of residential and commerical projects. Easy to clean and easy to install. We can offer wall panels with many colors that look great and can dramatically turn your home or building around overnight wherever you are.

 

Specifications of Brick Wall Panel:

Model

VD100601

Style

Cedar (with embossed patterns)

Color

113#

Type

Panel

Edge Type

Interlocking

Production Time

15-20days

Material

Polypropylene

Overall Dimensions

105 cm wide*47.5cm high

Coverage Dimensions

100cm wide*45cm high

Coverage

0.4988sq. m

Weight

Approx 3.0kg/sq. m

Exterior Use

Weather proof, near zero UV degradation



Main Accessories

Start strip, decorative strip, exterior corner, interior corner

Needed for installation

Nails for all plus plastic fasteners for start strip

Sample

Free sample, but freight collect

P.S.

1. The weight are approximate, sometimes the raw material and the formulation differs.

2. For samples, we can at most offer one piece per design. We can cut small pieces if needed.

3. We have color chart for you to choose color. It may have a slight color difference for different batch.

4. Besides polypropylene, we have added some other special chemical accessory materials

to enhance wall panels with a very good weather resisting property (+60°C to -50°C)

Q: Stone curtain wall 2-storey villa height of not more than 12 meters that specification has to do need to do lightning protection please God express
Norms and there is no provisions of the curtain wall is necessary to do lightning, but all the provisions of the third class of mine building buildings, it is necessary according to the provisions of the third type of mine structures to do the relevant lightning protection measures.
Q: What is the curtain wall seal
Both are basically the same in content, but there is no big difference in benchmarking. This difference often leads to a doubling of the workload, even a conceptual subversion, which in particular requires special attention in practice (as will be explained in detail below). In short, the new building curtain wall construction measurement line is deduced from the existing benchmark; and the old building renovation and expansion of the curtain wall construction measurement line is to find and determine the benchmark and then the benchmark transfer and expansion The The key to measuring the payoff is the rationality, reliability, and accuracy of the baseline transfer.
Q: In other words, is not the material in the air on the low-e film material damage.
Online coated glass after the steel should be able to monolithic use it
Q: Wall dry hanging stone design did not require protection is also done protection
Dry hanging stone of the specific needs of the secondary design: Stone protection is to take some protective agent to take brush, spray, Tu, roll, shower and soaking and other methods, so that the protective agent evenly distributed in the stone surface or penetrate into the stone to form a protection, so that the stone has a waterproof, Alkali, anti-aging, anti-freeze-thaw, anti-biological erosion and other functions, so as to achieve the improvement of stone life and decorative performance effect.
Q: Stone curtain wall less than 30 meters need to do lightning protection
Need to do, the stone hanging in the keel steel frame need to do a good job lightning protection grounding and do the connection at the junction of the lower part of the framework and the foundation of the foundation to connect the ground connection, the top of the building with lightning rod or lightning protection
Q: Stone curtain wall how many square meters for a test batch
Ask the best supervision, even if you are divided according to the norms of inspection batches, supervision and comments are white filled. If it is a joint building, such as the continuous construction of several buildings according to the number of buildings to divide it, of course, the premise is a large area of the situation. Or press 300 per square meter it.
Q: I have a furnished apartment and the sofa is a grey/green suede and I was wanting to painted the walls a lavender (more purple than pink.) What about these curtains
Those look nice. Orange goes well with lavender. They will also compliment the sofa.
Q: i want its colour be happy and suit.
a nice shade of red. Go to the sherwin williams website and look at their color visualizer online..you can choose from all their paint colors. Just know that it's not the wisest thing to design a room around curtains. It is easier to change your curtains that to change your wall colors, so you may want to think about the wall, and then curtains.
Q: Curtain wall construction workers are responsible for what
The construction workers are the grassroots technical organization and management personnel. The main work content is under the leadership of the project manager, in-depth construction site, to help do a good job in construction supervision, with the construction team to review the amount of work together to provide the required site construction materials specifications, models and arrival date, do the site material acceptance visa and management , Timely acceptance of hidden projects and engineering visa, to assist the project manager to do the project data collection, storage and archiving, on-site construction of the progress and cost of important responsibility. The work of the construction workers is to solve the relationship between the construction organization and the construction site at the construction site. The things in the organization design depend on the construction workers to supervise, measure and write the construction log, report the construction progress, the quality and handle the site problem. Department and construction team contact person. For example: water conservancy construction workers, construction workers, etc., in the "Water Resources Network" can find the right position. Reference Applicant Requirements: 1, with civil engineering and construction related professional graduate, secondary school or higher; 2, with practicing qualification certificate, more than 3 years working experience of construction workers; 3, familiar with the quality acceptance criteria, project construction management, safety and civilized construction norms; 4, familiar with the relevant technology, acceptance criteria, workflow arrangements, process focus and process convergence; 5, with a strong construction organization, coordination and communication skills.
Q: Stone wall concave and convex part of how to count
According to the expansion area count. Such as the thickness of the stone panel as the corner through the corner to show the bumps, which requires you to expand the area calculated. If the thickness of the stone panel to achieve the difference between the thickness of the image, it is necessary to separate the calculation, according to stone or stone panel concrete look at the drawings. Line thickness processing different prices are different, it is necessary to go to stone manufacturers.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords