• Export Scaffold props / telescopic steel prop / blue color prop 2.2-4M/thickness 3.0mm System 1
  • Export Scaffold props / telescopic steel prop / blue color prop 2.2-4M/thickness 3.0mm System 2
  • Export Scaffold props / telescopic steel prop / blue color prop 2.2-4M/thickness 3.0mm System 3
  • Export Scaffold props / telescopic steel prop / blue color prop 2.2-4M/thickness 3.0mm System 4
Export Scaffold props / telescopic steel prop / blue color prop 2.2-4M/thickness 3.0mm

Export Scaffold props / telescopic steel prop / blue color prop 2.2-4M/thickness 3.0mm

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
1680 Piece/Pieces 1680pcs / 20'FT container pc
Supply Capability:
10000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.     Length 2200-4000mm 

2.     Outer tube diameter 56mm 

3.     Inner tube diameter 48mm 

4.     Tube material : Q235 

5.     Tube thickness  : 3.0mm

6.     weight :  16.6kgs  

7.     square  plate : 120*120*4mm 

8.     Italian type nut 

9.     G-pin 12 

10.    Painted surface 

11.    Color : as customer 's request . red / blue / green / orange/ brown 

 

Packaging & Delivery

Packaging Details:packaging :50pcs / bale container : 1680pcs / 20ft
Delivery Detail:20-30days after receive deposit

Specifications

Adjustable props / construction prop 
Height 2.2-4M 
Italy type painted props 

Adjustable props

Shoring props

Construction scaffold steel prop

Scaffold props

Telescopic steel props 

Product introduce          

 

 

Steel Prop is a labour and time saving device to support shuttering and centering.

It is made outer tube of 60mm (O. D.) & inner pipe of 48mm (O. D.)

or outer tube 56mm (O.D.) & inner pipe 48mm (O.D.)  , 

or outer tube 48mm (O.D.) & inner pipe  40 mm (O.D.)  moving in each other telescopically.

The surface has painted , powder , electric galvanized and hot dipped galvanized .

The height use of props by double staging is recommended upto 7000mm only .

Top and bottom plate are provided with nail holes for wooden beam or steel beam .

The top has square shape , flower shape or U-head , U-fork head .

U-head can use fix or adjustable .

Q:Are steel props suitable for supporting temporary event stages on water?
When it comes to supporting temporary event stages on water, steel props may not be the most suitable choice. Despite the known strength and durability of steel, there are several reasons why it may not be ideal for a stage on water. To begin with, extended exposure to water can cause steel to corrode. Even with proper coating and maintenance, the constant contact with water can lead to rusting and weakening of the steel props. As a result, the stability and safety of the stage can be compromised, posing risks to both performers and attendees. Furthermore, steel props are heavy and may not distribute weight evenly on the water's surface. The additional weight of the steel props can create excessive pressure on the water, potentially causing the stage to sink or become unstable. This issue becomes particularly problematic if the water is not deep enough to support the weight of the stage and props. Moreover, steel props lack the flexibility needed to adapt to the movement and fluctuation of water. Water bodies are prone to waves, tides, and currents, which can exert stress on the stage and props. Because steel is a rigid material, it cannot absorb or adjust to these movements effectively. Consequently, the stability and safety of the stage may be further compromised. Therefore, it is advisable to consider alternative materials that are specifically designed for supporting temporary event stages on water. Materials like aluminum or other lightweight and corrosion-resistant alloys are often preferred because they can withstand the challenges posed by water environments. These materials offer better flexibility, corrosion resistance, and weight distribution, ensuring a safer and more stable stage for water-based events.
Q:What is the installation spacing of the steel support of the tunnel 50mm
Steel tunnel support installation spacing 50 refers to the two steel support installed when the distance between the installation distance of steel arch installation according to the design requirements
Q:Can steel props be used for temporary support during tank installation?
Yes, steel props can be used for temporary support during tank installation. Steel props are commonly used in construction to provide temporary support to structures, such as walls, ceilings, and floors. They are adjustable in height and can be easily installed and removed, making them ideal for temporary applications. When installing a tank, steel props can be used to provide additional support to ensure the tank is stable and secure during the installation process. However, it is important to ensure that the steel props are properly designed and installed by professionals to ensure the safety of the installation process.
Q:What are the maximum and minimum height adjustments for a steel prop?
The maximum and minimum height adjustments for a steel prop can vary depending on the specific model and design. However, in general, steel props are known for offering a wide range of height adjustments to accommodate various construction or support needs. The maximum height adjustment of a steel prop typically depends on factors such as the prop's load-bearing capacity, the thickness and strength of the steel used, and the design of the prop's telescopic mechanism. It can range from several feet to over twenty feet, allowing for significant vertical adjustments to support structures at different heights. On the other hand, the minimum height adjustment of a steel prop is usually limited by the prop's collapsed or retracted length. This is the shortest length at which the prop can be set, and it is necessary to ensure stability and proper load distribution. The minimum height adjustment may vary between a few inches to a couple of feet, depending on the specific prop's design. It's important to note that when using a steel prop, it is crucial to follow the manufacturer's guidelines and specifications to ensure safe and effective usage. Always consult the product documentation or reach out to the manufacturer for accurate and specific information regarding the maximum and minimum height adjustments for a particular steel prop model.
Q:For the deep foundation pit supporting steel purlin supporting scheme of a
Construction sequenceThe pile axis positioning, U type steel sheet pile, steel sheet pile on both sides of steel purlin installed to dig to the bottom, soil structure construction, soil filling, U type steel sheet pile, the extraction of 5 operating baseline determination: Construction of foundation pit construction need to leave Longmen frame fixed axis working face to determine the position of steel sheet pile construction fixed pile position according to the order of the steel sheet pile concrete pile with marked gray line marked the plate pile driving by self vibration type steel sheet pile special mechanical plug
Q:Are steel props suitable for use in the construction of museums?
Yes, steel props are suitable for use in the construction of museums. Steel props provide excellent structural support and stability, making them ideal for handling heavy loads and ensuring the safety of valuable artifacts and exhibits. Additionally, steel props are durable, versatile, and can be easily adjusted or customized to meet the specific requirements of museum construction projects.
Q:Subway construction steel support axial force design value of KN/m, the construction to be converted into MPa, how to calculate?
If:The design of prestress value is 300KNJack cross-sectional area of 0.017671 square metersApply prestress = Design prestress value / Jack cross-sectional area =300/0.017671/1000=1.70MPa
Q:Are steel props suitable for supporting temporary fencing?
Indeed, temporary fencing can be adequately supported by steel props. These props possess great strength and sturdiness, rendering them an excellent option for providing the necessary support. Not only are they capable of enduring heavy loads, but they can also be easily adjusted to the desired height, showcasing their versatility and adaptability to varying terrains. Moreover, steel props boast a long lifespan and demonstrate resistance against weathering, guaranteeing their ability to withstand diverse environmental conditions. In summary, opting for steel props to support temporary fencing presents a dependable and long-lasting solution.
Q:What are the load testing procedures for steel props?
Load testing procedures for steel props typically involve the following steps: 1. Prior to conducting any load testing, it is crucial to visually inspect the steel props to ensure their good condition. Check for any signs of damage, such as cracks, bends, or rust. If any defects are found, the props should be repaired or replaced before proceeding with the load testing. 2. Determine the maximum load that the steel props are designed to support. This information can usually be found in the manufacturer's specifications or guidelines. Select a test load within this range, typically around 75-80% of the maximum load capacity, to ensure the props are not overstressed during the test. 3. Prepare the testing area by clearing any obstacles and ensuring a stable and level surface. Place the steel props in the desired position and secure them firmly to prevent any movement during the test. 4. Gradually apply the predetermined test load to the steel props. This can be achieved by using hydraulic jacks, weights, or other suitable equipment. Monitor the props closely during this process, checking for any signs of deformation or failure. 5. Once the test load is applied, it should be maintained for a specific duration, usually around 24 hours, to evaluate the props' long-term stability and durability. Continuously monitor the props during this time to ensure they can adequately support the load without any signs of failure. 6. Throughout the load testing process, record any observations, measurements, and data collected. After the test is complete, analyze the results to determine if the steel props meet the required load-bearing capacity. Assess any structural deformations or failures that may have occurred during the test and evaluate the props' overall performance. 7. If the steel props pass the load test, they can be considered safe and suitable for use. However, it is important to regularly inspect and maintain the props to ensure their continued reliability. Conduct periodic load testing at recommended intervals to verify their ongoing strength and performance. It is worth noting that load testing procedures may vary depending on specific regulations, standards, or industry requirements. Therefore, it is advisable to consult relevant guidelines and seek professional advice when conducting load testing for steel props.
Q:Can steel props be used in the construction of libraries?
Steel props, which are also referred to as adjustable steel props or steel scaffolding, are capable of being utilized in the construction of libraries. In construction endeavors, steel props are frequently employed to offer temporary support to structures. Their primary function is to sustain substantial loads, rendering them suitable for the purpose of supporting the weight of library structures and the burden imposed by books and other materials. The adjustable nature of steel props enables height modifications, thereby affording flexibility throughout the construction process. In addition, steel props boast durability, resistance to corrosion, and the ability to be reused across multiple construction projects, thereby presenting a cost-effective option. When considering the overall picture, the employment of steel props in the construction of libraries ensures both secure and effective structural support, thereby enhancing the overall safety and stability of the building.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords