• Excavator - SC SERIES - SC270.8LC Excavator System 1
  • Excavator - SC SERIES - SC270.8LC Excavator System 2
  • Excavator - SC SERIES - SC270.8LC Excavator System 3
Excavator - SC SERIES - SC270.8LC Excavator

Excavator - SC SERIES - SC270.8LC Excavator

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
1 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Weight

(T)

26.8

Bucket capacity

(m 3 )

1.1-1.3

Engine model

 

CUMMINS 6BTAAB5.9

Power

(kw/r/min)

133/2000

Fuel tank capacity

(L)

350

Travel speed

(km/h)

4.1/2.5

Slewing speed

(r/min)

10.5

Gradeability

(%)

70

Bucket digging force

(KN)

159

Ground pressure

(KPa)

58.2

Hydraulic pump model

 

K3V112DT

Max. flow

(L/min)

226*2

Work pressure

(MPa)

34.3

Hydraulic tank volume

(L)

246

Excavators are used in many ways:
Digging of trenches, holes, foundations
Material handling
Brush cutting with hydraulic attachments
Forestry work
Forestry mulching
Demolition
General grading/landscaping
Mining, especially, but not only open-pit mining
River dredging
Driving piles, in conjunction with a pile driver
Drilling shafts for footings and rock blasting, by use of an auger or

 

Hydraulic drill attachment 

Hydraulic excavator capabilities have expanded far beyond excavation tasks with buckets. With the advent of hydraulic-powered attachments such as a breaker, a grapple or an auger, the excavator is frequently used in many applications other than excavation. Many excavators feature a quick coupler for simplified attachment mounting, increasing the machine's utilization on the jobsite. Excavators are usually employed together with loaders and bulldozers. Most wheeled, compact and some medium-sized (11 to 18-tonne) excavators have a backfill (or dozer) blade. This is a horizontal bulldozer-like blade attached to the undercarriage and is used for levelling and pushing removed material back into a hole. 

 



Q:what cards do you think i need to add?4xClone4xJwari Shapeshifter4xHalimar Excavator4xAgadeem occultist4xtomscour4xHagra Diabolistwhat else?i want some 1-2 casting cost allies to throw in to make the mill trigger fasterim also considering making it white/blue/blackso i can add the hadda free blade and ondu clericPLEASE HELP???i would like som
you opt for multiple equipment consistent with deck... upload a selection of of stall taking part in cards- killspells (doomblade, homicide, and so on) and a Chalice of life/death may well be a outstanding theory, what in conjunction which comprise your lifelink already happening. Vampire Nighthawk is an amazong card btw. i've got a blue-black mill deck and four of him in it ahaha. inspite of the undeniable fact that by using way of fending off blue, you do understand you're giving up some constructive mill playing taking part in cards... mind sculpt being one among them! And Curse of the Bloody Tomb! And Stern Mentor! yet ah. nicely. stable stable fortune ahaha :P
Q:How much is the tuition fee for Sichuan excavator?
Practice lesson: increase the level and forehand exercises on a monthly basis. Students can basically complete the task of moderate difficulty. The main materials are soil, coal, sediment and soil and rocks that have been pre - loosenedPractice lesson: dig various ways of unloading soil, Lou Ping in various ways, simple slot skills.Theory course: study the whole content of one and a half months, increase the work of hydraulic component, the working principle of hydraulic pump, the fault judgment of engine, the hydraulic principle, the fault judgment of the system, the periodic maintenance of excavator.We provide you with information and information.Theory course: on the basis of a month, increase the hydraulic circuit replacement technology.Practice class: learning a half course, increase the ground leveling, super deep, super wide loading technology, groove mining, climbing downhill, up and down carts, trimming slope repair and use broken technology. After the completion of this stage, students can do special difficulty mining, climbing, walking freely.
Q:I need to build a bridge to open up a pasture. It was be traveled by horses and people. I am thinking of three ways to go about it. 4 concrete footers (2 on each side of the stream), 2 6x6s and several 2x6 for the slats. Or, the same thing but instead of the 6x6s, use steel i bars. And finally, find a culvert and have it put in as the final thought.To give you more information on the setting, the span is about 10 feet long and I would only need it to be about 6 foot wide for this purpose. The water does get pretty high during heavy rain, but never exceeds the banks, even during major floods. Most of the time it is a trickle. Banks are around 4 foot high. I have no idea where I can get i beams or culverts big enough for this gap. Also, not sure what the best method is. Would like to avoid culvert because I would have to contact the township and hire an excavator. A bridge I can most likely do myself.Any ideas are GREATLY appreciated!!
I think your first idea is the best one, but I would say to use 6 concrete supports ( three on each side adding a middle support) because you don't want to have a 6' span of 2X6 material. Take a 1000 pound horse or more than one and you may have a board break as it ages, not to mention that the 2X6's will warp down with moisture and time. So build the supports with 12 concrete tubes, for the frame from side to side I would use a double 2X10 instead of a single 6X6 for the 3 beams you would build, and then either 2X6 or 2X8 on the flat for the deck of your bridge. Considering the water exposure you should use stainless steel screws to join the deck boards down to the frame and TimberLok screws for the framing.
Q:If I met a woman who ran an excavator at a precious metals open pit mine, would she be a gold digger?
LOL, Yeah, but not as bad as the traditional one that is digging through men's pockets.
Q:LOL excavator how to play ah, great God taught some skills
Besides the early damage, your own personal Q or W, AQQEQ is the maximum damage, but not across the stakes, fish can go E, go to arthorn E wall to block your teammates and so on.Keywords: interrupted displacement. W priority excavator is very high, to you on the displacement, the vast majority is interrupted, such as arthorn E, NAR jump (hit fly can't jump), Q E (crocodile fish, with two Q, NAR) the blind, the opposite confident run down. Some of the high-end, you can even make small displacement transfer these non police directly stay around you. The rest is to leave your anger entirely on the opposite side. Blue punishment, look at the situation before giving.Finally, say, as long as you avoid the eye, the opposite is human, not God, can not always be able to prevent you from coming, so that the speed of light escape. As long as it can escape smoothly, the displacement length of the excavator E is difficult to escape.GANK blue side, big frog, F4, stone jump out; GANK red side, on the road slightly, F4, down the frog jumped out. These eyes can hardly be seen. After cutting, it is the art of interrupting movement, and perfect output. If it doesn't die, it's not your problem.
Q:I have a Komatsu PC50 mini-excavator. My worker changed the diesel filter and now it won't start. He says the diesel isn't getting through so perhaps there are air pockets? How would I resolve this issue?
1. Loosen the fittings on the filter to purge air... 2. Lightly ether start engine... 3. Tighten fittings when leaking diesel fuel...
Q:If one excavator can excavate 40 m3/hr, one loader can load 50 m3/hr and one dump truck can haul dump 60 m3/hr?
40 cubic meters per hour only. Even the loader and the dump truck can potentially carry and work more, they're still dependent on the output of the excavator.
Q:How much is the tuition fee for Lan Xiang excavator?
Excavator operation class: one and a half months of the semester, learn the safe operation method and maintenance technology of excavator. Total cost: 3960 yuanExcavator integrated class: two month term, safe operation, Komatsu, Volvo, Carter, Hitachi, Kobelco, Hyundai, Daewoo Sumitomo world brand of excavator and long arm operation, dredging, hammer, dragged down the row of cars maintenance etc..
Q:How much weight can an excavator bear, in the case of its own weight?
The main technical parameters (shovel): weight: 780t maximum power: 2 * 1400kW (3810 horsepower) 40m3 KOMATSU PC8000 KOMATSU bucket capacity: PC8000 PC8000 is the top model Komatsu excavator, diesel driven and electrically driven two forms, using two KOMATSUSDA16V160 (16 cylinder turbo diesel engine or 6600V high voltage) electric (motor power 2900kW) as power, fuel tank capacity 14000L. The main technical parameters (diesel version): weight: 724t maximum power 3000kW (4082 horsepower) bucket capacity: 38m3 BUCYREUS 595 BUCYREUS 595 595B in 1999, it may be caused by the evolution of Marion and 351M, the main arm length is 18.3m. The main technical parameters (595B): 1179t: the quality of the installed capacity of bucket capacity: 64.3m3 BE BIG: BIGMUSKIE MUSKIE BE BIG MUSKIE BE products, the official number is BE-4250W, is by far the largest step dragline, 1967 BE started as an open pit coal mine America built it, until the completion of May 1969 and put into use, the cost of manufacturing was $25 million, specifically for debris peeling. It has 22 stories high, with 13800V high-voltage power, the bucket weight of 209T; 91 years, BigMuskie mined out due to decommissioning, 99 years blasting demolition, only bucket retained. Main technical parameters: whole machine quality: 12258t, total power: 32500 horsepower, bucket capacity: 168m3 (295t)This answer is recommended by the questioner
Q:How do you calculate the amount of backhoe?
The backhoe is the same amount as the forward shovel, depending on the bucket capacity and the fill factor

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords