Excavator - SC SERIES - SC450.8LC Excavator
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Model | SC450.8LC Aerial demolishing machine | ||
Working device |
| 3-section | |
Operating weight | kg | 57500 | |
Max. operating height | mm | 26000 | |
Max. work radius | mm | 14500 | |
Total length in transport | mm | 17200 | |
Total height in transport | mm | 3300 | |
Max. installation weight of accessories | kg | 2000 | |
Engine | Model |
| CUMMINS QSM11 |
Type |
| 4-stroke, water cooling, in-line, top valve, direct injection, turbocharging | |
Power | KW/rpm | 254/1800 |
Excavators are used in many ways:
Digging of trenches, holes, foundations
Material handling
Brush cutting with hydraulic attachments
Forestry work
Forestry mulching
Demolition
General grading/landscaping
Mining, especially, but not only open-pit mining
River dredging
Driving piles, in conjunction with a pile driver
Drilling shafts for footings and rock blasting, by use of an auger or
Hydraulic drill attachment
Hydraulic excavator capabilities have expanded far beyond excavation tasks with buckets. With the advent of hydraulic-powered attachments such as a breaker, a grapple or an auger, the excavator is frequently used in many applications other than excavation. Many excavators feature a quick coupler for simplified attachment mounting, increasing the machine's utilization on the jobsite. Excavators are usually employed together with loaders and bulldozers. Most wheeled, compact and some medium-sized (11 to 18-tonne) excavators have a backfill (or dozer) blade. This is a horizontal bulldozer-like blade attached to the undercarriage and is used for levelling and pushing removed material back into a hole.
- Q: I want to consider digging a hole for the foundation of an addition with crawl space to my home. This hole would have to be at least 4 feet deep for the frost line and would have to be the perimeter of the addition so 40 or more feet depending on how big of an addition. My question is, what are my options for digging this monster hole?I know I can always do the shovel and pickax route. And I know I can rent a mini excavator for about $200 a day from stores. Does anyone have any other inexpensive ways or some creative ideas that I could use to make this job a little easier?
- Buy a bomb and strike it in. Good luck. (Just kidding, hope that you will make really deep hole).
- Q: I need one for the panama canal what brands and models fit the specs. It cant be small it needs to be a medium sized one.
- That is hard to answer without knowing what you are doing with it. What reach do you need? how much weight will it be lifting? are you loading trucks? what size bucket do you need? A 320 Cat is a smaller excavator where a 330 is closer to a medium size excavator. Th next question is what about parts and service? If your on a production job you need to think about parts and service availability. Would you want a contractor to go and do the job? Write me back and I'll see if I can help.
- Q: hi,my bucket movement is really slow when i try to dig but its ok when i load a truck.So i have a problem with the delay of closing the bucket.My machine is a Caterpillar 325B LN ME.I tried to replace the valve of the hydraulic controller but no use.Does anybody think that i must change a seal kit at the bucket cylinder?
- Hydraulic problems are tough to figure out sometimes, but I believe you're right. It sounds like you have internal leaking in the cylinder. Because it shows up under load. Right now it looks like your only option is to tear down the bucket cylinder. If the piston looks good then you could probably get away with repacking it. But if you see scoring on the piston, then have it repaired before repacking. If not than the same problem will show up again real soon. Hope this helps.
- Q: I Bought this along with an other CAT front loader off ebay. I got it for $20 dollars as a bid. I loved the excavator but i never really liked this IHI IS-04.
- its only found on planet Trollzor jk haha trololol payback is a *****
- Q: So when is my new dump truck and excavator going to fall out of the sky and into my lap so I can do gov work?
- Dont worry, u will get your wonderful government job and it will last a full 2 months then the Great One will fire u and everyone else including me lol
- Q: I was so curious, what is the best substrate that you can purchase for Bearded dragons that is easy to clean and not very expensive? I know that sand is the last thing to put in the tank. But i have heard of Repti Carpet. What is that and if you know can you give me some details? Plus what is a Repti hammockgt; What is it used for? Should I get one? Please answer these and remember you guys are saving my life one anwser at a time!
- This is the question that everybody asks me, Don't go with Repti-Carpet, it has tiny holes usually on the sides which means the nails will get caught and have seen toes come off because of it. i use Excavator Clay its good for desert Species and can be molded into land scape's by just adding water, just make sure it drys fully before putting bake your Bearded dragon, hope this helps!!!!!
- Q: How much is the tuition fee for Lan Xiang excavator?
- Total cost: 4750 yuanExcavator maintenance class: semester three months, learning excavator, loader working principle, hydraulic, transmission, mechanical, circuit system maintenance technology. Total cost: 9980 yuanLoader operation class: semester a month, learn the safe operation of loader and driving, structure, working principle and so on maintenance technology. Total cost: 3760 yuanCar crane class: semester a month, learn the safe operation of car crane, cargo lifting, maintenance and other technologies. Total cost: 4660 yuanRoller operation class: semester a month, learning roller operation and structure, working principle and maintenance technology.
- Q: Which excavator school in Shijiazhuang is good?
- Theory course: study all the courses for three months, increase the daily maintenance of the loader, periodic maintenance, operation principle and so on.Practice lesson: on the basis of three months, increase the learning method of special groove mining (round arc groove), the loading technology of ore and the operation of loader.Loader operation major1) loader operation (30 days shift)Study of loader working principle, and daily maintenance and maintenance of engine principle, loader, road loading, unloading, loading truck, walking, slope and driving skills.2) loader operation (60 days shift)Learning all courses of junior class and engine maintenance, hydraulic system fault diagnosis and elimination and practice operation, demolition of high-rise buildings and underground mines, tunnel operation technology.Crane operation professional semester a month to learn the working principle of tower crane, driving operation technology, routine maintenance and troubleshooting.
- Q: Where in san antonio can I get some free dirt. I need like 2 dump truck loads. I will be using it for dirt bike jumps. Thank You for your help.
- check with swimming pool excavators, sometimes they are looking for a good place to dump where they wont have to pay
- Q: Im 17 years old and im looking for employment just somewhere simple that any kid in highschool would work.this is the first resume i've ever written and i was just looking for some feedback and advice for areas of improvement. basically what i want to know is if you were a hiring manager and you looked over my resume would you call me in for an interview?
- Looks way better than my resume at age 17 I tell you that. Here are some suggestions Make your experience description in bullet points similiar to your volunteer and interests. Use action verbs like initiated, lead, pursued.. words that show you are proactive. For example: Construction: - Activity 1 (construction of roofs, floor, ....) - Activity 2 (cleared forest vegetation....) - Responsiblity 1 (list if you had any) - Projects finished 1 (cleared entire section of forest, finished an entire house.. etc..) Do this for each place you have worked. Also, make sure you list your most recent experience at the top because employers will want to see them first. The lines about able to stand for hours, work well alone or with others, motivated, etc.. You can remove them and put it a cover page if you have one. Because they sound cheezy and the fact that EVERYONE says that. Most employers don't even read them. Your objective should be focused. Not bus management, or culinery arts, or retail. Pick one depending on your employer, you should focus on one. This way your resume will seem more directed at the position, rather than a generic resume that you mass produce.
Send your message to us
Excavator - SC SERIES - SC450.8LC Excavator
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords