• Drywall Steel Profiles Channel Building Materials System 1
  • Drywall Steel Profiles Channel Building Materials System 2
Drywall Steel Profiles Channel Building Materials

Drywall Steel Profiles Channel Building Materials

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
7000 pc
Supply Capability:
100000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Introduction:


Drywall Metal Profile

 Drywall ceiling Channel is galvanized metal structure  used in non-bearing partition systerm .

Drywall steel frame system is a popular way to be used to divide the space,especially using in commercial buildings.

Drywall Steel Frame System is made of galvanized steel sheet with good rust-Proof function.A variety of frames are ready for customers' demands and designers' choice for different purposes and places. One of our merits is the special hole for channel on C-stud in per 6Ocm which is easy for workers to install the electric lines and water tubes.CH and IH type of studs are the special type we developed to solve the hard work situation in elevator ventilator and offer a better protection of workers' safety.

Our dry wall steel frames are covered with magnesium fireproof boards and fulfilled with material which is heat insulation and noise-proof mineral wool between two layers of boards. It will create a better living environment than the traditional building materials.

Suspension ceiling structure,Galvanized metal structure which is the vertical metal framework used in non-bearing partition system.


Specification

commodity

size (mm)

thickness (mm)

length (mm)

pack

Australia system

Primary cross rail

25*21

0.55, 0.75,0.85,1.0

3600, 4800

10

Furring channel

28*38

0.55, 0.75,0.85,1.0

3000,3600,4800

25

Wall track

26*16*26

0.45,0.55,0.75

3000

20

Angle

30*30

0.55, 0.75

3000

50

Stud

51*35.5

0.55, 0.75

2400,3600,4800

10


64*35.5

0.55, 0.75

2400,3600,4800

10


76*35.5

0.55, 0.75

2400,3600,4800

10


92*35.5

0.55, 0.75

2400,3600,4800

10

Track

51*32/50

0.55, 0.75

3000

10


64*32/50

0.55, 0.75

3000

10


76*32/50

0.55, 0.75

3000

10


92*32/50

0.55, 0.75

3000

10

Middle East system

Main channel

38*12

0.45,0.50,0.60,0.80,1.0

2400,2950,3600

20

Furring channel

68*35*12

0.40,0.45,0.50,0.60

2400,2950,3600

25

Edge channel

25*25

0.35,0.40,0.45,0.50

3000

50

Stud

50*34.5

0.40,0.45,0.50

3000,3600,4800

10


70*34.5

0.45,0.50,0.60

3000,3600,4800

10


75*34.5

0.45,0.50,0.60,0.70

3000,3600,4800

10


100*35

0.50,0.60,0.70,0.80,1.0

3000,3600,4800

10

Track

52*25

0.40,0.45,0.50

3000,3600,4800

10


72*25

0.45,0.50,0.60

3000,3600,4800

10


76*25

0.45,0.50,0.60,0.70

3000,3600,4800

10


100*25

0.50,0.60,0.70,0.80,1.0

3000,3600,4800

10

East Europe system

CD

60*27

0.40,0.45,0.50,0.60,0.80

2800,3000,3600

12

UD

28*27

0.40,0.45,0.50,0.60,0.80

2800,3000,3600

20

T-type keel

20*6

0.35,0.40,0.45

2400,3000,3600

50


24*10

0.35,0.40,0.45

2400,3000,3600

50

Stud (CW)

50*50

0.40,0.45,0.50,0.60,0.80

2800,3000,3600

10


70*50

0.40,0.45,0.50,0.60,0.80

2800,3000,3600

10


75*50

0.40,0.45,0.50,0.60,0.80

2800,3000,3600

10


100*50

0.40,0.45,0.50,0.60,0.80,1.0

2800,3000,3600

10

Track (UW)

52*40

0.40,0.45,0.50,0.60,0.80

2800,3000,3600

10


72*40

0.40,0.45,0.50,0.60,0.80

2800,3000,3600

10


75*40

0.40,0.45,0.50,0.60,0.80

2800,3000,3600

10


100*40

0.40,0.45,0.50,0.60,0.80,1.0

2800,3000,3600

10 

 

 


 
Advantages and features:

1. Galvanized Steel Profiles raw material is high quality hot dipped zinc galvanized steel strip, absolute damp proof , heat insulation and high durability , high rust resistance.

2. Hot dipped zinc galvanized steel strip zinc coating is 60-180g/m2.

3.Warm sales in Middle East , Africa , AustraliaMalaysia ,and America , which have enjoyed an excellent reputation with high quality and services.

4. The specification can follow up customer requirements.

5. Advanced equipment can make sure exactly size, high quality products.

6.High quality cold rolled continuous hot galvanized plate as raw materials which makes sure it is anti-corrupt and anti-rusty

7.drywall steel profile adopts excellent manufacture equipment,advanced production process, scientific and detecting method.                

 8. Steel profile has beautiful surface, medium hardness! Good quality *competitive price large quantity *honesty *good after-service

Certificates  ISO 9001:2000 Quality management system

 

 FAQ

1.Sample: small sample can be offered by free

2.OEM: OEM is accepted

3.MOQ: small order is ok

4.Test: any third party is accepted to test

5.Factory: Can visit factory any time

6.Delivery Time: small order is within 7days or according to your order


Q: Shanghai light steel keel ceiling, wall quotes
Depends on the use of good and bad materials. Ordinary ceiling also 30-40, partition 35-45, I was doing this is what the project. Can contact me. Offer
Q: Shanghai light steel keel ceiling wall how much labor costs?
If you buy materials to make people do not directly specify the material model specifications, directly called light steel keel, specifically do fast and good.
Q: Gypsum board partition wall how to sound insulation
Close the gypsum board to install the keel, filled with rock wool in the keel, and then use the gypsum board with a screw on the keel, you can achieve adequate sound insulation. If you want a better sound insulation, you can use thicker gypsum board.
Q: How to install light steel keel gypsum board wall
Gypsum board installation, should be used in vertical arrangement, keel gypsum board should be wrong on both sides. Gypsum board and keel can be fixed with self-tapping screws. 12mm thick gypsum board with 25mm long self-tapping screws; two 12mm thick gypsum board with 35mm long self-tapping screws. Self-tapping screws from the edge of the gypsum board should be at least 10 mm in the board edge of the paper, at least 15 mm in the cut edge of the board. The screw cap should be buried inside the board, but no damage to the paper. Self-tapping screws from the center of the board should be 250mm, in the middle of the board should be 300mm.
Q: Light steel keel wall and wood which low cost
Should be a wooden keel, the general family decoration with a wooden keel on it, wood keel cost is low, to meet the family use, light steel keel cost high, but high strength. It is recommended to use wood keel
Q: 100 square light steel keel wall how many pieces of heaven and earth keel
Heaven and earth keel accurately depends on the length of the wall, the dragon than the dragon multi-hole size. Usually can be doubled the length of the wall to remove the door. Vertical spacing is usually 400, the door has to strengthen the vertical keel, wearing a keel to see the height of the wall, you can 1, but also two. Depending on the specific design. If the height of 3m, heaven and earth keel to 67m-several door size.
Q: Can the gypsum board be painted on the wall
If the light can be linked to the screw with a self-tapping screw, hanging 2-3 kg should be no problem
Q: I would like to have a toilet in the house, bathroom with mineral wool board cut off or light steel keel gypsum board line?
The walls of the bathroom must be waterproof and moistureproof, or it will be deformed and affect life. And the bathroom wall to do the waterproof treatment, or the toilet to the area of water and more will then penetrate the other side of the wall.
Q: Light steel keel partition wall construction process is what
Light steel keel partition wall - → installation of the door hole box - → installation along the top keel and along the keel → vertical keel sub-file - → installation of vertical keel - → installation of horizontal keel card - → installation panel - Sewing practice - → face layer putty paint (or paint).
Q: Light steel keel gypsum board partition wall construction practices and construction process What is the difference?
The practice is to first play on the ground and shed on the corner keel must be vertical after the installation of the main keel times the keel installed in the plaster board plaster brush latex paint difference is stronger than the keel cost is higher than the wood keel

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords