DN200 Spectacle Plate for SANY Concrete Pump
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 1000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Product Name: DN200 Spectacle Plate for SANY Concrete Pump
1. Specification
Size | DN200, DN230,DN260 |
Material | tungsten carbide, Q235B steel, Vautid-150 electrode imported from Germany |
Lifetime | 30,000-80,000cbm |
Carbide HRA | > 86 |
Electrode HRC | > 63 |
Type | hardfaced, tungsten carbide and 7 shape tungsten carbide |
Application | mud pump, shotcrete,trailer and truck mounted concrete pump |
Manufacturer with competitive price |
We are leading manufacturer for concrete pump wear plate, S valve and other wear parts in the hopper for more than 8 years, with high quality and competitive price, all kinds of brand you can find from us, such as PM, Schwing, Sany, Zoomlion, Cifa, Sermac, IHI, Niigata, Mitsubishi, Kyokuto, KCP, Jacon, Elba...etc.
OEM service is available, products can be produced as buyer's drawing or samples.
At the same time, we also sell following parts with good quality and competitve price:
Leading manufacturer for all kinds of brand concrete pump wear plate, technical date as below
Technology | Technical Standard | Service Life | Hardness |
Atmosphere sintering process | SY5064-85 | 5 times more than similar traditional product | HRC>70 |
Tensile Strength | Fracture Toughness values | Yield Strength | |
>1000Mpa | 10 Mpa1/2 | >1000Mpa | |
Substrate/Matrix Material | Bending Strength | High Temprature Resistance | Surface Roughness |
45#,40Cr, 1Cr13 steel | 1100-1300 Mpa | 700-800 centigrade degree | Ra<0.1< td=""> |
Bond Strength | Corrosion Resistance | Compactness | |
>110Mpa | >95% | Gas Hole Ratio<0.01%< td=""> |
2. Application
Spare parts for mud pump, shotcrete,trailer and truck mounted concrete pump
3. Package
Plastic bag and carton box, also according to your requirements |
FAQ:
Q1: Why buy Materials & Equipment from OKorder.com?
A1: All products have its ISO certifications, adheres to the highest standards and a commitment to supply chain safety and customer satisfaction.
Q2: How do we guarantee the quality of our products?
A2: We have established an advanced quality management system which conducts strict quality tests at every step, from raw materials to the final product. At the same time, we provide extensive follow-up service assurances as required.
Q3: How soon can we receive the product after purchase?
A3: Within three days of placing an order, we will begin production. The specific shipping date is dependent upon international and government factors, but is typically 10 to 30 workdays.
Q4: If we can produce DN200 Spectacle Plate for SANY Concrete Pump according to customers request?
A4: Yes, we can produce DN200 Spectacle Plate for SANY Concrete Pump according to the difference country situations to make it suitable to the market and customers. We have very professional technical team to make the design.
Q5: How to make a quick resolution for after service?
A5: We have overseas branches all-around of world, If needed, the seller shall dispatch 2 engineers to the buyer's site for supervision of training. The buyer shall make available of necessary facilities &skilled personnel at site for training.
Images:
- Q: There are 6 pumps, two indoor fire hydrant pumps, two spray pumps, two outdoor pumps, three units, one master and one spare control cabinet. From the control room to the control cabinet, is there only 3 lines or 9 lines?... How do I get it? Where does the hydrant line come from?
- Spray pump in addition to remote direct Kai, there are modules to start function, that is, on the cabinet to add control module, bus linkage pump, in addition to the pressure switch, directly pumping function, a total of three functions.
- Q: Does vacuum pump oil belong to dangerous goods?
- Of flammable substances, but not included in dangerous goods!Does not belong to dangerous goods,
- Q: The main factors affecting the performance of centrifugal pumps
- Revolutions required to have. It has the following meanings: 1, similar to the geometry of centrifugal pump, everywhere efficiency at the top of the similar condition; centrifugal pump 2, than the number of different, its geometry must be different than the number; the same pump, its shape is similar, but does not rule out the shape similar situation. The following factors are related to specific speed. The specific speed of centrifugal pump has nothing to do with the nature of the conveying fluid, but has a close relationship with the shape of the impeller and the performance curve of the pump. The pump with high specific speed corresponds to the highest efficiency when the flow rate is large and the head is small
- Q: Rules for operation of centrifugal pumps
- 3, start the pump, wait until the speed reaches the normal speed, slowly open the outlet valve, observe the ammeter at the same time, and control the current in the rated current range of the motor.4, the operation requires smooth operation of water pumps, no abnormal noise, no pressure fluctuations. The abnormal situation should be stopped in time.
- Q: Pump operator's responsibility 10Sharing the rules, responsibilities, etc..
- 1., consciously abide by the traffic control department management rules, to achieve civilized driving, safe driving.2. responsible for the daily maintenance, cleaning and cleaning of the pump truck, and ensure the equipment is in good condition.
- Q: Is the flow meter in front of the pump or after the pump?
- After the flowmeter is placed in the pump, it is better to add a pressure tank or a buffer tank, so that the flow meter will work better
- Q: What's the word "pump"? Is that what advocates mean?RT
- Is generally believed that the "wholesale" is the "hoarding" of "hoarding" variant, can be used to replace the word "store". And "wholesale" compared to "store" is clearly better and better recognize, because the "store" is a phonogram, hoard shaped characters "mouth", said the biggest the range of aggregation, like a grain bin; "Tun" is also phonetic, semantic. Tun, originally refers to the grass speared out of shape, with curly tails, and gathered the meaning.In this case, the "fans" can be written as "Yong Tun". But this is also troublesome, because the "store" in addition to read "Tun" (Ping Sheng), another pronunciation of "Dun" (Qu Sheng), who said food utensils, when we had the "Valley" store. So, if the "fans" to "hold", is also wrong. "Bin Zhao Wei fans" although it sounds strange, but at least not ambiguous; if changed to "Zhao Wei", is that we have to hoard may hear "Zhao Wei" or "Zhao Wei hold hip", hold the shield this is not the more the more chaotic change it!It is suggested that the "fans" to "fantastic", the modified method was acceptable. In modern Chinese, "public" does not necessarily mean that many, can also refer to a single. "One of the masses", "one of the audience (or audience)" this kind of argument, has been about good. Since this kind, we say "a fantastic" what not? "Fantastic" at least than the "fans" straightaway. The problem is, the word and Hong Kong Standards, there is no "fantastic".
- Q: How many concrete pump tube diameter
- High pressure is the outer diameter is Phi 140 Type 150 type low pressure pipeline; pipe diameter is Phi 159 pipeline, high pressure pipeline diameter is phi 168.
- Q: What's the difference between a centrifugal pump and a centrifugal pump? What are they used for?
- As the name suggests, centrifuges are machines that achieve centrifugal effects by centrifugal action. And you say the centrifugal pump is only specific, and the same as the pump
- Q: What are the failures and causes of the replacement of the fuel pump assembly?
- Failure cause:1) the gasoline pump is too thick with the gasket at the junction of the axle box.2) pump film rupture or pump film and pump shell combination of sealing is not strict.3) the oil inlet valve is stuck or sealed badly.4) severe wear of the rocker arm, reducing the pump film stroke.5) the pipeline from the gasoline tank to the gasoline pump is not smooth, or the pump film spring passes.
Send your message to us
DN200 Spectacle Plate for SANY Concrete Pump
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 1000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords