Spectacle Plate for Niigata Concrete Pump DN205
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 1000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Product Description:
Product Name: Spectacle Plate for Niigata Concrete Pump DN205
1. Specification
Size | DN205,DN220 |
Material | tungsten carbide, Q235B steel, Vautid-150 electrode imported from Germany |
Lifetime | 30,000-80,000cbm |
Carbide HRA | > 86 |
Electrode HRC | > 63 |
Type | hardfaced, tungsten carbide and 7 shape tungsten carbide |
Application | mud pump, shotcrete,trailer and truck mounted concrete pump |
Manufacturer with competitive price |
2. Application
Spare parts for mud pump, shotcrete,trailer and truck mounted concrete pump
3. Package
Plastic bag and carton box, also according to your requirements |
FAQ:
Q1: Why buy Materials & Equipment from OKorder.com?
A1: All products have its ISO certifications, adheres to the highest standards and a commitment to supply chain safety and customer satisfaction.
Q2: How do we guarantee the quality of our products?
A2: We have established an advanced quality management system which conducts strict quality tests at every step, from raw materials to the final product. At the same time, we provide extensive follow-up service assurances as required.
Q3: How soon can we receive the product after purchase?
A3: Within three days of placing an order, we will begin production. The specific shipping date is dependent upon international and government factors, but is typically 10 to 30 workdays.
Q4: If we can produce Spectacle Plate for Niigata Concrete Pump DN205 Good Quality according to customers request?
A4: Yes, we can produce Spectacle Plate for Niigata Concrete Pump DN205 according to the difference country situations to make it suitable to the market and customers. We have very professional technical team to make the design.
Q5: How to make a quick resolution for after service?
A5: We have overseas branches all-around of world, If needed, the seller shall dispatch 2 engineers to the buyer's site for supervision of training. The buyer shall make available of necessary facilities &skilled personnel at site for training.
Images:
- Q: Fire hydrant pump button, under what circumstances do not need to install?
- There are four things to do:Fire hydrant button to meet the requirements of national standards.In addition to pumping, it can show the location of fire.
- Q: What are the internal losses in centrifugal pumps? How did they come about?
- Volume loss: loss due to leakage;3. mechanical loss
- Q: What are the important parameters of the pump?
- Because the lift refers to the effective energy, pump output unit of heavy liquid obtained from the pump so that the product of head and the mass flow rate and acceleration of gravity, is the effective energy output from the pump in unit time of liquid -- effective power pump:Pe= P gQH (W) = QH (W)In the p - density of liquid pumping (kg/m3);Gamma - pump heavy liquid delivery (N/m3);Q - pump flow (m3/s);H - pump lift (m);G - gravitational acceleration (m/s2)The shaft power P and effective power Pe is the difference of power loss in the pump, the size of the pump efficiency to measure the efficiency of the pump. As the effective power and shaft power ratio, with ETA said.
- Q: What does "efficiency" mean in a water pump catalog?
- Pump efficiency: the ratio of the effective power and the pump shaft power
- Q: Operating procedures for measuring pumps
- Pressurization(1) for the discharge pressure below 2.0MPa, then the pump stroke length should gradually increase, each increase of 20%, to maintain 15 minutes.(2) for the discharge pressure greater than 2.0MPa, you need a special pressure, to ensure that the pump discharge pressure gradually increased, each time for the final row pressure of 20%.(3) when the pressure is not increased, the stroke of the pump is gradually increased by 20% strokes per time.Note (1) when pressure is applied, the pressure gauge should be observed at the side of the loading side (slow motion)(2) check ammeter, forbid overload
- Q: What is the function of the heating pump system for the water pump design?
- Will cause some of the internal friction gap disappeared, the coupling center damage. In this case, starting the pump inevitably results in vibration, friction, etc.
- Q: Water pump spoon pipe for power plantWhich hero can tell me what is the water pump spoon tube ah? And its role
- The spoon pipe is not a feed pump, but also is an adjusting oil inlet device of a hydraulic coupler matched with a feed pump
- Q: What are the conditions required for hydraulic pumps to complete oil absorption and compression?
- Volume conditions: oil absorption cavity from small to large, complete oil absorption, oil pressure chamber has become smaller, complete pressure oil.Sealing conditions: the hydraulic pump itself should have good sealing
- Q: Why does the centrifugal pump start with a closed valve and the axial pump starts with an opening valve?
- Because the characteristic curves of the two are different.The power of centrifugal pump decreases with the decrease of flow rate. When the flow rate is zero, the power is minimum, so the centrifugal pump is started with a closed valve.
- Q: Metering pumps related matters
- Rotate to stroke length 100% position. This allows the kit to rotate to the back of the drain hole and align the bottom of the pump. Adjust the hydraulic end and diaphragm to the proper position during the pump operation.The duration of the pulse may not be long enough for the reaction time. With respect to the standard pulse width 80msec, the flow monitor pulse width expansion can be activated, increasing the pulse width to 300msec. Activate the smart switch, remove the cover fixed circuit board, remove the jumper X-1. This activates the extended function and allows more time before the failure instructions.Metering pump installed from the exhaust pump head, the use of self suction liquid imbibition. Keep the suction line as short as possible.
Send your message to us
Spectacle Plate for Niigata Concrete Pump DN205
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 1000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords