• Cuplock System Scaffolding Cuplock Scaffolding System for Construction System 1
  • Cuplock System Scaffolding Cuplock Scaffolding System for Construction System 2
Cuplock System Scaffolding Cuplock Scaffolding System for Construction

Cuplock System Scaffolding Cuplock Scaffolding System for Construction

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 kg
Supply Capability:
100000 kg/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Packaging & Delivery

Packaging Detail:pallet or bulk according to customers' requirment
Delivery Detail:Within 15-25days after receiving the advanced payment


Specifications

Best price cuplock scaffolding 
Good bearing capacity . 
Used time long . 
Very good stability . 
Covenient to transport

Cuplock Scaffolding

1.have our own factory (reasonable price)
2.Good bearing capacity 
3.Stable& durable 
4.Easy to assemble or dismantle

  

 Specification 

Product name

Cuplock scaffolding

Components

standard ,ledger,diagonal , top cup, bottom cup,

Ledger Blade

Material

Q235/345/195

Surface

galvanized, Hot dip galvanized, Painted

color

red paint, blue paint, yellow paint, green paint, bright galvanized

size

Steel pipe diameter is 48.3mm

Thickness :2.75/3.0/3.2/3.25/4.0mm

standard Length:0.5/1.0/1.5/2.0/2.5/3.0M

Ledger length:0.6/0.9/1.0/1.2/1.5/1.8

usege

Our products are used widely in bridge, tunnel, petrifaction, shipbuilding, railway, airport, dock industry and civil building etc

Packing

Bulk or Bundle with steel strip


Size

StandardLedgerDiagonal
Ø48.3×3.25Ø48.3×3.25Ø48.3×3.25
Q345Q235Q235
Size/mmWeight/kgSize/mmWeight/kgSize/mmWeight/kg
5003.456002.541300×20009.21
10005.589003.61800×200010.31
13007.9710004.12500×200012.16
15008.7412004.7

180010.612505

200011.3813005.2

25001416006.3

300016.6318007



25009.54


Q: Attached to the lifting scaffolding installation site how to write
All threaded connections nuts have been tightened.It should be removed from the live construction load have been evacuated after.
Q: Please tell me which book is on the way. Then in the specific description of the horizontal spacing, vertical spacing and step how to distinguish between a little confused
The design of the construction organization. Vertical rod spacing: the vertical spacing of the scaffolding pole, single row of scaffolding for the distance from the axis to the wallDistance: the distance between the upper and lower horizontal axis of the scaffold.That is the equivalent of a cube of length and width and height.
Q: The amount of bowl buckle scaffolding, know the area of 50000m2, height 6m, how to calculate the number of posts with the root, the number of bowl buckle on the number of how many?
Unable to determine pitch and step reference 0.6m and 1.0m
Q: Ok so 3 days ago (4 tomorrow), i got a scaffold piercing, AKA an industrial, and it was fine up until today when i noticed a small build up of clumpy, very dark, blood around the second hole of it. I cleaned it off and it stayed ok for a few hours and now i think it's coming back! it itches a bit, but when i asked my older brother (who has several piercings) he said it was starting to heal and that it's common. also, the woman who pierced my ear (who also has several facial piercings and 2 scaffolds) said it would definetly bleed during the 6-8 weeks it takes to heal.i was just wondering why the blood is so dark and thick, and why it itches when the blood is there.this is the first piercing i've had since my earlobes as a child, so i don't really know much about them :/ help please!!!!!
I had the same thing happen, my ear was pretty much in shock the first three days, then the 4th day it was like F-YOU! It was not fun. the build up isn't bad, it means that the blood is flowing that the piercing is trying to heal itself, get a q-tip good and soaked in rubbing alcohol or spray some H2Ocean on it. (They should have sold you some at the parlor you went to, if not, go back and buy it, it is a god send. It cools and disinfects the area.) thoroughly soak down the little crusties and let them come off on their own. DO NOT USE YOUR FINGERS and DON NOT TWIST THE BARBELL. this will promote skin growth and you can get a Keloid, which is a small ball of scar tissue. if your fingers go any where near your piercing you should rinse them in rubbing alcohol first. the itching is probably just a reaction to the crusties being there. Soak the crusties off and try not to touch it or sleep on that side of your body and it should be OK.
Q: What is the bowl buckle scaffold, bowl buckle scaffold what are the characteristics?
Main componentComponent for forming the main body of a scaffold. The vertical rod and the top rod are respectively provided with two kinds of specifications, and both sides of the rod are welded with a lower bowl buckle with a spacing of 600mm. If the vertical rod and the ejector rod are matched with each other for long use, the utility model can form an arbitrary height scaffold. Take a long pole, the joints should be staggered, the top layer and then leveling rod length two.
Q: A window washer is standing on a scaffoldsupported by a vertical rope at each end. Thescaffold weighs 145 N and is 3.02 m long.Assume the 675 N worker stands 1.28 m fromone end of the scaffold.What is the force on the rope farther fromthe worker?Answer in units of NWhat is the force on the closer rope?Answer in units of N.
Analyzing the force diagram Forces in the Upward direction:...T1,T2 (tension of the ropes) Forces in the Downward direction...M1g (scaffold), M2g (man) Fnet = 0 T1 + T2 = M1g + M2g Analyzing the moments about the center T1 is nearest man T1(1.51) =M2g(1.51 - 1.28) + T2(1.51) T1 + T2 = (675 + 145)= 820 T1 - T2 = ((675)(1.51 - 1.28))/1.51 = 102.81 sum the two equations 2T1 = 922.81 T1 = 461.5 N T1 + T2 = 820 T2 = 358.6 N
Q: Steel pipe scaffolding scaffolding which components? Double row scaffolding and row spacing, step length, spacing and wall fixed spacing is generally much
2.1 divide the material according to the bar1) single specification steel pipe scaffold. It only uses a steel pipe specifications, such as steel tubular scaffolding, welded steel pipe using only 48 * 3.5.2) a variety of specifications of steel pipe scaffolding. The utility model is composed of two or more steel pipes of different specifications, such as a door type scaffold.3) steel tubular scaffolding. As to the steel pipe, and combined with other type of steel pieces composed of scaffolding, such as the channel has a base in the backwater or scaffolding, connecting steel scaffolding and so on.
Q: So today I decided to get both my tragus' done, a top cartlidge piercing and a scaffolding piercing in one sitting and now I'm in agony and the only aftercare I was given is a tiny bag of rock salt.... SALT!?Any ideas on how to get the swelling down / pain to go away and any tips on how to reduce the chance of getting them infected?
Okay I have my tragus and my cartlidge pierced. I got those two in one sitting, which I regret because the healing process was HORRIBLE. For surely you should ICE them! A LOT! It helps so much with swelling. Also, they should have given you anti-bacterial stuff.. Use that as often as possible! And also remember to move the jewelry around so it doesn't get all crusty and stuck... Good luck!
Q: The first scaffold scene is when Hester and Pearl are up there in front of the public.The second scene is with Dimmesdale, Hester, and Pearl at night. The stars create an quot;Aquot; in the sky.The third scene is in public again but with Dimmesdale and he dies.
the first is puritanistic because of public humiliation and romanic because pearl notices her father at such a young age. the second because they are together as a fam(puritans did not belive in individualism) and romantic because the stars make an A in the sky. the third because of public confession and dimmesdale dies
Q: Bridge formwork support bowl button steel scaffolding, you need to set the floor bar?
Sweeping rod: part of the scaffolding works, sweeping rod distance from the ground 200mm, connecting the vertical pole of the horizontal rod. Divided into vertical and horizontal sweep rod, play the role of scaffolding stability.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords