Cup Lock System scaffolding for Construction
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 10000 pc
- Supply Capability:
- 10000 pc/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Quick Details
Model Number: | HT-S / HT-SH | ||||
Material: | Q235 | Certificate: | ISO9001:2008 | Surface finish: | Painting,galvanized |
Pipe Size: | 48x3mm(thickness) | Colour: | orange,Silver | Package: | Bulk / Bundle / Pallet |
Packaging & Delivery
Packaging Detail: | In carton or in bag |
Delivery Detail: | 25 days |
Specifications
Cuplock Scaffolding
Material:Q235
Certificate:ISO9001:2008
H frame scaffolding
Suface:Painting,galvanized
MODEL | FRAME PIPE | LENGTH | WEIGHT |
HT-S1 | 48X3(TH) | 1,000mm | 7.40kg |
HT-S2 | 1,500mm | 9.12kg | |
HT-S3 | 2,000mm | 13.02kg | |
HT-SH1 | 600mm | 3.41kg | |
HT-SH2 | 900mm | 4.44kg | |
HT-SH3 | 1,200mm | 5.37kg | |
HT-SH4 | 1,800mm | 7.23kg | |
HT-SH5 | 2,400mm | 9.10kg |
Basic Information
Product/Service (We Sell): | Shoring prop,Scaffolding,Formwork,Scaffolding coupler,Jack base U-head jack | |
Number of Employees: | 51 - 100 People |
Trade & Market
Main Markets: | Southern Europe Southeast Asia Western Europe South America Africa South Asia North America Mid East | |
Total Annual Sales Volume: | US$10 Million - US$50 Million | |
Export Percentage: | 91% - 100% |
Factory Information
Factory Size (Sq.meters): | 5,000-10,000 square meters | |
Factory Location: | T | |
Number of Production Lines: | 2 | |
Number of R&D Staff: | Less than 5 People | |
Number of QC Staff: | Less than 5 People | |
Management Certification: | ISO9001 | |
Contract Manufacturing: | OEM Service Offered |
- Q: If you have two workers say standing on a scaffolding, their are downward forces from the weight of the workers along with the weight of the scaffold, and upward forces from tension suspending the scaffolding in place. The opposite forces add to zero and thus the scaffolding remains at rest.My question has to do with what would occur if more/less workers were on the scaffolding. It appears to me that the scaffolding would always remain at rest. Would there always be a ΣF=0 regardless of the amount of workers? As the decreases in weight from removing a worker would also cause the tension force to be weaker? And vice versa if there were more workers?I
- You are correct so long as the scaffolding is not allowed to move. I.e. the cables suspending it are locked and not unwinding from their spools as more workers get on. More weight added would necessarily increase the tension in this type of case. However, if, when another worker got on and the tension could not increase for what ever reason, a downward acceleration would take place that is proportional to the worker's weight. Hope that clears things up.
- Q: Which God can tell me what is required, how to get ah?
- The same height of the building to be calculated separately, and ultimately is to pay attention to security, you can look at the yuan Tuo mall information on this aspect is still a lot of
- Q: What is a bar in the scaffold
- Scaffolding in the cross section of the large cross bar, small cross bar.Large cross - vertical horizontal bar, which is located along the vertical axis of the scaffolding rod.A small transverse rod, a horizontal rod, which is horizontally arranged along the scaffold.
- Q: Find the demolishing scheme of scaffold
- Removal methodThe development of the demolition plan, the program should include the removal of the steps and methods, safety measures, etc.. Demolition order should be observed from top to bottom, the first after the demolition, after taking the first demolition principle. That is, first remove the railings, scaffolding, scissors support, diagonal bracing, and then small beams, large cross bars, vertical poles, etc., and according to the principle of one step clear in order to be prohibited from top to bottom at the same time the demolition work. Remove the shelf of the high-altitude personnel should wear safety helmet, safety belt, wear soft shoes on the shelf, at the same time, around the railing or set up a warning sign and a special command, in order to avoid casualties.
- Q: 21M high full scaffold erection scheme
- dismantle4.1 the accurate preparation before dismantling the scaffold shall comply with the following requirements:1 should be a comprehensive inspection of the scaffold fastener connection, even wall pieces, support system is in line with the requirements of the structure;
- Q: by scaffolding ?
- I'm guessing it is a reference to large breasts. But I could be wrong.
- Q: At 16 I took my bros 16 gauge piercing needle and pierced my left cartilage and it didn't hurt at all.... and I have a tattoo as well and I laughed through it. So pain isn't huge when it's a small amount.
- Gosh Industrial do hurt I'm not going to lie. Cartilage piercings don't hurt. But industrials are really hard to take care of. If you can handle pain then get it. They're worth it but they do hurt.
- Q: What are the requirements for the construction of the scaffolding structure?
- One of the platforms has access to the lower part of the scaffolding structure. The scaffold structure also includes a ladder that is mounted to the scaffold for the worker to pass through the opening. And the scaffold structure comprises a fixed to additional bamboo grid frame, the frame of the gate is composed of an outer bearing component and a bamboo piece composed of bearing components within the compartment is smaller than the grid spacing
- Q: i am getting my industrial (scaffold) pierced on one ear and i want my cartilage on the other ear, how long do i have to wait between them? What are pros and cons for industrial (scaffold)? what are risks and stuff and how much is it? i want to get it so any information or anything i should know would be great thanks especially for industrial:)
- i heard from people after a year an industrial still hurts and they usually have to take them out
- Q: Why is it necessary to keep records of all inspection carried out on scaffolds as stated in Regulation 39?
- To cover your A** in case of injury or an inspection.
Send your message to us
Cup Lock System scaffolding for Construction
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 10000 pc
- Supply Capability:
- 10000 pc/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches
Related keywords