Cuplock Scaffolding System with High Grade Steel for Construction
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 20000 pc
- Supply Capability:
- 3000000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. Structure of Cup-lock Scaffolding
It can be widely used for industrial and civil construction and maintenance, such as workshop, large gymnasium, conference& exhibition center conversation, billboard, market, dock, tunnel, subways, etc. used for mobile working platform installation of electrical & mechanical engineering, ship repair and other decoration engineering, for building temporary stand ,with simple roof frame, frame-connected Scaffolding can from temporary dormitory, depot and work shed.
2. Main Features of Cup-lock Scaffolding
.Multifunction: equipments of construction with different size and load of construction could be assembled, such as one-size double-sides scaffolding, props, etc. Applied to high-rise building, bridge, water tower, and so on.
.Avoid using bolt in assembly and low down labor intensity
.Reliable bending, shearing, torsional strength of dentation &cup-lock connection, the overall of it is more stable than normal
.Not easy to lose fastener, portable firm and easy to maintain and transport
3. Cup-lock Scaffolding Images
4. Cup-lock Scaffolding Specification
.There is a pair of adapter plugs of cup-lock every 0.5m-0.6m on the post and top bar
.5 times fast of adapter plug assembly and disassembly than normal
.Assuring construction of high-rise scaffolding with the whole safety facilities, the safety and reliability in usage
5. FAQ of Cup-lock Scaffolding
1) What can we do for you?
We can ensure the quality of the vinyl banner and avoid extra expenses for customers.
.We can provide you the professional design team.
.We can provide fashionable and newest styles for you.
.We can design the artwork for you.
. Please feel free to customize.
2) What promises can be done by us?
. If interested in Cup-lock Scaffolding, please feel free to write us for any QUOTE.
. If printing required, please advise asap because the whole set need much more time to complete.
. Please DO check goods when courier knocks your door and contact us asap if any issue.
3) What about the package and shipping time?
.Packing: As Customer's Requirements
.Shipping: We have various shipping ways for our customers, such as express which including TNT, DHL, FEDEX, UPS, EMS, etc. ; by air/ sea, and we are VIP of these express.
.Shipping time:
Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days.
Other mass qty of Cup-lock Scaffolding, we send them out by sea or by air to sea port or air port to save some shipping freight for our customers. By ocean, it may need 45~60days, by air, it may need 25~40days.
- Q:is it possible to have an industrial piercing done in 2 stages? so like 1 hole first and then a few weeks later the 2nd hole done. ive found a place that for 2 holes is cheaper than having the whole process done as one. Please help :)
- yes it is possible. I know people who have done that. But I suggest getting it done at once because it will hurt less in the long run. Getting your cartilage done hurts for about 2 weeks and then get the top part done that is another 2 weeks. So to get it done together it will only hurt for 2 weeks in instead of 4.
- Q:Bowl buckle type steel pipe scaffolding vertical pole bowl button node by what composition
- The utility model relates to a bowl buckle joint which is composed of an upper bowl buckle, a lower bowl buckle, a cross bar joint and a limit pin on the upper bowl buckle. A limiting pin is arranged on the vertical rod to weld the lower bowl buckle and the upper bowl buckle. Welding plug on the bar and the diagonal bar. When the utility model is assembled, the transverse rod and the inclined rod are inserted into the lower bowl buckle, and the upper bowl buckle is pressed and rotated
- Q:How bad? :/ i'm a real baby when it comes to this stuff
- I think i have a pretty high pain tolerance and i thought it hurt. It wasn't terrible but it still hurt. It also is really sore after but maybe take some advil or something before and hope that may help. Good luck
- Q:Bridge formwork support bowl button steel scaffolding, you need to set the floor bar?
- Bridge formwork support bowl buckle type steel pipe scaffold, need to set the sweeping rod.
- Q:is this right any answers please
- well id say not. go and talk to the owner of the company, there may have just been a mistake other wise go to you citezen advice and they will be able to better inform you
- Q:Construction of the bowl button steel scaffolding and fastener type scaffolding which cost high
- High price of bowl buckle! Fastener market more, so rent cheap!
- Q:I just got my scaffold piercing done today and everything went well. I was just wondering how long the healing process would take? Does it vary with different people? And is using sea-salt and warm water the best way to clean it?Cheers x
- Scaffolds usually take 6-12 months to heal - if you got it done with the long bar to start with, expect it to be longer than that and a lot more painful and tricky to heal. If it was done correctly, with two separate bits of jewellery first, it'll be easier. It does vary with different people, but not usually by that much - if the recommended healing time is six months, yours is not going to be properly healed in a month even if it feels like it. At five months it might be. Yes, sea salt and warm water is good. Twice a day - no more and no less.
- Q:Can you shorten the distance of the bowl buckle scaffold? That is, regardless of the length of the pole, the distance can be set to 60, 90, 120cm. Thank you
- 2, the bowl buckle steel tube stand step distance must be calculated to determine; for example, the calculation of the structure of the vertical bar step distance of 120, then the erection can not be used in the 180 step,
- Q:A 85 kg scaffold is 6.4 m long. It is hanging with two wires, one from each end. A 440 kg box sits 1.4 m from the left end. What is the tension in the left hand side wire?(g = 9.8 m/s2)Answer in newtons
- Sum of Moments around right wire: T(6.4)=9.8*(440(5)+85(3.2)) T= 3785N
- Q:A 105 kg scaffold is 6.2 m long. It is hanging with two wires, one from each end. A 520 kg box sits 2.2 m from the left end. What is the tension in the right hand side wire?(g = 9.8 m/s2)
- (105 x 9.8) = weight of 1,029N. Half is supported by each wire, = 514.5N. (520 x 9.8) = 5,096N. box weight. (6.2 - 2.2) = 4m. 5,096/((4//2.2)) +1) = 1,808.258N. (5,096 - 1,808.258) + 514.5 = 3,802.242N. tension in left wire.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Cuplock Scaffolding System with High Grade Steel for Construction
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 20000 pc
- Supply Capability:
- 3000000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches