• Cup Lock  Scaffolding  System from China System 1
  • Cup Lock  Scaffolding  System from China System 2
Cup Lock  Scaffolding  System from China

Cup Lock Scaffolding System from China

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1000 kg/m²
Supply Capability:
10000 kg/m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.Structure of cup lock Description

cup lock system is one of the most popular used scaffolding system in the world.It is consisted of cup lock,vertical,ledger,limit pins,blades and base etc.

Packaging & Delivery

Packaging Details:

Pallet or bag or upon client's request

Delivery Detail:

35days

2.Main Features of cup lock

1) Using less pipes

2) Easy to install

3) It can be used again and again for nearly 20years

3.Cup lock product pictures:

Cup Lock  Scaffolding  System from China

 4.Cup lock Product Description

Type:

ringlock scaffolding diagonal Brace

specification

Ø48.3×3.20

material:

steel Q235

Finished

Hot DIP galvanized, painted

Diagonal length(m)

Weight(kg)

0.9m * 1.25m

6.28

1.25m * 1.8m

8.6

1.25m * 2.7m

11.45

  5.FAQ

 We have organized several common questions for our clients,may help you sincerely:

1) How many Scaffolding your company have?

Here comes our 5 types of Scaffolding systems:

-Cup lock Scaffolding(C-Lock Scaffolding)

-Ring lock Scaffolding

-Kwistage Scaffolding

-H-frame Scaffolding

-ID15 Scaffolding Tower, this type Scaffolding is the most widely used in construction, such like bridge.

2) How long can we receive the product after purchase?

Lead time is about 30days after getting the signed PI and deposit

Q: i got my scaffold piercing 4 days ago and it still hurtsit usually doesn't hurt when nothing touches it, but then with the lightest touch of a finger or anything else, it hurts badly.i just cleaned it with h2Ocean and a q-tip and now it hurts really bad. :|should it not be hurting by now? or is this normal.? if its normal.. how long until it heals/stops hurting like a *****. hah
the industrial take over a year to FULLY heal. and it will be for a while.
Q: Do the external wall decoration (from the top down to do) scaffolding is to wait until after the completion of the indoor and outdoor decoration before the demolition?If the first interior decoration, can make a layer of a layer of it is to remove all the work finished I mean I finished all the interior decoration, wall decoration only, then I do a wall decoration on the demolition of a layer of scaffolding, this site useful no
The relevant provisions of the demolition of the external wall scaffold:First, the removal of scaffolding before the accurate preparation work should meet the following requirements:1, should be a comprehensive inspection of the scaffold fastener connection, even wall pieces, support system, etc. are in line with the requirements of the structure;2, should be based on the results of the inspection to improve the construction organization design of the demolition order and measures, approved by the competent authorities before the implementation;3, should remove the scaffolding on the debris and ground obstacles.
Q: Where to use scaffolding in construction
Construction height of 2m above to use scaffolding. Most of the site is the exterior, internal walls and paint.Scaffolding (scaffold) refers to the construction site for the workers to operate and solve the vertical and horizontal transport and erection of various stents. The general term of the construction industry, refers to the construction site used in the external walls, interior decoration or high level can not be directly construction. Mainly in order to work on or off the construction of the external security network and the installation of high altitude and other components, it is put on the shelf, scaffolding materials are usually made of bamboo, wood, steel or synthetic materials, etc.. Some projects also use scaffolding as a template, in addition to advertising, municipal, transportation, Luqiao, mining and other sectors are widely used.
Q: The outer hanging scaffold board 12 embedded parts embedded in the crack?
Is the pre embedded parts installation (burial) component hidden in the works inside. Is placed in the structure of casting fittings, for masonry superstructure when the lap. In order to facilitate the installation of engineering equipment based on external fixation. Most embedded parts made of metal, such as steel or iron, can also be used in wood, plastic and other nonmetallic rigid materials.
Q: What is a bar in the scaffold
Scaffolding in the cross section of the large cross bar, small cross bar.Large cross - vertical horizontal bar, which is located along the vertical axis of the scaffolding rod.A small transverse rod, a horizontal rod, which is horizontally arranged along the scaffold.
Q: Where can I source scaffolding steel/aluminium planks with rubber end caps?I am having much difficultly finding anything, can you assist?Thank you in advance.
Maybe something like a window washers scafolding planks...?
Q: What heights do u need a harness for(had to repost as didnt explain correctly in last 1)
OSHA says that you need guardrails, safety nets or a fall-arrest system if you're working or walking near an unprotected surface more than 6' above a lower level.
Q: What is the service life of the mobile scaffolding accessories?
The overall life of cold galvanized mobile scaffolding accessories for about 5 years, the surface does not require maintenance, moderate cost. The main processing technology: the welding of the scaffolding parts and then galvanized, the surface of each part, are galvanized. 5 years of surface treatment period, and the use of the elimination period, very close to the larger share of the market share.
Q: along with this question, -what does she think about during this time period?-how does she apprear on the scaffold? -who does she see and how does she feel?THANKS!!=]
Here is a good analysis and summary from Shmoop.
Q: The scaffold weighs 204 N and is 3.10 m long. What is the force each rope exerts on the scaffold when the 665 N worker stands 1.00 m from one end of the scaffold? N (smaller force) N (larger force)
Sum moments left side...(assume worker 1m from left) Right rope = 316.516 Sum vertical.... Left rope = 552.484

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords