• cup lock scaffolding accessories forged top cup System 1
cup lock scaffolding accessories forged top cup

cup lock scaffolding accessories forged top cup

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
10000 pc
Supply Capability:
10000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Quick Details

Brand Name:

MTH

Model Number:

MTH0402-MTH0405



.Material:

Steel Q235

type:

cast iron/forged

Certificate:

ISO9001:2008

surface.:

galvanized or black.

weight:

450/530g/pc

NAME:

Cuplock Scaffold System Parts Forged Top Cup

sample:

free





Packaging & Delivery

Packaging Detail:To be packed in pallet or carton or Big bags or to buyer's requirement .
Delivery Detail:WITHIN 20 DAYS AFTER CONFIRMING THE ORDER

Specifications

Top Cup 
1.Material:Q235 
2.surface: galvanized or black. 
3.weight :0.45kg..

 Scaffolding  top cup Product Description

                                                        

     Q235 Steel Best Price Construction Cuplock Top Cup

1.Material:Q235 
2.surface: galvanized or black.
3.weight :0.45kg,0.53kg.
4.sample: free.

Cuplock bottom cup

 

cuplock system bottom cup
1 Material:cast steel/45#forged
2 surface:black
3 weight:0.45kg

 

 

We are scaffolding manufacturer in China . We have more than 10 years experience in Scaffolding production and have a good reputation in this field. More than 90% of our products are export to Western Europe, Northern Europe, North America, South America, Australia. Hope we can establish longtime cooperation. 

Pls have a check of our scaffolding accessories products below: (We can also provide other types as u required)

 


Q:why the scaffold nned to be inspected within the preceding seven(7) days?
To make sure that it is constructed properly and things haven';t slipped out
Q:I am considering getting an ear scaffolding, and was wondering, is it girly???
is there a pic somewhere? ok i googled it, and it is just that long bar that goes through the top of the ear twice, and i actually know more guys with it than girls, but i am not going to lie... cartilidge piercings hurt, not when you get them done, but later on, and that has gotta be hella uncomfortable.
Q:What are the requirements for the removal of scaffolding
3, to the lower part of the scaffolding removed the last of a long pole, should be first in proper position of the erection of temporary bracing reinforcement, and then remove the wall; and by dividing the facade scaffolding removed when the ends do not remove scaffolding, should be set up the wall and cross bracing reinforcement according to the provisions
Q:How bad? :/ i'm a real baby when it comes to this stuff
I think i have a pretty high pain tolerance and i thought it hurt. It wasn't terrible but it still hurt. It also is really sore after but maybe take some advil or something before and hope that may help. Good luck
Q:Fixed in the construction of steel tubular scaffolding 3 rows of what is meant
Generally divided into single row scaffolding, double scaffolding and full scaffold.Single row scaffolding, the frame body is composed of a vertical rod; because of its small application scope (generally used in the decoration construction), poor stability, building height is small, has gradually withdraw from the market.
Q:is this right any answers please
Well if after 2 weeks you still hadn't been paid, then you should of left and found another job. I did door work for Scottish power years ago - trying to gain new energy customers etc. They didn't pay me or my colleagues at all. Eventually 3 months later I got ?350 out of them - Only after I wrote directly to the Chief executive (Rather handy that they accidentally sent me to his own home to try and sell him gas electricity hehehe). I wrote directly to his home and needless to say he took it upon himself personally to look into plus I also got a personal response.
Q:A 51.0 painter is on a uniform 23.0 scaffold supported from above by ropes . There is a 2.0 pail of paint to one side, as shown.
Let the scaffold be extended beyond 1m. Let the man walk beyond the right rope. Now tension in the left rope will be zero, if balanced. No units are given Now to the left of the right rope there are two forces, 1. due to the pail and 2. due to the weight of the scaffold. To the right of the right rope the man is standing at a distance d m from the right rope. Taking moment about the right rope, 23*2 + 2*3 = 51* d d = 1.01 m Since the scaffold has an extension of 1m from the right rope, the man go to the extreme right end of the right rope. ======================================... Suppose he moves to the left of the left rope, then the tension in the right rope is zero Taking moment about the left rope, 51* d = 23*2 + 2*1 d = 0.94 m That is from the left end this distance is 1- 0.94 = 0.06 m ===========================
Q:Would like to build a scaffold to use to paint interior of house using common materials (wood, PVC pipe, tubular steel etc) which I can buy at Home Depot and quot;boltquot; together. Top level only needs to be 6ft high to do what I need.......Any ideas or plans....rather than renting or buying a ready made one? Thanks
If you only need the top to be 6' high, why not rent one? Go to a rental yard and rent a baker. It's 6' tall, and has holes in the frame every 6 or so. This allows you to build it on stairs. It's a safe alternative to building your own. Hope this helps.
Q:What were Hester's three appearances on the scaffold?1 was prosecution and another was dimmesdale's death and confession. What was the third?
The Scarlet Letter is regularly taught at the high school level, but surely this is a mistake. The novel is difficult and challenging even for honors students. The architectured sentences, with their points and counterpoints, their parallel construction, their old school rhetorical cadences are strange and even wondrous to the modern eye. It is a good practice for the teacher and for the student to read aloud Hawthorne's prose so as to grow accustomed to his words the way one must for Shakespeare. If this is done and the edifice of Christianity and especially the fatalism of the Puritan mind brought to bear, then with leisurely pace and a steady concentration, the terrible beauty of Hawthorne's novel might be made immediate. s
Q:A window washer is standing on a scaffold supported by a vertical rope at each end. The scaffold weighs 190 N and is 3.30 m long. What is the tension in each rope when the 710 N worker stands 2.30 m from one end?smaller tensionN?larger tensionN?
think of statics (in terms of forces and torques): because of fact the gadget is in equilibrium, the sum of the forces = 0 and the sum of the torques = 0 on the grounds that sum of forces = 0, then: ft(left) + ft(suitable) - Fg(scaffold) - Fg(employee) = 0 on the grounds that sum of torques = 0, then: -Set some element as your axis of rotation. for my area, I set between the ft as my axis. to that end, my torque equation will become ft(suitable)(2.ninety m) – Fg(scaffold)(a million.40 5 m) – Fg(employee)(a million.ninety m) = 0 you already know Fg(scaffold), Fg(employee), so resolve for ft(suitable). Plug this value into the tension equation and resolve for ft(left).

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches