Crane TC6520 Construction Equipment Building Machinery
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Tower Crane TC6520 Description:
1.CMAX Tower Crane TC6520 is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.
2. Tower Crane TC6520 can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.
3. Tower Crane TC6520 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
4.Tower Crane TC6520 has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on.
5.Tower Crane TC6520 has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.
Tower Crane TC6520 Parameter:
Max. working range 65m, tip lifting weight 2T and Max. lifting weight 10T.
Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.
Trolleying mechanism can provide two operation speeds.
Free standing height (m) 50
Max height with attachment (m) 200
Working range can be adjusted (m) 55、60、65
Min working range (m) 2.5
Max lifting capacity (t) 10
Tip load @ 50m (t) 2
Tower Crane TC6520 Packaging & Delivery:
40HQ container
20~25days after deposit
Tower Crane TC6520 Diagram:
Tower Crane TC6520 Technical Sheet:
Tower Crane TC6520 FAQ:
1.What is tower crane?
Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.
2. What is the meaning of the tower crane’s code?
Take Tower Crane TC6520 for example, the first two letters “TC” means Tower Crane, “65”means jib length is 65meter, and the last two letter “20” means the tip load is :2 ton.
3. What is the principal to quote the right tower crane to the client?
First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.
- Q:my father is owning a crane manufacturing business I hav given my ssc wat should I study after ssc IT, mechanical engg., design engg. and others (plz. specify) ?
- Without being too critical, the first thing you need to do is improve your English so that you will be a huge help in the company whether in engineering or sales. Cranes require lots of engineering in weight handling (mechanical), automation and controls including instrumentation (electrical) and a tertiary field in engineering is in stopping and starting (clutches and brakes) which can be mechanical or hydraulic engineering. A new filed is metalurgy which is concerned with the way metals perform (stress), lighter,stronger, etc. Take your choice. Mpho
- Q:I have some cranes in our field next door and I was wondering do they eat chickens? I live in Wisconsin.?
- Ha ha ha, You have nothing to worry about!
- Q:How do tower cranes rise?
- The weight and concrete foundation shall be made in advance and marked, and the ground ground endurance shall be no less than 20T per square meter. The chassis and standard sections are then assembled on this basis. The standard section of tower crane is the main part of the main part of tower crane. It is also the main role of heightening the height of tower crane". In the construction process, tower crane accompanied by the rise of buildings, naturally need to heighten. When the tower is hoisted, the upper frame is raised upwards with the jack up, so that there is a space between the tower body and the frame, and the standard section of the tower body is installed in the space. In this way, the purpose of the tower crane is realized.
- Q:in the pit, i just lost my bike cuz johnny's crew tripped me with a chain. so no bike, and i only have my slingshot, skateboard, and some other useless stuff. dont say i can use my firecrackers or stik bombs cuz i dont have any in this pit. Also, my friend,... whatever his name is, he's there on top of the cars and junk and in the beginning he says something about a crane but i cant hear him. so everytime i pass under the crane... my conrtoller vibrates because the crane is supposed to pick up cars and such because its magnetic. so i already tried to see if when johnny goes under the crane it might pick him up because hes on a bike but it doesnt work. and i cant take him off of his bike and steal it either. i was thinking that would work because then whatshisface could pick me up with the crane.and when i try to hit him with my slingshot, it just doesnt work it would take me forever to knock him out with that puny little thing and he has a crowbar and he knocks me out so easily. HELP
- sorry, i have finisheded the game but not sure which part you are talking about.
- Q:how can we minimize energy losses of a crane to reduce the impact on the environment?
- No hint as to what type or size of crane, so I assume it is a large overhead traveling bridge crane inside an industrial building: Consult the manufacturer for recommendations. Change its power source to something cleaner (from diesel to propane or electric). Properly lubricate and adjust all moving parts. Turn power off when idle. Schedule heavy usage during hours of low demand of electric utility power. Replace motor with a more efficient new one. Replace entire crane with a new efficient one. Replace the large capacity one with one or more smaller units.
- Q:If so, would you mind finding me a site that will teach me how to either with a good video or an easy-to-follow explanation because i tried many sites and i just cannot understand clearly enough. I get so far and then i can't tell what is happening in a step, and i can't do it.If you wouldn't mind to find me a site that you know will help, since you can make them, it would be greatly appreciated.Thanks.
- Video okorder /
- Q:Tiger=StrengthSnake=FlexibilityCrane=Balance and the last two are?
- The traditional Shaolin animals were Tiger, Crane, Snake, Leopard, and Dragon. There are other animal systems used, including a few different Mantis and Monkey styles, as well as Dog boxing and Eagle Claw. Some systems, like Xing Yi, have sub-sets of other animals; I believe there are twelve in that system. According to Doc Fai Wong's Shaolin Five Animals Form, Crane was used for libido, Snake was used for Chi, Dragon was used for spirit, Leopard was used for tendon strength, and Tiger was used for strengthening the muscles and bones.
- Q:The car weights approx 900 kg.Thank you xx
- Gravity acts downwards, force = mass x acceleration. Crane acts upwards at same force. As the crane starts to lift the car there is upwards acceleration that causes more force to be generated for a moment.
- Q:are crane flies the most venomous insect in the world,or is this just an urban myth?
- Chuck Norris is the most lethal of all!!!!!!!!!!!!!!!!
- Q:Which kind is better, gantry crane or tower crane?
- Each has advantages, the use of different conditions, the use of different cranes, tower cranes can not move, but the lifting height can be very high, the door machine has tracks can be vertical and horizontal movements, lifting height, tower crane is not high.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Crane TC6520 Construction Equipment Building Machinery
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords