• Tower Crane TC6520 Construction Equipment Building Machinery System 1
  • Tower Crane TC6520 Construction Equipment Building Machinery System 2
  • Tower Crane TC6520 Construction Equipment Building Machinery System 3
  • Tower Crane TC6520 Construction Equipment Building Machinery System 4
Tower Crane TC6520 Construction Equipment Building Machinery

Tower Crane TC6520 Construction Equipment Building Machinery

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Tower Crane TC6520 Description:

1.CMAX Tower Crane TC6520  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC6520  can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC6520 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC6520  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC6520  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.


Tower Crane TC6520  Parameter:

 Max. working range 65m, tip lifting weight 2T and Max. lifting weight 10T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 50

Max height with attachment (m) 200

Working range can be adjusted (m) 55、60、65

Min working range (m) 2.5

Max lifting capacity (t) 10

Tip load @ 50m (t) 2


Tower Crane TC6520  Packaging & Delivery:

40HQ container

20~25days after deposit


Tower Crane TC6520 Diagram:

Tower Crane TC6520 Construction Equipment Building Machinery

Tower Crane TC6520 Construction Equipment Building Machinery

Tower Crane TC6520 Technical Sheet:

Tower Crane TC6520 Construction Equipment Building Machinery

Tower Crane TC6520 FAQ:

1.What is tower crane?

Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

2. What is the meaning of the tower crane’s code?

Take Tower Crane TC6520 for example, the first two letters “TC” means Tower Crane, “65”means jib length is 65meter, and the last two letter “20” means the tip load is :2 ton.

3. What is the principal to quote the right tower crane to the client?

First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.

Q: Notice of tower crane
Please refer to the technical regulations for the safety of installation, disassembly and use of tower cranes in construction;The following is copy:3 installation of tower cranes3.1 conditions for installation of tower cranes3.1.1 tower crane installation unit must have the construction administrative departments issued the contracted professional qualification and heavy equipment installation engineering construction enterprises safety production license. Tower crane installation units must be engaged in the installation of tower cranes within the scope of qualification permit.In addition to the professional and technical personnel who have the qualification standard, the installation units of 3.1.2 tower cranes shall also have professional personnel who are in line with the project. The person in charge of the project, the project manager and the full-time safety management personnel shall have the certificate of safety production inspection. Tower cranes, installers, electricians, drivers, signal engineers, cable operators should have special construction operation qualification certificates.3.1.3 construction units shall sign professional contract for installation engineering with the installation units, and make clear the responsibility of both sides for safety in production. In case of general contracting of construction, it shall be signed by the general contractor and the installation unit.
Q: What other actress of the 1960s who could have done the role of Marion Crane in Psycho,in place of Janet Leigh and give result too?I think she perfect.
Believe it or not? Alfred Hitchcock had thought Vera Miles would have been good in that role. He had one of his mini-crushes on Vera, and had planned to make her a superstar. However, he lost patience when Vera decided to enjoy her married life and have babies. Vera had no burning desire to become a superstar, and was happy with the work she was doing. She was also very smart in another way. She said that those parts worked out well for the blonde, sexy women that played them, but that just wasn't her look or her approach to acting. Vera Miles was in the movie Psycho, but she played the part of Marion Crane's sister. I've always thought that Janet Leigh was perfect in that role. She was so beautiful and unbelievably sexy that when she was on the screen? You couldn't stop watching her. Her ample bosom was an attention-getter all by itself. No offense to Janet Leigh, but I don't know if anyone cared if she could act or not! However, she did a fine job in Psycho.
Q: What is a "crawler crane" and what kinds of jobs is it good for?
*A crawler is a crane mounted on an undercarriage with a set of tracks (also called crawlers)that provide for the stability and mobility of the crane. Crawler cranes have both advantages and disadvantages depending on their intended use. The main advantage of a crawler is that they can move on site and perform lifts with very little set-up, as the crane is stable on its tracks with no outriggers. In addition, a crawler crane is capable of traveling with a load. The main disadvantage of a crawler crane is that they are very heavy, and cannot easily be moved from one job site to the next without significant expense. Typically, a large crawler must be disassembled and moved by trucks, rail cars or ships to be transported to its next location. Crawler cranes range in lifting capacity from about 40 US tons to 3500 US tons.
Q: I read the book and thought of a theory... I think that the headless horseman is just and alter ego Brom Bones alter ego and he wanted to kill Brom Bones for his beloved Katrina Van Tassel... I want to hear your opinions and theories possibly involving what you think Katrina said to Ichabod during the party. That would be nice thank you.
What Happened To Ichabod Crane
Q: i need help...its 4 an powerpoint due 2marrow. please help in any way you can
Sand Hill Cranes are migratory birds. Their population will vary based on the time of the year.
Q: Two cranes can unload a ship together in 8 hours. The faster crane takes 12 hours less than the slower crane, if each were to unload the same ship alone. How long does it take for each crane to unload this ship?
I'm surprised by how difficult and convoluted the other answers are. They're also wrong. If two cranes are working together and one crane can, in fact, do the job in two hours, then it cannot possibly take longer than two hours with the help of another crane. That makes no sense just by simple reasoning. So the answer of 2 and 14 hours is not correct. Not even close, really. Here's the simple, neat, and correct approach using basic algebra with no assumptions necessary or made: If crane 1 can unload at a rate1/x per hour, then crane 2 can unload at 1/(x+12) per hour since it takes 12 hours longer. The two cranes combined, unload at 1/8 per hour, which must be faster than either one alone. Example: If I can eat a pie in 3 hours and you can eat a pie in 6 hours: 1/3 + 1/6 = 3/6 = 1/2, so together we can eat a pie in just 2 hours... less time than either one alone. Makes sense. Back to the cranes, then: 1/x + 1/(x+12) = 1/8 (2x+12) / (x^2 + 12x) = 1/8 16x + 96 = x^2 + 12x x^2 - 4x - 96 = 0 (x - 12) (x + 8) = 0 - x = 12 or -8 Since the rate cannot be -8, the answer is x = 12 Crane A can unload all by itself in 12 hours. Crane B can do it in 24 hours, and together they can do it in just 8 hours. Check: 1/12 + 1/24 = 3/24 = 1/8 Their combined rate is, indeed, 1/8 per hour!
Q: Do they have any symbolic-ness about them? any thing like that is good! THank you!
The oldest living crane is Wolf which was a captive Siberian crane who lived up to be 83. There are 15 species of cranes living today and nine species that died a long time ago. The demoiselle crane are very high fliers flying over the mountains in the Himalayan Mountain range. Cranes are related to the rails coots trumpeters and limpkins. The western whooping cranes population migrates through the great plains to coastal Texas and the eastern whooping crane population migrates from Necedah National wildlife refuge in Wisconsin to Florida.The scientific name of the whooping crane is Grus Americana. Black-crowned crane is near threatened because of the pet trade.
Q: I'm researching Stephen Crane for an English project and I need to how Stephen Crane's works effected others. Thanks for the help! xP
I'd mention his book Red Badge of Courage and how it changed the war novel for American and English writers. You can look at books like Catch-22 , MASH, or Hemingway's war novels and find that personal voice that Crane used.
Q: Why are crane flies called mosquito eaters?
Do Crane Flies Eat Mosquitoes
Q: You know those machines you pay and get like 15 seconds to operate the fricken metal hand?Can you give me some tips?
make sure you find something that isn't trapped by anything else in the pit.. line up the crane one the front, then move over to the side and line it up... these machines used to be a lot easier 20 years ago, but now the arm doesn't apply much pressure.. it has to be lined up just right or you will never get anything...

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords