Crane TC6520 Construction Equipment Building Machinery Sales
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Tower Crane TC6520 Details:
Minimum Order Quantity: 1unit Unit: unit Loading Port: China main Port
Supply Capability: 5unit/month Payment Terms: T/T or L/C
Tower Crane TC6520 Description:
1.CMAX Tower Crane TC6520 is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.
2. Tower Crane TC6520 can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.
3. Tower Crane TC6520 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
4.Tower Crane TC6520 has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on.
5.Tower Crane TC6520 has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.
Tower Crane TC6520 Parameter:
Max. working range 65m, tip lifting weight 2T and Max. lifting weight 10T.
Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.
Trolleying mechanism can provide two operation speeds.
Free standing height (m) 50
Max height with attachment (m) 200
Working range can be adjusted (m) 55、60、65
Min working range (m) 2.5
Max lifting capacity (t) 10
Tip load @ 50m (t) 2
Tower Crane TC6520 Packaging & Delivery:
40HQ container
20~25days after deposit
Tower Crane TC6520 Diagram:
Tower Crane TC6520 Technical Sheet:
Tower Crane TC6520 FAQ:
1.What is tower crane?
Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.
2. What is the meaning of the tower crane’s code?
Take Tower Crane TC6520 for example, the first two letters “TC” means Tower Crane, “65”means jib length is 65meter, and the last two letter “20” means the tip load is :2 ton.
3. What is the principal to quote the right tower crane to the client?
First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.
- Q: What is the difference between crawler crane and tower crane?
- There are many differencesThe crawler is used to transport items in a smaller range of motion (site)A tower, used for construction, stationary, or maneuvering along a railroad track.Crawler can easily reach the magnitude of 50 tons or moreMore than ten tons of tower are relatively commonTrack internal combustion engine, hydraulicTower type general power consumptionWait, wait......
- Q: where can i buy a cheap plush crane machine?
- Supplier of plush animals for skill crane and claw machines everywhere
- Q: I still cannot grasp how a crane was taken apart on a building with no roof
- They used a climbing crane , and who said that the building has no roof? the crane parts can be dismantled on site and removed either by helicopters or using the construction lifts
- Q: In the end of chapter 16 of Catching Fire the 2nd book of the Hunger Games it says the name she wrote in the dummy, was Seneca Crane. Who is that?!,
- Seneca Crane was the man who ran the Hunger Games in the year that Katniss was in it. He was killed in the end because in the time HE ran the games, TWO people were allowed to win, and President Snow had him killed. It effected the Gamemakers when she wrote it on the dummy because they were shocked and reminded about punishments if they run the games wrong.
- Q: How much should the verticality of a tower crane be controlled? Thank you
- No, the wind speed is not more than 3m/s, the independent state tower (or attached state highest attachment point above the tower axis) lateral verticality tolerance is 4/1000, the highest tower axis perpendicularity allowed attachment line below the point of difference is 2/1000.
- Q: I saw da construction of the upcoming tallest building in da world in Dubai,how did da crane get on top of it?
- Why do you write da instead of the? It's irritating. I apologize to you. That was rude and unkind of me.
- Q: Tower crane body standard section connection bolt screw upward or downward, why?.
- Up or down, there is no change in the firm torque of the connecting bolt. Simply choose to go up or down for convenience. Generally no special requirements, it is recommended that the thread upward, so that it is not easy to rust.
- Q: For my science fair project we have to build someething using simple machines, me and my partner decided to do the crane, but we havent been able to find any place that shows intructions on how to build it. If you can please included a step by step plan, the things you will need ( whether or not they are hard to find/ and if so where i might be able to find them ), and your sourcetruely i appreciate this sooo much thankyou in advance everything counts so please make it as detailed as possible and if you know any other sites that show please include thank you sooo much :)
- you are totally just trying to avoid doing this work by yourself. anybody with two eyes can just look up crane on google and learn how it works. they are super simple just go to the library or something. or better yet go look at a real crane.
- Q: Pictures, data, manufacturers.
- how in the world could you take a tower crane, a huge crane, and mount it on a wall?
- Q: We see lots of cranes doing some heavy lifting during construction. But how do they get so high up these buildings? And when construction is nearly done, how do they go back down?
- Those type of cranes have a support system that is continuously built as the building gets taller. The crane climbs up on the support system to reach the next level and climbs down to get down
Send your message to us
Crane TC6520 Construction Equipment Building Machinery Sales
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords