Crane TC6024 Construction Equipment Building Machinery Distributor Sales
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Tower Crane TC6024 Description:
1.CMAX Tower Crane TC6024 is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.
2. Tower Crane TC6024 can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.
3. Tower Crane TC6024has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
4.Tower Crane TC6024 has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on.
5.Tower Crane TC6024 has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.
Tower Crane TC6024 Parameter:
Max. working range 60m, tip lifting weight 2.4T and Max. lifting weight 10T.
Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.
Trolleying mechanism can provide two operation speeds.
Free standing height (m) 50.5
Max height with attachment (m) 200
Working range can be adjusted (m) 48、54、60
Min working range (m) 2.5
Max lifting capacity (t) 10
Tip load @ 50m (t) 2.4
Tower Crane TC6024 Packaging & Delivery:
40HQ container
20~25days after deposit
Tower Crane TC024 Diagram:
\\
Tower Crane TC6024 Technical Sheet:
Tower Crane TC6024 FAQ:
1.What is tower crane?
Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.
2. What is the meaning of the tower crane’s code?
Take Tower Crane TC6024 for example, the first two letters “TC” means Tower Crane, “60”means jib length is 60 meter, and the last two letter “24” means the tip load is :2.4 ton.
3. What is the principal to quote the right tower crane to the client?
First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.
- Q:ok, how do you make a paper crane. i've totally tried with a direction and marked paper, but that didn't work out. by the time i gave up the paper was all smooth cuz it was so worn. anything would help, links, step-by-step instructions, both. whatever. 10 pts to whoever tells me, and i succeed. sweet
- wow, you must be refering to origami I can not help with this one but you can go to the library tomorrow and look it up (NOTE: this is neither joke or riddle see if there is a more appropriate place for this like arts and crafts )
- Q:I was wondering if Steam Cranes are still used to clear train derailments or are the all mothballed now? What do they use to clear derailments now days if the not the Steam Cranes? Also way are there 2 types of hooks on the crane anyway? Thanks
- They started to go by the wayside in the early 80's around here, though they were still in use until technology caught up and they could manufacture a 200 ton capacity crane for use on the highways. They had Hi-rail equipment and could get to the scene of a derailment much quicker than the old steam derricks. Near the end, I know there were at least 5 still operating, but the problem was, there were only two guys on the system that could run one of the things. Steam is the key word. We're all used to seeing crane operators running the machine from their little cab and moving the levers that control the hydraulics. But, it was amazing to see a guy run one of the Bucyrus Erie 200 ton derricks. All the functions were controlled by various valves that were scattered around the operators position, and it was like watching some kind of choreography; ballet, even. The sights, smells and sounds of the thing in action were no less eye catching than watching the operator himself.
- Q:I started to make 1000 paper cranes to make a wish come true and before I start I have a few questions. How many times can you make 1000 cranes to make a wish come true? Do you have to string them? And how long do you have to make them?
- I think it's a one time deal. You don't have to string them. You have as long as it takes. Look up Sadako Sasaki. She was a 12 year old Japanese girl who tried to fold 1000 cranes while in the hospital in the 1950's. She had A bomb disease, also know as leukemia. She got it because of the bombing of Hiroshima as a baby. She died after only making 650 or so cranes. It's a very good true story though.
- Q:I'm a bit confused as to what happened to him. I guess I skimed a bit at a certain important part of the book. When Seneca Crane's name was written on the dummy during training, why did the people gasp at the name written in berry juice? What happened to him? PS. I am at the begining of Mockingjay. So no spoilers please. (:
- In the end of the first book, he was put in a room with a bowl in the middle. In the bowl, there were berries. Very deadly berries. This is significant because in the arena, Peeta and Katniss threatened the Capitol that they would eat them and kill themselves. If that happened, there would be no victor. President Snow wanted Seneca Crane to kill them. But Seneca Crane let there be two victors, instead of one or none. So, back to the point. Seneca Crane was punished because he couldn't listen to the president's orders. So, he was put in a room with no food, water, etc. If he got hungry he, he had to eat the berries. So, he died. I don't know how you missed that, but I hope this helps! :) I LUV U PEETA!
- Q:i saw a huge one look liked it had a stinger to those hurt u?
- Crane flies look like mosquitoes from Hell, but they are absolutely harmless. They do not have stingers, they can not attack a human. Relax!
- Q:Tower crane technical condition GB/T 9462-1999 has been cancelled? If so, what is the new standard?
- the requirement for selecting the steel quality group based on the results of brittle fracture evaluation of steel is increased;Environmental requirements and nondestructive testing requirements for welds are increased;- increased the number of institutional requirements;- increased the type and requirements of some of the units;- - increased technical data requirements that manufacturers should provide;- added some information labeling requirements;- mounting and climbing requirements are increased;The inspection requirements of tower crane are described in detail.
- Q:I swear I'm a giant crane fly magnet and whenever there are crane flies within a mile of me they'll find me and chase me, and I'm dead terrified of them. I noticed that there are more and more of them since the beginning of April. Does it have anything to do with the rain? When will they go away?
- It's like they have no control over their limbs, and flutter onto you. We had one in our living room called Henry who my mum tried to kill because we are all so scared of them, and she disabeled it. It had a squashed leg. I felt sorry for it. It's proably because of global warming that they are still here.
- Q:how does the power electronic drives employed in cranes?
- Most large cranes run electrical motors. Depending on what power is available at the site, the crane may run from a generator or be powered by the grid. The power requirements depend on the size of the crane. Larger cranes may use a six-pole, three-phase, one-wye, 440-volt circut. Smaller cranes could use a three-phase 220-volt circuit.
- Q:I wanna get my gf this nice necklace but I suck at the crane games. Is there a way to cheat?
- a partial cheat that i use is 1st looking to see which items are at least open enough to get 2nd when i start up i get to the item then to go the left and right of item and adjust which way i go then try to aim for the middle of the item wanted then there is an 80 % chance that i will get the item i am aiming for but some of those crane games are rigged to the point you have to go at least 2 or 3 times depending on what type items are on there because the crane arm looses strength especially if it is far away from the exit hole
- Q:How were Churches and really tall buildings constructed hundreds of years ago before the invention of cranes?
- Now a days in India they use the scaffolding made from Bamboos. The same method may have been used our ancestors.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Crane TC6024 Construction Equipment Building Machinery Distributor Sales
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords