Tower Crane TC6024 Construction Equipment Sales Building Machinery Distributor
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Tower Crane TC6024 Description:
1.CMAX Tower Crane TC6024 is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.
2. Tower Crane TC6024 can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.
3. Tower Crane TC6024has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
4.Tower Crane TC6024 has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on.
5.Tower Crane TC6024 has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.
Tower Crane TC6024 Parameter:
Max. working range 60m, tip lifting weight 2.4T and Max. lifting weight 10T.
Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.
Trolleying mechanism can provide two operation speeds.
Free standing height (m) 50.5
Max height with attachment (m) 200
Working range can be adjusted (m) 48、54、60
Min working range (m) 2.5
Max lifting capacity (t) 10
Tip load @ 50m (t) 2.4
Tower Crane TC6024 Packaging & Delivery:
40HQ container
20~25days after deposit
Tower Crane TC024 Diagram:
\\
Tower Crane TC6024 Technical Sheet:
Tower Crane TC6024 FAQ:
1.What is tower crane?
Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.
2. What is the meaning of the tower crane’s code?
Take Tower Crane TC6024 for example, the first two letters “TC” means Tower Crane, “60”means jib length is 60 meter, and the last two letter “24” means the tip load is :2.4 ton.
3. What is the principal to quote the right tower crane to the client?
First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.
- Q:I have found crane fly larvae on my kitchen floor in the middle of the night. Were are they coming from? How do I get rid of them?
- probably not larva of crane fly...they live in the soil outside. Describe or post a pic what you have
- Q:I am writing an annotated bib about this topic and I'm not sure where to start looking or what could and couldn't be considered as a theme.
- Crane's work is often thematically driven by Naturalistic and Realistic concerns, including ideals versus realities, spiritual crises and fear. These themes are particularly evident in Crane's first three novels, Maggie: A Girl of the Streets, The Red Badge of Courage and George's Mother.[171] The three main characters search for a way to make their dreams come true, but ultimately suffer from crises of identity.[172] In The Red Badge of Courage, the main character both longs for the heroics of battle but ultimately fears it, demonstrating the dichotomy of courage and cowardice. He experiences the threat of death, misery and a loss of self.[173] Extreme isolation from society and community is also apparent in Crane's work. During the most intense battle scenes in The Red Badge of Courage, for example, the story's focus is predominately on the inner responses of a self unaware of others.[174] In The Open Boat, An Experiment in Misery and other short stories, Crane uses experiments with light, motion and color to express different degrees of epistemological uncertainty.[175] Similar to other Naturalistic works, Crane scrutinizes the position of man, who has been isolated not only from society, but also from God and nature. The Open Boat, for example, distances itself from the old Romantic optimism and affirmation of man's place in the world by concentrating on the characters' isolation.
- Q:I just made origami cranes and want to hang them up, each by themselves with just a peice of string....how should i go about doing this? how is it usually done?
- TAke a needle threaded with a long piece of black thread, and make a small knot at end of long thread. Push the needle thru the middle of the crane's back and pull the thread all the way thru the hole till the knot catches. pull the needle off the loose end of the thread and make another knot on that end. take a push pin or thumb tack and push the pin thru the knot, then push the pin or tack into the ceiling. FYI, tape never works - I have tried. The black thread lets them flutter a bit, and is invisible most of the time. p.s. ask your parents if you can hang stuff from the ceiling first. they may not want you to do that since it will leave holes in the ceiling when you take them down.
- Q:Since a crane has to extend outriggers while performing lifting operation , is it ok to allow a crane to transfer materials by carrying without extending outriggers and lifting and carrying load to different location especially in construction industry for safety reasons?
- For a lift the operator must know the weight of the object and the allowed angle of the crane (straight out horizontal may tip the crane). If the crane moves there is also a dynamic load (if the crane stops suddenly the load may keep moving and tip the crane). Therefore, only modest loads can be lifted and moved while outriggers are used for maximum lifts and to stabilize the base (on pneumatic tires?).
- Q:I was looking at the glidecam hd1000 for my canon vixia hv40, but now I think I'm more interested in a crane (jib).I was thinking of the advance digital 6 ft. crane. I would replace some of the plastic parts for metal.I'll be using it to film sketches and short films. (my budget is 350 dollars, but id like it to be under that)the crane is 200 dollarsthe glidecam is 370 dollars (on amazon)Thanks,Mike
- Yeah corner of foremost and Higgins. Just isn't all love bought at one time or one other. We have now the love that may be purchased on the street however even in eveyday existence is just not love purchased by means of gifts, dinner, it will not be what we call soiled love however it's still purchased. Wheather it can be a man shopping for a woman or lady for man. Take care dave PS nothing is free.
- Q:How to calculate the pouring and maintenance of tower crane concrete in valuation?
- Valuation, tower crane concrete foundation pouring and maintenance costs are included in the tower crane rental costs, not separately assessed.
- Q:Operation points of tower crane (tower crane)?
- Safe use requires the use of tower crane, issued by the state competent authorities shall abide by the rules and regulations, but also comply with the relevant provisions in the manual: the crane working environment temperature is -20~40 degrees Celsius, the maximum working pressure is 205N/m2, when should stop using the winds of more than 6 level; the same construction site to install more than two sets of tower crane when should pay attention to the location of each tower, take the elevation of different operations, in order to avoid the tower crane jib, balance arm collision accidents; safety device of tower crane, luffing and slewing height, mass and moment limiter, the last two more important, if the two is not detected qualified, will be regarded as the unqualified, because it plays a role to ensure the safety and prevent the tilting of the tower crane. As a construction site, the tower crane torque limiter failure or to replace the operating personnel mistakenly believe that daily only hanging 800-1000kg materials, not what the risk, the results in a process of lifting materials, because of the construction site is narrow, hanging by the operator sight blocked, hanging objects hanging on building the steel frame, caused by tower crane shaking, was the occurrence of major accidents, thanks to the ground work riggers promptly notify the operator immediately stop to avoid rollover accident of tower crane appeared. It is obvious that all safety devices on the tower crane are essential and must be checked regularly to ensure that all the safety devices are in good condition, sensitive and reliable.
- Q:Tower crane driver simulation exam which website?
- The driver of the tower exam is nothing more than the operation and safety of knowledge.
- Q:I have a question about cranes...does anyone know what the maiximim weight is that they can lift. A friend and I were discussing this and i was just wanting to know if anyone might have the answer. Thanks guys
- Do not know where you live but I worked in a Shipyard in South Mississippi That had Cranes which picked up Modules which weighed 100 tons. Most were in the range of 50 to 70 tons the limiting factor was the range of the lift away from the crane. The further away from the Crane the less the load limit but the Cranes were rail mounted so they could traverse and carry the load anywhere. We had one Crane capable of handling 500 tons, a real monster. These are all located at Pascagoula Mississippi. Most were imported from Germany.
- Q:How are those really tall construction cranes assembled ???
- I saw one erected once - it was fascinating. They started out with a big mobile crane - then they added piece by piece until they finished it.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Tower Crane TC6024 Construction Equipment Sales Building Machinery Distributor
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords