Cold Galvanized Tie Rod Nut With Base Plate For 80mm
- Loading Port:
- XINGANG
- Payment Terms:
- TT
- Min Order Qty:
- 2000 Unit/Units pc
- Supply Capability:
- 10000 Unit/Units Per Month pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details of Cold Galvanized Tie Rod Nut With Base Plate For 80mm
Place of Origin: China (Mainland)Brand Name: CMAX
Type: Formwork system
weight: 0.40kg-1kg
size: 70mm-150mm
material: QT500
screw thread: 15mm/17mm
Material |
Nodular Cast Iron QT4501;Steel 45Mn |
Working load |
90KN_180KN |
Package |
Steel Pallet; Box; Bag |
Thread |
Dia12mm;Dia15mm;Dia17mm;Dia20mm |
Surface |
Electro-Galvanization or self -color |
Packaging & Delivery of Cold Galvanized Tie Rod Nut With Base Plate For 80mm
Packaging Detail: stander packingDelivery Detail: 7 days after receive your deposit
Specifications of Cold Galvanized Tie Rod Nut With Base Plate For 80mm
1.easy remove2.surface perfact
3.colour:several colours
4.Drop Froged
5.Dia 48.3x48.3mm
6.Surface: Zinc Plating, hot DIP Galv
Material |
Q235 or 45# steel Material |
Diameter |
15/17mm |
size/length |
1m,2m,3m,4m,5m,6m,etc |
Surface Treament |
black or zinc plate |
Weight |
1.25kg |
Package |
in steel plate or plywood plate,as your requests |
Payment Terms |
TT,L/C, |
Delivery Time |
10-15days |
• It can be made by forged process , punching process, bending process, etc .
• Products’ type more than 400,including construction couplers, construction nuts , steel wedges, bolts, props , base jacks, base collars,base plate, and so on.
About us
1.Enough production lines and workers to delivery on time.
2.Main product: Scaffolding Frame,Scaffold Coupler( British Type, American Type, German Type, Italian Type, Australian Type, Mideast Type, Korean Type, Janpanese Type, Indian Type etc.); Shoring Props,Formworks,Formwork cast nuts Frame System, Accessories, Steel / Aluminum Planks etc.
3. Main Market: Europe, Australia, Newzealand, North America, Middle East, ect.
4.OEM Service
5.Our products have passed the customer`s quality test,and the factories have the quality testing instruments.
6.Provide good service for everyone.
Our scaffolding products are all manufactured in accordance with the standard of BS1139 and EN – 74. 90% of our products are exported to overseas markets. Our main products is very popular in the world in scaffolding fram system,formwork and other scaffolding accessory
- Q: What are the maintenance and maintenance of hydraulic climbing formwork
- Regular inspection of the climbing device should check the connections. In particular, the following parts of the site to focus on inspection and reinforcement: according to the design requirements of the bolt with spring washers
- Q: Climbing frame is divided into several kinds, what is its running mode? What is the rental cost? Please explain in detail! Thank you very much
- Install the lifting seat and a guide seat is connected with the high wall, main frame vertical rod, the frame set up to the designed height, laying the top scaffold, block feet - laying bottom safety nets and scaffolding, making turning plate - the upper part of the frame body structure and effective tie (tie spacing is not greater than 6m) - display efflux dense mesh safety net to the top of the shelf, the anti dropping boom is inserted into the base anti dropping device, the installation of steel rope - placed distribution cables, installation control cabinet, electric hoist, electric wiring and debugging system, pre inspection, electric hoist, demolition of frame body and the upper structure of pulling and synchronization a layer - installation completed, enter the upgrade cycle
- Q: The difference between the scaffold and the scaffold
- Climbing frame, also known as the lifting frame, according to its source of power can be divided into hydraulic, electric, manual pull and other major categories. It is a new type of scaffolding system developed in recent years, which is mainly used in high-rise shear wall construction. It can climb up or down the building. This system makes the change: one is the scaffold without turning over shelf, two is exempt from the disassembly process of scaffold (an assembly has been used after the completion of construction, and not affected) building height restrictions, greatly saves manpower and material. And in terms of security is also a big change for the traditional scaffolding. Highly developed in high-rise buildings.
- Q: Advantages and disadvantages of climbing frame and floor type scaffold
- 3, compared with the economy, the processing is simple, and the investment cost is low; if the geometric dimensions of the scaffold are carefully designed, and the utilization rate of the steel tube is improved, the material consumption can also obtain better economic effect. Fastener steel pipe frame equivalent to 15 square meters per square meter of construction steel.
- Q: The whole concrete wall climbing frame or good use of steel scaffolding
- It can climb up or down the building. This system makes the change scaffolding Technology: one is without turning over the shelf; two is exempt from the disassembly process of scaffold (an assembly has been used after the completion of construction, and not affected) building height restrictions, greatly saves manpower and material
- Q: What is an integrated climbing frame? What are the works? What are the advantages
- And in terms of security is also a big change for the traditional scaffolding. Highly developed in high-rise buildings. Rental fees do not want the same
1. Manufacturer Overview
Location | Hebei, China |
Year Established | 1987 |
Annual Output Value | Below US$1 Million |
Main Markets | China; United States; Britain; Japan; Germany; Israel |
Company Certifications | GB/T19001-2008/ISO9001:2008 Quality Certification |
2. Manufacturer Certificates
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability
a) Trade Capacity | |
Nearest Port | Xingang |
Export Percentage | 1% - 10% |
No.of Employees in Trade Department | 10-20 people |
Language Spoken: | Chinese; English |
b) Factory Information | |
Factory Size: | Above 3,000 square meters |
No. of Production Lines | Above 10 |
Contract Manufacturing | Design Service Offered |
Product Price Range | Average |
Send your message to us
Cold Galvanized Tie Rod Nut With Base Plate For 80mm
- Loading Port:
- XINGANG
- Payment Terms:
- TT
- Min Order Qty:
- 2000 Unit/Units pc
- Supply Capability:
- 10000 Unit/Units Per Month pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords