• Cold Galvanized  Wing Nut System 1
  • Cold Galvanized  Wing Nut System 2
  • Cold Galvanized  Wing Nut System 3
Cold Galvanized  Wing Nut

Cold Galvanized Wing Nut

Ref Price:
$0.36 / pc get latest price
Loading Port:
XINGANG
Payment Terms:
TT
Min Order Qty:
5000 Unit/Units pc
Supply Capability:
5000 pcs Per Month pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

The steel formwork scaffolding part, Wing Nut

1.Name: The formwork scaffolding accessories— wing nut

2.Material: casting steel, ZG25

3.Surface treatment: Raw/ HDG

4.Specification: as clients' drawing

5.Use: suit for formwork scaffolding

Specifications of Cold Galvanized Wing Nut:

1) Scaffolding wing nut ,Q235 Steel material

2) Surface: Cold dipped galvanized

3) Dia.: various sizes are available

4) Weight: Standard or as customers request

Details of Cold Galvanized Wing Nut:

1. Raw Material: ductile iron or forged carbon steel

2. Weight: Standard or as customers request

3. Standards: BS1139, EN74 class A & B

4. Working load: minimum 17kn

Specifications of Cold Galvanized Wing Nut:

1.Ductile wing nuts

2.Material: ductile iron

3.Various specifications available.

4.Surface: Plain, white galv. or color galv.

Packaging & Delivery :

Packaging Detail:Plywood case or pallet or as your request.

Delivery Detail:10-30 days after receive remittance

 

We are specializes in designing & manufacturing of various kinds of  formwork systems, including H20 timber-beam formwork, aluminum formwork, steel (aluminum)- frame formwork etc.

All the equipments & formwork systems produced by CNBM are compliant with the National level quality standard, and wins great reputation for their endurable performance in worldwide markets.

 Scaffolding Parts-Wing Nut

 

 Scaffolding Parts-Wing Nut

 

Q:What are the general requirements for fire protection facilities?
No water or extreme water shortage in the construction site, may not set up temporary fire water supply system, but according to the provisions of Article 6.2.2 of the provisions of the 2.0 times the number of fire extinguishers
Q:What are the aspects installation of the construction site?
Production area (tool room, shed, duty room, temporary road, temporary wall, temporary water and so on
Q:How to manage the construction equipment at the construction site
Personnel training, accreditation of staff training, including job skills training and personnel safety education and training
We are an enterprise which is engaged in mechanical designing, processing, mold manufacturing and casting. Its customers are based on foreign investors, state-owned enterprises and medium-sized private companies. Because of the advanced technology, our products are involved in petroleum, metallurgy, mining, and textile, medical and other industries. The company makes a rapid rise in the machining area under the conduct of business philosophy “quality first, customer first” and the management principle “strengthen the management, continuous improvement”.

1. Manufacturer Overview

Location Hebei, China
Year Established 1987
Annual Output Value Below US$1 Million
Main Markets China; United States; Britain; Japan; Germany; Israel
Company Certifications GB/T19001-2008/ISO9001:2008 Quality Certification

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port Xingang
Export Percentage 1% - 10%
No.of Employees in Trade Department 10-20 people
Language Spoken: Chinese; English
b)Factory Information  
Factory Size: Above 3,000 square meters
No. of Production Lines Above 10
Contract Manufacturing Design Service Offered
Product Price Range Average

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords