CMAX Tower Crane TC 6016 Construction Machine
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 500 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Specification
CMAX Tower Crane TC 6016 Construction Machine
Product Description:
Descriptions of our tower crane:
1, the topless tower crane reduce the dismounting requirements, lower weight, low mounting height, dismount each mast at a time in the air, save the labor cost, safety and fast.
2, it is suitable for crossover work of the cranes, without the tower cap and pull rod, the safety will be increased when there need the crossover work.
3, It is suitable for the special requirement about the height, such as airport nearby, tunnel, workshop ,and the construction site with high-tension cable.
4, It is suitable for the construction site that has the requirement about the crane boom, it can be used as internal climbing crane in the high-rise buildings, irregular roof or small areas.
5, It is very convenient for dismounting in the restricted construction site, dismount each crane boom at a time by manual.
6, The steel structure of crane boom has long using life and high safety standard.
7, The crane boom is good applicability, high-usage,the design of the topless tower crane boom is easy for realizing the serialization and standardization. Reduce the design and making cost.
8, Low design cost, short cycle, can much better satisfy the multiple demands of the customers.
Advantage of our tower crane:
1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.
2,It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.The range-change structure drives the trolley moving on the horizontal crang jib, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation
3, boom stability is good, combination amplitude range.
4, suitable for height have special requirements occasions construction.
5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.
FAQ;
1. why chose us?
China National Building Materials (Group) Corporation (CNBM), established in 1984,now is one of the largest state-owned group corporation in China, dealing with building materials & industrial equipment. Up to year 2010, CNBM Group's total asset is 20 billion USD and total staff is more than 100,000.CNBM International Corporation, specializes in designing & manufacturing of various
kinds of construction machinery, including tower crane, building hoist, etc. All the equipment produced by CNBM are compliant with the National level quality standard, and wins great reputation for their endurable performance in worldwide markets.
2.How about the shipment?
You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.
The delivery time is 20 days.
3. What about your service?
We have our factory, we can meet customers needs as soon as possible.
We have first rate professional technology and provide good after-sales service.
4.After Sales Service
We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.
- Q: Many schools I visited claim to teach styles like white crane and even Okinawa/Japanese Karate has come from white crane styles, however I seldom see techniques, kata, forms, or drills that encompass crane concepts of even crane movements. Why is that? At some traditional schools kung-fu/karate it is easy to see the animal influence but at others there is none. Does this also indicate a lack of understanding or incomplete training. What do you think.
- When you learn two martial arts naturally elements are going to get left out from one or both styles when you put what you've learned together under pressure - Look at most Karate, Taekwondo and Wushu students when they're put to the sword, most of them turn into kickboxers. It's entirely possible that the guys you've seen just don't bother trying to look 'crane' when they move.
- Q: Method for operating tower crane
- In the 2.11 operation, when lifting the weight, the weight should be higher than the height of the obstacle, at least 100mm.2.12 when the crane is approaching the track limit, it should slow down and stop in advance.2.13 when lifting heavy objects, not heavy lifting suspension instability, no additional weight in lifting objects, lifting scattered materials or special-shaped components must be used when the wire rope firmly tied to heavy lifting from the ground about 50cm stop, determine the brake materials, lashing and rigging, confirmation before lifting command.2.14 cranes must be adequately illuminated at night.2.15 crane in the stop, rest or midway power failure, the weight should be unloaded, not to weight suspended in the air.2.16 the operating room, no personnel shall enter, prohibited flammable and impede the operation of the items.2.17 is strictly prohibited or promotion personnel riding crane. Landing weight, weight is prohibited to stand.2.18 the boom and lifting pieces of cranes must be in safe distance from overhead transmission lines, and shall comply with the provisions of this schedule 30.1.6.2.19, two cranes in a track or two parallel or vertical orbit on the operation, should maintain the safety of any part of the distance between two machines, the minimum shall not be less than 5m.2.20 in case of any of the following circumstances, suspension operation shall be suspended:1., in the event of bad weather, such as heavy rain, heavy snow, fog and construction work surface has six (including six) above the strong winds, affecting safety construction.2. crane leakage occurs.3. serious wear of wire rope, to scrap standard (wire rope scrap standard see Appendix A).4. safety guards fail or display inaccurate.
- Q: I'm looking for estimate including installation, vertical support beams, and bus bars. Details: rectangular shaped building 500 ft long split lengthwise into two sections. 500ft X 4lengths of craneways is 2000ft. The crane runways are bolted to building frame but are self supporting on I-beams (104 vertical supporting beams X 24ft. height). The crane runways can support 10ton hoists. The bus bars (electrical conductor assembly) run along all (2000ft) of crane runways.
- Preformed okorder / We Build Cranes To Meet Your Needs And Your Budget. Free Quote. Offers a free quote. click link .
- Q: i just ordered a new JG 614 crane stock and do not know how to use the crane stock i would like to learn before it arrives can i have a link to a video or explanation please
- You first need a crane stock battery, as a normal battery won't fit in just one side of the crane stock. When you but the battery, you'll have two or three clusters of cells. Begin experimenting with the cord placement in the stock, by putting one cluster on one side and one (or two) on the other. You'll see what I mean when you get the gun. That's all there is to it, just a little experimenting.
- Q: I was looking at the glidecam hd1000 for my canon vixia hv40, but now I think I'm more interested in a crane (jib).I was thinking of the advance digital 6 ft. crane. I would replace some of the plastic parts for metal.I'll be using it to film sketches and short films. (my budget is 350 dollars, but id like it to be under that)the crane is 200 dollarsthe glidecam is 370 dollars (on amazon)Thanks,Mike
- It okorder / I have purchased Studio Jib last year and since then it is performing pretty good. It is quite light in weight that it can be carried very easily without any problem.
- Q: About tower crane torque limiter with 4 limit switches, each play a role, thank you
- Hook top point control: when the hook to the high limit, limit action, do not continue to hook!Overload control: when the weight exceeds the overload point or amplitude exceeds the maximum amplitude or the loading rate is more than 105% when the output control, prohibit the hook lifting action and prohibit car distance to allow the car to increase the amplitude, amplitude can be damped near.
- Q: I'm talking about one of the ones where the cabin and the worker is high up in the air. You cant exactly remove a part of the bottom of the cranes structure because it would fall on top of you but you cant remove the cabin because its so high up and what can get up that high to remove it except another crane BUT how did that get built ?Thank you.
- A tower crane is usually assembled by a telescopic crane of smaller lifting capacity but greater height and in the case of tower cranes that have risen while constructing very tall skyscrapers, a smaller crane (or derrick) will sometimes be lifted to the roof of the completed tower to dismantle the tower crane afterwards. A self-assembling tower crane lifts itself off the ground using jacks, allowing the next section of the tower to be inserted at ground level.
- Q: I need to go to a tower crane school inside Las Vegas, where do i go? At least inside Nevada. Not Arizona or Utah or California.
- check with the International Union of Operating Engineers. I know that in the past, they provided the training, and past the general operators certification, there is a Crane certification, and possibly also a Tower Crane endorsement.
- Q: Today, a crane collapsed on the Grand Mosque in Mecca, killing 87 people. Is God punishing Muslims for 9/11?
- No, just bad work practice and no OHS practice in Arab countries
- Q: how do u build a hydraulic crane using syringes. it's a science project. can u give me websites or if u know details.
- Do okorder
Send your message to us
CMAX Tower Crane TC 6016 Construction Machine
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 500 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords