• CMAX Tower Crane TC 6016 Construction Machine System 1
  • CMAX Tower Crane TC 6016 Construction Machine System 2
  • CMAX Tower Crane TC 6016 Construction Machine System 3
  • CMAX Tower Crane TC 6016 Construction Machine System 4
  • CMAX Tower Crane TC 6016 Construction Machine System 5
  • CMAX Tower Crane TC 6016 Construction Machine System 6
CMAX Tower Crane TC 6016 Construction Machine

CMAX Tower Crane TC 6016 Construction Machine

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
500 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Specification

Maximum Lifting Weight:
10t
Maximum Lifting Height(M):
200m
Rated Loading Capacity:
10t
Span:
60m
Rated Load Moment:
10t

CMAX Tower Crane TC 6016 Construction Machine 

Product Description:

Descriptions of our tower crane:

1, the topless tower crane reduce the dismounting requirements, lower weight, low mounting height, dismount each mast at a time in the air, save the labor cost, safety and fast.

2, it is suitable for crossover work of the cranes, without the tower cap and pull rod, the safety will be increased when there need the crossover work.

3, It is suitable for the special requirement about the height, such as airport nearby, tunnel, workshop ,and the construction site with high-tension cable.

4, It is suitable for the construction site that has the requirement about the crane boom, it can be used as internal climbing crane in the high-rise buildings, irregular roof or small areas.

5, It is very convenient for dismounting in the restricted construction site, dismount each crane boom at a time by manual.

6, The steel structure of crane boom has long using life and high safety standard.

7, The crane boom is good applicability, high-usage,the design of the topless tower crane boom is easy for realizing the serialization and standardization. Reduce the design and making cost.

8, Low design cost, short cycle, can much better satisfy the multiple demands of the customers.


Advantage of our tower crane:


1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2,It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.The range-change structure drives the trolley moving on the horizontal crang jib, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.



FAQ;

1. why chose us?

China National Building Materials (Group) Corporation (CNBM), established in 1984,now is one of the largest state-owned group corporation in China, dealing with building materials & industrial equipment. Up to year 2010, CNBM Group's total asset is 20 billion USD and total staff is more than 100,000.CNBM International Corporation, specializes in designing & manufacturing of various

kinds of construction machinery, including tower crane, building hoist, etc. All the equipment produced by CNBM are compliant with the National level quality standard, and wins great reputation for their endurable performance in worldwide markets.

 

2.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

3. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

4.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period. 


Q:What is the free height of a tower crane?
The free height of large tower cranes can be up to 100 meters.
Q:where can i buy a cheap plush crane machine?
Supplier of plush animals for skill crane and claw machines everywhere
Q:Since a crane has to extend outriggers while performing lifting operation , is it ok to allow a crane to transfer materials by carrying without extending outriggers and lifting and carrying load to different location especially in construction industry for safety reasons?
Yes, this is not only possible, it is done by cranes that are designed to operate without outriggers. There is a company called Lampson that has a whole product line of these cranes (see link). I have personally witnessed a number of lifts where an outrigger-less mobile Lampson crane moved a load in the multi-hundreds of tons during construction of a nuclear power plant.
Q:I know, do you know?
Usually another crane is used to hoist modular sections an erect the crane. Some large construction cranes build themselves using modular tower sections. The boom and crane cab lifts itself on a track, the crane lifts a modular section of tower from the ground, and inserts it under the cab. The top lifts itself up and starts again. Check out the video below. Incidentally, enormous blocks of concrete are poured on the ground to support cranes like this one, and are too massive to remove when construction is complete. So, many tall buildings have huge monolithic hunks of concrete in the ground at their base....
Q:Is the working load of a crane the maximum weight it is able to lift?
yes it is , because when we Design a part usually we will ad safty factor 1.5 or more from the maximum weght is able.
Q:Climbing process of an internal climbing tower crane
There are two kinds of climbing mechanisms: hydraulic and mechanical. The hydraulic climbing mechanism consists of a ladder ladder, a hydraulic cylinder, a climbing beam and a support leg. The climbing ladder is composed of an upper and a lower bearing beams, separated by two stories, which are fixed on the wall or side beam of the cylindrical structure when the work is used, and both sides of the ladder stand are provided with steps. The load bearing beam corresponds to the four main limbs of the crane tower, and is equipped with 8 guide rollers, which plays a guiding role when climbing.
Q:What are the parts of a tower crane? What are their main functions?
The structural elements include the followingMain arm: carrying weight, and making the trolley have walking track.Balance arm: put up lifting mechanism, electric box, counterweight, and make tower crane to achieve balance torque, reduce the standard section of the bending moment.Tower cap: connect the main arm with the balance arm by the tie bar, so as to reduce the bending moment of the standard section.
Q:What do you do to become a crane operator, do you go to school and how long is it?
OK, first, what kind of crane? there are many different kinds that do many different things. From loading containers at the seaport to high rise buildings. One does not just go into cranes. The more experienced ones, started out as oilers or greasers. Some started out as signal persons. They learned by watching and listening. In the following states you must hold National certification: CA, HA,MT,OR,WA,MN,WV,NM,RI,NJ,NV,NY UT. PA and SC have restrictions now but will be added sometime soon. You can attend a crane school that prepares you for the national certification, but it expensive and not easy for someone without a background working around cranes. There is a lot of terminology and mathematics involved. Not to mention the Federal, state, local and OSHA rules you must practice. Go to your state employment office. They have all the information you need. get to know one of the counselors and pursue your dream. It is not as easy as it seems. But is it a well paying career. Good luck Bill
Q:Is there a crane big enough to lift Hillary off the yoga matt when she has finished her yoga?
You wouldn't need a crane, all you'd need is a hershey's bar and she'd wattle off the yoga mat. Or, you can present her with facts about the destruction of her e-mail server, the fact that she allowed innocent people in Iraq and Syria to die, or the fact that she hit the reset button with Russia, and she'll RUN AWAY from the yoga mat.
Q:I need the answer badly
The world would be a little less beautiful. The blue crane's role as a predator in its ecosystem would be left empty, allowing its former prey to breed without check until (hopefully) another predator moves in to pick up the slack. Otherwise the ecosystem will be out of balance.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords