• CMAX TC 6014 Tower Crane Construction Machine System 1
  • CMAX TC 6014 Tower Crane Construction Machine System 2
  • CMAX TC 6014 Tower Crane Construction Machine System 3
CMAX TC 6014 Tower Crane Construction Machine

CMAX TC 6014 Tower Crane Construction Machine

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
500 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Specification

Maximum Lifting Weight:
8t
Maximum Lifting Height(M):
200m
Rated Loading Capacity:
8t
Span:
60m
Rated Load Moment:
8t

CMAX TC 6014 Tower Crane Construction Machine

Product Description:

Descriptions of our tower crane:

1, the topless tower crane reduce the dismounting requirements, lower weight, low mounting height, dismount each mast at a time in the air, save the labor cost, safety and fast.

2, it is suitable for crossover work of the cranes, without the tower cap and pull rod, the safety will be increased when there need the crossover work.

3, It is suitable for the special requirement about the height, such as airport nearby, tunnel, workshop ,and the construction site with high-tension cable.

4, It is suitable for the construction site that has the requirement about the crane boom, it can be used as internal climbing crane in the high-rise buildings, irregular roof or small areas.

5, It is very convenient for dismounting in the restricted construction site, dismount each crane boom at a time by manual.

6, The steel structure of crane boom has long using life and high safety standard.

7, The crane boom is good applicability, high-usage,the design of the topless tower crane boom is easy for realizing the serialization and standardization. Reduce the design and making cost.

8, Low design cost, short cycle, can much better satisfy the multiple demands of the customers.


Advantage of our tower crane:


1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2,It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.The range-change structure drives the trolley moving on the horizontal crang jib, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.




FAQ;

1. why chose us?

China National Building Materials (Group) Corporation (CNBM), established in 1984,now is one of the largest state-owned group corporation in China, dealing with building materials & industrial equipment. Up to year 2010, CNBM Group's total asset is 20 billion USD and total staff is more than 100,000.CNBM International Corporation, specializes in designing & manufacturing of various

kinds of construction machinery, including tower crane, building hoist, etc. All the equipment produced by CNBM are compliant with the National level quality standard, and wins great reputation for their endurable performance in worldwide markets.

 

2.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

3. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

4.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period. 


Q: could someone give me a good summary on the red badge of courage, and yes i did read the book and i have trouble understanding, and help would be good thanks!!
A kid, full of beans, runs off to join the army to annoy his mum, but on the eve of battle suddenly becomes paranoid that he'll do something to disgrace himself through cowardice. (That's actually as far as I got in the book so far.) I am given to understand, though, that in his own mind at least he does disgrace himself and endeavours for the rest of the book to redeem his manliness. In that sense the story arc, or at least the character arc, is not dissimilar to The Four Feathers. The point of the story is to counterpoint the myths of warrior gung-ho and daring-do, and to analyse the inner anxieties and motivations of the individual, volunteer-citizen soldier, and by extension the expectations of society. The novel also presents the battlefield with an unprecedented realism; that is to say, Crane presents the actual fog of war that authors have always set out to clear.
Q: Im hearing this like every day theres more going down..why is it happening? A terrorist plot perhaps? I say we send some troops to stand guard and prevent another tragedy!
These are dangerous peices of equipment, they endure high stress and are at times pushed to the physical limits. I have on occassion worked with and under them and always had a lot of respect and always felt safer when away from them. Construction cranes in particular are more dangerous because they are forever changing in height,position, amount and type of load. Cranes in permanent installations are ususlly carrying same or similar loads. Construction sites are hazardous due to many factors but just about everything on site gets handled by the crane at one time or another. Inspection,inspection, and re-inspection with concurrent correction/adjustment are the only preventative measure availble beside the assurance of competency of the operator. There are plenty of laws about them already but this is not to say new ones might be justified as new hazards become apparent. Most terrorists are too dumb or lazy to get involved with cranes--why bother when so many easy targets are out there !!!!!!!!
Q: i need the names of the organisms. like names of insects or fish or what ever they eat. give the organism's name. don't just say fish or insects. i need specific names.this is for a biology project.
Diet okorder /.. I'm sorry, I couldn't find any specific names, but here are some general ones. Sorry again.
Q: i know something is supposed to happen when you make a thousand origami cranes but i dint remember what happens. can someone please help me
It's a story about a japanese girl who was diagnosed with leukemia. The story goes, if are diagnosed with leukemia and are able to fold a 1000 paper cranes before you die, you will live. This theory actually works the way horoscopes do. It's not that the making of paper cranes makes you healthy, it has to do with the amount of time it takes. If you survive that long, then you have passed the critical death points and will live anyway, whether you make a thousand of them or not. Plus, it gives you something to do a a healthy, short-term reason to live, which always helps the healing process anyway.
Q: Tower crane technical condition GB/T 9462-1999 has been cancelled? If so, what is the new standard?
Standard number: GB/T 5031-2008Standard Name: Tower CraneStandard status: currentAlternatives: instead of GB/T 17806-1999; GB/T 17807-1999; GB/T 5031-1994; GB/T 9462-1999This standard specifies the nomenclature, classification and identification, technical requirements, test methods, inspection rules, information identification, packaging, transportation and storage, installation and climbing, and inspection of tower cranes.
Q: how do they get the construction crane onto the the tall buildings?
There are two cranes, one lifts the other and construction workers build a scaffold under it. Then the higher crane lifts the lower one and the workers buiold a scaffold under it, this continues until they are as high as they need to be.
Q: determine the maximum load the crane can support in kg if the bending moment on the beam is not to exceed 5000 Nm and the shear force is not to exceed 3KN when the crane is positioned at mid span
figure shear first Let F be the max. crane load. for a simply supported symmetric load, the reactions at each end support will be half the total load. The reaction loads will also equal the shear load. 3000 N = (F + 150(9.8))/2 F = 4530 N The maximum bending moment will be the shear force times the moment arm of half the joist length 5000 Nm = [(F + 150(9.8))/2] N (2.0 m) 5000 = F + 150(9.8) F = 3530 N The bending moment max load is 1000 N less than the Shear max load so bending is the limiting factor The maximum load allowed is F = 3530 N 3530 / 9.8 = 360 kg As a form of exchange, please remember to vote a Best Answer from your results.
Q: from the legend of sleepy hollow, his background, characater, personality, life etc.
uhh...by reading sleepy hollow?
Q: vehicle's like car's,truck's etc.need's paper's or document's for regestration or license to used it.what if i mounted or install a crane on it,do i need some paper's or document for regestration or license for the crane?
I am not sure, but you probably do not need one for a crane perse. Although if you do that, you are basically modifying your current vehicle and you may need documentation for that. To be sure, ask the Land Transportation Office. or visit their site: www.lto .ph/
Q: any kind of sayings
Whoop!

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords