• CMAX Tower Crane Specification with Good Quality System 1
  • CMAX Tower Crane Specification with Good Quality System 2
  • CMAX Tower Crane Specification with Good Quality System 3
  • CMAX Tower Crane Specification with Good Quality System 4
  • CMAX Tower Crane Specification with Good Quality System 5
  • CMAX Tower Crane Specification with Good Quality System 6
CMAX Tower Crane Specification with Good Quality

CMAX Tower Crane Specification with Good Quality

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Detail of Tower Crane

Feature: Tower Crane                Condition: New                         Application:Building,Construction,Industrial

Rated Loading Capacity: 3.4-12T     Rated Lifting Moment:315KN.M           Max. Lifting Load: 12T

Max. Lifting Height: 200M           Span: 2.5-70M                          Place of Origin: China (Mainland)

Brand Name: CMAX                    Model Number: TC7034(QTZ315)           Certification: ISO,CE

Warranty: 1 Year                    Free standing height (M):50            Max. Working Range(M): 70

Tip Lifting Weight(T): 3.4          Working Range(M): 50,55,60,65,70       Climbing speed(M/MIN): 0.5

Counterweight(T): 26                Working Temperature(°C): -40-+60      Type: Topkit Tower Crane

Delivery Date:25-30 days            Mast Section Size(L*W*H)MM:2000*2000*3000             


Main Features of Tower Crane


1. TC7034(QTZ315) have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition. With their working radius from 2.5 to 70m, TC7034(QTZ315) tower cranes are famous for their large operating ranges, varied working methods and wide uses.  

 

2. This series of tower cranes has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism.

 

3. It is original in design, reliable in operation and satisfactory in shape.

 

4. Equipped with all necessary safety devices, these cranes show a good speed-control capacity, satisfactory operating stability and high work efficiency.

 

5. Slewing mechanism and trolleying mechanism all take VFD+PLC technical control.

 

6. Outstanding in working efficiency, operating speed and stability. Reduce future maintenance cost.


7. With scientific layout and beautiful appearance.

 

8.They are widely applied for the construction of high-rise hotels, resident buildings, high-rise industrial buildings, large-span factory buildings and tower like buildings like tall chimneys. 

 

9.After sales service will be offered which will get rid of all your worries in the purchase of our product


Specification of Tower Crane

 

CMAX Tower Crane Specification with Good Quality


CMAX Tower Crane Specification with Good Quality

CMAX Tower Crane Specification with Good Quality

 

Images of Tower Crane

CMAX Tower Crane Specification with Good Quality

CMAX Tower Crane Specification with Good Quality

CMAX Tower Crane Specification with Good Quality

CMAX Tower Crane Specification with Good Quality

CMAX Tower Crane Specification with Good Quality


FAQ about Tower Crane

 

Q: What kinds of tower crane are available now? 

A: Four main categories: normal  tower crane  with cat head, internal climbing  tower crane , top less  tower crane  and luffing  tower crane.  

 

Q: What kind of steel used for  tower crane ?

A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.

 

Q: What about our  tower crane  warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the  tower crane ?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on  tower crane  jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.



Q:Can paper crane symbolise your love for a girl?
sit back look at your question then answer it yourself
Q:I already have 864 cranes and I wanna know what kind of wishes can I make? And are there consequences?Can I wish something like my mom won the lottery and we become rich? (Just an example!)And can you wish for death? (Just a question!)
You can make whatever wishes you want. Just remember that the wishes you make reflects what kind of person you are. So maybe you should make wishes you can be proud of. Also remember, if wishes were horses beggars would ride If you for example would wish that you would have $10, your wish is most likely to be fulfilled if you manage to sell each origami crane for 1 cent... Generally wishes come true if you really work for them, Not by sitting, doing nothing and wishing.
Q:heres a picture of one
they are put up section by section with another crane
Q:In the end of chapter 16 of Catching Fire the 2nd book of the Hunger Games it says the name she wrote in the dummy, was Seneca Crane. Who is that?!,
Seneca Crane was the man who ran the Hunger Games in the year that Katniss was in it. He was killed in the end because in the time HE ran the games, TWO people were allowed to win, and President Snow had him killed. It effected the Gamemakers when she wrote it on the dummy because they were shocked and reminded about punishments if they run the games wrong.
Q:This is for a school project, we need a crane with yydraulics to pick up things for science.. Any ideas ?!
The first (visible in the first link) is the boom angle pistons. These are mounted to the rotating section and to the boom. The second hydraulics are inside the boom arm. The boom actually has several sections that telescope (like a motorized car antenna). Each section has a hydraulic piston that pushes the section out of the end of the boom. The cable that hangs off the end is wound onto a large cable reel that is on the rotating section. This cable reel is also gear driven, but is usually just run by two standard spur gears. E-mail me with more details as to how big you want this project and I can help out more from there. Make sure your account is set up to allow e-mails.
Q:Are there any special requirements for the installation of wall fittings of tower cranes?
The wall pieces should be rigidly connected on the wall of the embedded parts.
Q:who invented cranes?
Lost in the mists of time. We know that the Babylonians and Egyptians used simple cranes a few thousand years BC.
Q:when a skyscraper is done being built, how does the crane come down?
In pieces, section by section, and then the base is taken out by Helicopter. Or at least that is how I would do it.
Q:I've been wondering about the infamous Crane Stance that many people associate with Martial Arts. Is the Crane Stance a technique that can be used in a fight and strike an opponent effectively without overly exposing yourself to strikes by your opponent? If it is, what are some techniques that can be used out of a Crane Stance?
The tournament habit of dramatically posing these stances gives one the impression the user is waiting for an attack rather than evading an attack( kick to the knee blocking a kick to the groin lower abdomen area or delivering a knee strike.) Shotokan pretty much removed these stances except for one kata ganakaku in other kata the leg raise is done very swiftly with the leg returning to the ground immediately nijushi ho being a good example.
Q:Like those three hundred or four hundred meter tall skyscrapers, where are the bottom of these tower cranes installed?It doesn't go up from the ground, little by littleWill the crane not fall down?
It's just a little bit needed, and you're right!! As long as the requirements to ensure verticality, no problemBuilding technical requirements, such as Perpendicularity Error of not more than 3 millimeters per 100 meters, can be guaranteed by the building.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords