CMAX Tower Crane Specification with Good Quality
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Detail of Tower Crane
Feature: Tower Crane Condition: New Application:Building,Construction,Industrial
Rated Loading Capacity: 3.4-12T Rated Lifting Moment:315KN.M Max. Lifting Load: 12T
Max. Lifting Height: 200M Span: 2.5-70M Place of Origin: China (Mainland)
Brand Name: CMAX Model Number: TC7034(QTZ315) Certification: ISO,CE
Warranty: 1 Year Free standing height (M):50 Max. Working Range(M): 70
Tip Lifting Weight(T): 3.4 Working Range(M): 50,55,60,65,70 Climbing speed(M/MIN): 0.5
Counterweight(T): 26 Working Temperature(°C): -40-+60 Type: Topkit Tower Crane
Delivery Date:25-30 days Mast Section Size(L*W*H)MM:2000*2000*3000
Main Features of Tower Crane
1. TC7034(QTZ315) have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition. With their working radius from 2.5 to 70m, TC7034(QTZ315) tower cranes are famous for their large operating ranges, varied working methods and wide uses.
2. This series of tower cranes has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism.
3. It is original in design, reliable in operation and satisfactory in shape.
4. Equipped with all necessary safety devices, these cranes show a good speed-control capacity, satisfactory operating stability and high work efficiency.
5. Slewing mechanism and trolleying mechanism all take VFD+PLC technical control.
6. Outstanding in working efficiency, operating speed and stability. Reduce future maintenance cost.
7. With scientific layout and beautiful appearance.
8.They are widely applied for the construction of high-rise hotels, resident buildings, high-rise industrial buildings, large-span factory buildings and tower like buildings like tall chimneys.
9.After sales service will be offered which will get rid of all your worries in the purchase of our product
Specification of Tower Crane
Images of Tower Crane
FAQ about Tower Crane
Q: What kinds of tower crane are available now?
A: Four main categories: normal tower crane with cat head, internal climbing tower crane , top less tower crane and luffing tower crane.
Q: What kind of steel used for tower crane ?
A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.
Q: What about our tower crane warranty?
A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.
Q: What is 3 main mechanism of the tower crane ?
A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.
Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?
A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.
- Q: Hey i need to know what icabod crane did in sleepy hollow the tim burton version with johnny depp.. so far all i have is In the movie he is a detective or a constable, someone who tries to solve crimes. He stands up for what he believes in even though no one might stand up with him. He used instruments of his own kind. Any information will help..Thank you very much Thx again
- You already seem to know the answer. That's what he did. He was a detective and had his own instruments and methods for solving a crime and he was out to prove they worked in Sleepy Hollow.
- Q: Does anyone know of any companies that sell mobile cranes suited for extreme cold? I'm aware of Liebherr and Havator's harbor cranes, but I can't find much else.Thanks
- this is not my area of study but i will give you something to consider. if you are looking for a large capacity crane for use on permafrost, you wont find one. the pressure placed on the permafrost by large weights will cause it to melt. anything that is heavy, like a house, will sink in the tundra just like it will in a swamp. for houses they excavate the foundation a build a giant wooden raft that the hose floats on. in ST Petersburg, Russians preferred a mix of reeds and slave laborers corpses's to build the raft. as long as the ground is not frozen there is somebody how makes what you want. if the ground is frozen, you will only find small machinery. best of luck ps dont look to hard. lots of diesel engines work great at sub-subfreezing temps.
- Q: I know, do you know?
- They build it on the ground, raise it up with another crane, and then lift the counter weights up!
- Q: How to build a strong paper crane?
- Fact: paper is relatively strong when you pull on it, but when you push on it, it easily crumples. Build your crane out of several bars. Bars that are being pushed upon by the weight need to resist the crumpling. A good way to do this is to roll a sheet of paper into a tube form to make the bars. Bars that are only being pulled on don't need to be more than a sheet of paper. A frame cranes are simple to make: www.lni.wa /wisha/rules/generalsafety/images/24_d2_a-frame.gif
- Q: 3years after I quit a job,I am once again looking toward the same field it's just that in my old job they helped me get a crane license when I left the job they kept my certification .How can i get that info without asking my old work for it,or would i have to take the course over?
- There is actually no such thing as a crane operators licence - you should tell your new employer that you had undertaken a course in your previous employment and were authorised by them to operate their cranes. The new employer will most likely then send you on another course and issue you with their operators authorisation. The authorisation from your old employer is not transferable to the new one so not having the certificate is not a major problem. It is however good practice for employees to receive a copy of the certificate for their own records.
- Q: how do they get cranes on top of building sites?
- With anouther crane.
- Q: How to explain and classify the types of tower cranes? What do QTZ80 and Q5510 mean?
- P---- represents flat head (without tower top), and T----- is tower crane,TC------ is the English abbreviation of tower crane, that is tower crane
- Q: I saw da construction of the upcoming tallest building in da world in Dubai,how did da crane get on top of it?
- Why do you write da instead of the? It's irritating. I apologize to you. That was rude and unkind of me.
- Q: i have a 100 ton american crawler crane. how do i calculate the psf, for this equipment.
- Not sure what you are asking exactly... Are you saying that you have a crane with a capacity of 100 tons and you want to know the pressure on the soil where the crane is positioned? In this case, you take the capacity (in pounds) plus the weight of the crane (in pounds) then divide their sum by the area of the tracks on the crane (in square feet). This will result in pounds per square foot or psf as you wrote above. These are example estimates, they may not be anywhere near the correct answer, this is simply how to do the calculation. Assumed Capacity 100 ton = 200,000 lbs. Assumed Weight 105 ton = 210,000 lbs. Assumed Area of Track = 200 square feet Note: 1 U.S. ton = 2,000 pounds = 2,000 lbs. 410,000 lbs / 200 square feet = 2,050 psf There's a start, now you just need to find out how much it actually weighs and how long and wide the tracks are to get the area of the track on the ground. I hope that answers the question you were asking.
- Q: Ok so I am now on my laptop in my room, in my bed and I am bursting for the loo, like really bad. I knew before I went to bed there was a crane fly in the hall (outside my room), so I made sure I went to the loo before I went to bed. But me being me I need it again but i have phobia of those dreaded crane flys. I went out and put the light on making sure 2 close the bedroom door, and then it started to fly towards me so I ran back to my room. I need help cause I don't know what to do?I am petrified of them. My fiance would normally move it for me but he is on night shift tonight.The last time this happend I stayed up all night and went to the loo at 7 am when my daughter got up, I don't want to do that again considering it is only 1:44 am over here
- No dude, youre confusing two different species. Daddy long legs- or Harvestmen, as they're known in the UK- are the ones with powerful venom, but fangs too short to bite a human being. Crane flies, which look kind of like a flying daddy long legs, are a species that feed one nectar only. They are not carnivorous, and they don't have fangs, or a stinger, or any other means to defend themselves. The females have a tool on their abdomens for depositing eggs. It looks kind of like a stinger, but it is not one, and can do no harm at all.Daddy long legs-spiders can not fly. Crane flies don't even live long enough to eat. Most of the species of crane flies live long enough to mate, and nothing more. Theres is no reason to fear either species. Oh, and they don't eat mosquitos. That's a myth.
Send your message to us
CMAX Tower Crane Specification with Good Quality
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords