CMAX TC5610, Developed and Applied Hydraulic Stepless Speed Regulation System
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 10 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Specification
Brief introduction of TC5610
CNBM covers an area of 320,000 square meters, with registered capital of 120 million Yuan, and has a team of over 1,000 employees, including about 150 technicians and 100 marketing personnel. Advanced coating line, CNC machining center, CNC intersecting line cutter, welding robot and various kinds of detection equipment guarantees high quality products.
Detail of CMAX TC5610
Feature:Tower Crane
Condition:New
Model Number:TC5610
Place of Origin: China (Mainland)
Brand Name: CMAX
Certification: ISO,CE
Warranty: 1 Year
Application:Building,Construction,Industrial
Main Features of CMAX TC5610
It has characteristica such as long boom, largeworking coverage, hydraulic rising, and tandem mounted tower body.
It's design idea shows advantages including simple structure and good applicability, convenient maintainability, and lower price at the same time to emphasize meeting the requirement from construction units at different levels.
It's lifting height is obviously increased thanks to its self-erecting and wall attached function.
It is applicable for construction of different industrial, commercial, office, and civil building lower than 220m, and becomes an ideal service-building machine at home.
Specification of CMAX TC5610
Free standing height (m) | 41.5 | ||
Max height with attachment (m) | 141.5 | ||
Working range can be adjusted(m) | 45、50、56 | ||
Min working range(m) | 2.5 | ||
Max lifting capacity(t) | 8 | ||
Tip load @ 50m(t) | 1 | ||
Hoist mechanism | Falls | 2 | 4 |
Lifting capacity(t) | 1.5-3 | 3-8 | |
Speed(m/min) | 0-80 | 0-40 | |
Motor | YZRDWF225M-4/8-30/30KW | ||
Trolleying mechanism | Speed(m/min) | 12/27/53 | |
Motor | YZTDE132L-4/8/16-3.3/2.2/1.1KW | ||
Slewing mechanism | Speed(r/min) | 0-0.6 | |
Motor | YZR132M2-6-3.7KW×2 | ||
Climbing speed(m/min) | 0.58 | ||
Counterweight(t) | 44m jib length | 56 | |
13 | 15.05 | ||
Mast section size(L×W×H)m | 1.6×1.6×3m | ||
Working temperature | -40-+60℃ | ||
Total power (KW) | 42 | ||
Power supply requirement (KVA) | 170KVA for generator | ||
Cable type ( within 40 meters from site power source to lower electric box of tower crane ) | |||
Startup voltage & current | 380V×95%=361V 170A | ||
Rated working voltage & current | 380V 108A |
Loading diagram:
56m jib length:
R | 2.5-15.5 | 17 | 20 | 23 | 26 | 28.1 | 29 | 15 | 50 | 52 | 56 |
a=2(t) | 3.00 | 2.91 | 2.32 | 1.90 | 1.73 | 1.03 | |||||
a=4(t) | 6.00 | 5.40 | 4.48 | 3.80 | 3.29 | 2.99 | 2.88 | 2.29 | 1.87 | 1.70 | 1.00 |
50m jib length:
R | 2.5-15.7 | 17 | 20 | 23 | 26 | 28.7 | 29 | 32 | 35 | 47 | 50 |
a=2(t) | 3.00 | 2.97 | 2.63 | 2.36 | 2.37 | 1.33 | |||||
a=4(t) | 6.00 | 5.49 | 4.56 | 3.87 | 3.35 | 2.97 | 2.94 | 2.60 | 2.33 | 2.37 | 1.3 |
Images of CMAX Tower Crane
FAQ about CMAX Tower Crane
Q: What serice you could provide?
A: Providing timely delivery, standby engineers are ready to slove any of your problem
Providing all-embraced warranty of products quality, worksite installation guidance
Providing ample spare parts and training of operation and maintenance
Engineers have more than 20 years' experience in tower crane, ready to solve any of your problems.
Q: What kind of steel used for tower crane ?
A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.
Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?
A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working
Q:Structure
A:Tanks to the advanced design tools, such as electro-mechanical design, CAD design, optimization design, and modular design, the tower crane proves to be a kind of optimum construction equipment that shows not only superb strength, stiffness and fatigue resistance but also outstanding comprehensive performance and reliability.
- Q: What are the special operators of tower cranes?
- The tower has special operations personnel of heavy machinery refers to the construction site in the tower crane division signal cable, installation and disassembly, the driver, and the demolition work of gondola installation, may cause serious harm to themselves, others and the surrounding facilities operations personnel.
- Q: Does anyone know how to make an origami crane ring out of a single dollar bill? I know it's possible, because I've seen a picture.
- Money Origami Crane
- Q: The role of slewing limiter in tower cranes is limited
- All kinds of electrical equipment protection limit device and limit position and cap mechanical limit, overload protector.The most important is the anti drop protector!
- Q: It's better if the explanation is not complicated.TQ
- Hello, 1. Modularity: You can build ships (larger ships) in modular sections and have the crane lift these modular sections and put them into place for final assembly. This is one major advantage that was not available back in the day
- Q: Can anyone help me interpret the poem Fear by Hart Crane? or North Labrador?
- Analysing Poetry Close reading may seem like a foreign and unfamiliar approach to analyzing a piece of text. However, it can often yield insights that will help you to create a unique paper developed from your own interpretation of the text. To analyze the work effectively, it is useful to concentrate on specific components of literature used to build and reveal the themes in the work. This process will help you explain how a passage relates to central themes in the text allowing you to reach an intelligent and creative thesis for a literary analysis. First, choose a passage (or a series of passages) that intrigues you.
- Q: Is it through the rails? if so, then how? or is it by another method?
- Hot rails running along side the beams Hot shoes on the crane make contact with the hot rails and slide along the hot rails. Hot rails mounted to the beams by insulating bells. The hot rails can be anywhere in size from trolley wires to rails the size of railroad track rails. AC cranes are usually 3 phase so they will have 3 hot rails. DC cranes will usually have just 2 hot rails. Main disconnect/lock out feeds hot rails. It is usually fused but can also be just a disconnect switch. The same arrangement also is used on the crane's trolley. But in the case of the trolley one set of hot rails feeds the trolley motor. One set of hot rails feeds the main hook {big hook} motor: One set of hot rails feeds the auxiliary hook motor {little hook} motor. If the crane is also used as a Mag crane {Electro magnetic can be used} it will also have a set of hot rails going to the trolley for the magnetic
- Q: What prior education and skills are needed to become a Crane operator ?
- A basic education is required, no need for major courses. Skills however is developed through training. One is communication skills using a radio. Because crane operators have a partner called rigger, who overlooks the movement of crane below while telling instruction to the crane operator. Another skill is synchronization. Crane operators should possessed good movement synchronization and operation of levers and buttons inside his cabin. Another is good eyesight. Lastly, safety skill. Operators should know the capacity or the equipment he is operating and the calibration of the machine he is using.
- Q: Under what circumstances are winches used and under what circumstances tower cranes are used?
- 1, this depends on the specific construction organization design, the general height of less than 20 meters, all with the hoist.2, the framework of the structure, four, 18 meters, construction area, if large, with tower cranes, of course, labor-saving, time-saving and rapid progress, if the construction side agrees, it is best to use tower cranes.3, artificial wages are too high, the project is big, with the winch is not worthwhile, progress can not catch up, workers are also big grievances. The track type tower crane is usually used in shipyard or fixed freight yard.
- Q: I am looking for guidance on determining the optimal design parameters for the design of an overhead travelling crane when considering a span of 60m and a lift requirement of 2500Tonnes. If not possible what would be the maximum lift for the same span
- Is this for a nuclear power station? If 2500 Te and 60m really are the specified loads and span then it is likely that it will be used very seldom. In theory you can design for any load to be lifted but maintenance on a crane system that is used once a year (10 years?) is a real problem. The main items to consider are: Availability of winches and bogies which then dictates running beam and rail sizes. For the spanning beam several alternative sizes needed to be designed and then costed. It will be not just weight but transport costs that determine the most efficient sizes The overall height of the crane will then determine the required roof height assuming that the crane is under cover. For comparison the Harland and Wolf cranes in Belfast called Samson and Goliath can lift 840 Tonnes each. Overall design needs to consider speed of travel, acceleration and deceleration rates and a host of other things.
- Q: Vtwin doc helped me out with this dam thing recently Im thinking he has the 411! So here goes: My friends coil went bad and we used a single fire coil on a dual fire ignition. V twin doc showed me how to do that. But it still doesnt quite run proper. So here are the settings:Its set at 5900 R.P.M. limit,with advance slope at 9.the rear cylinder is set at 0.Its set on dual fire,its set on electric start.and its set on multi spark not single.Its a crane fireball hi 4e model 8-3100. It cranks for a bit before starting and runs a little rough at low R.P.M. ran just fine with the stock coil.
- Crane Fireball Ignition
Send your message to us
CMAX TC5610, Developed and Applied Hydraulic Stepless Speed Regulation System
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 10 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords