Clear Stress Rhombic Form Traveller
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
RHOMBIC FORM TRAVELLER
The rhombic form traveller has the advantages of simple structure, clear
stress, big operational space under the main frame, and easy installation
and removal, etc..
The form traveller adopts wheels with bearing while rolling forward which
reduce the frictional resistance greatly during movement; At the same
time, the stainless steel paltes are welded on the rails which reduced
the frictional resistance bewwen the sliding bearing and the rails during
movement. The combination of these reduce the movement cycle of the
form traveler by simple and convinient operation.
In terms of safety, the form traveler is equiped with walking protection
system which guarantee the absolute safety during working. It’s safe, easy
and practical.
● Low gravity of front trancerse beam
● Applicable to large-scale stay-cable cantilever casting bridge with wide bridge deck
● Safe & easy operation, easy fixing, and safty during walking
● Big operational space under the main frame, and easy installation and removal
- Q: Under what circumstances the use of hanging basket construction under what circumstances with full support construction
- If you are in need of some relatively flat, bridge bridge, scaffording height is not high, can try to use the full scaffold construction, all with full scaffold construction, so that the safety, economy and engineering quality is easy to control.
- Q: Construction scheme of hanging basket
- Each pier is equipped with 23 cantilever sections: 5*2.5m + 5*3.0m + 5*3.5m + 8*4.0m. Beam length of 4.0m, maximum weight 156 tons. The cross section of the box girder: the width of the top plate is 15.42m, the width of the web is 7.5m, and the height of the beam is changed from 0 8.8m to the 3.0m of the block 23 according to the two parabola.
- Q: What is the reference standard for hanging basket preloading
- Before 5.1. preloading, it is necessary to fasten the tension rod of the anchor system, especially the pull rod of the back pressure system and the front cross beam system, so that the tension force can be even.5.2. preloading, with 10 tons for a level two basket symmetrical at the same time, a total of 100 tons of load on each side, each load time must be very carefully observe the guide beam elevation, and paying close attention to the hanging basket system whether there is a significant change
- Q: What is the bridge hanging basket through hole
- Is the pier construction after the hanging basket construction of continuous beam structure!
- Q: Summary of the hanging basket construction
- Cable stayed bridge is a bridge deck system, the support system of the bridge, the bridge deck system with stiffening beam, the supporting system is composed of steel wire.In 1956, the Stromsun bridge in Sweden began the apex of the modern cable-stayed bridge. With the development of material science and computer science, a lot of cable-stayed bridges have been built at home and abroad. The cable-stayed bridge has been developed rapidly because of its advantages such as large span, good structural performance, simple construction, easy maintenance, low cost and attractive appearance.
- Q: Hanging basket assembly quality control point
- The hanging basket according to the different structures and stress characteristics, divided into parallel truss basket bowstring, hanging basket, triangle hanging basket and basket, mainly in the following triangle hanging basket as an example.
- Q: Combined with the hanging basket pouring construction process, the paper puts forward the quality control points and methods of hanging basket continuous casting box girder
- Hanging basket when walking, hanging basket as far as possible to do the same time, the difference between the asymmetric distance between the hanging basket is 5cm;One must be responsible for observing the synchronization of walking, the two person is responsible for observing the operation of the walking anchor beam, the two is responsible for observing the operation of the outer die frame bearing;
- Q: You know how space travelers are astronauts and time travelers are crononauts? Well, what is the naut form of an inter dimensional traveler? (Obviously in fiction).
- Internaut? ;) I don't think one exists yet. You could try making it up. If Cosmos is the universe and inter-dimensional travel is travelling between different parallel universes, maybe it should be Cosmonaut (though the Russians already took that one...)
- Q: Short platform pull rope type hanging basket
- The construction scheme for main bridge superstructure: installation of steel pipe column bracket in the cap on the box girder construction 0, No. 1 block on the bracket; 0, 1 complete block construction after the erection of rhombic hanging basket, piecewise symmetric cast until the completion of the No. 18 block construction (including 7 ~ 17 block cable block), forming the largest cantilever structure of T, and then by the side span to middle span by span symmetric closure.
- Q: I'm British and traveling to Cuba whats the best form of travelers cheque to buy?
- Thomas Cook or VISA travellers cheques...any traveller's cheques that are NOT from a US financial institution are accepted. Most banks, CADECA offices, hotels, and businesses charge commissions of between 1% and 5% for cashing traveller's cheques.
Send your message to us
Clear Stress Rhombic Form Traveller
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords