CHTDHorizontal, ultra-high-pressure barrel casing pump
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 10 unit/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Design |
Overview of technical data
Type of installation | Long- coupled |
Maximum drive rating | 40000. 00 kW |
Type of bearing | Plain bearings |
Drive frequency | 50 Hz / 60 Hz |
Maximum flow rate | 3. 600 m³/h |
Maximum discharge-side pressure | 560 bar |
No. of impeller entries | Single / Double entry |
Casing material | Chrome steel; Carbon steel |
Suction characteristics | Non- priming |
Drive voltage | Low voltage, high voltage |
eClass assignment | 36410101; 36410000;36410100;36410104 |
Other impeller types | Closed / Radial |
Barrel casing | Yes |
Pump set location | Dry installed |
Type of suction casing | Annular casing |
Max. permissible fluid temperature | 210 °C |
Type of discharge casing | Annular casing / discharge volute |
Type of first impeller | Single entry / Double entry |
Main applications | Energy; Industry and process engineering |
Type of installation | Stationary |
Type of connection | Flange, weld ends |
Type of lubrication | Grease / Oil / Pressurized oil lubrication |
Type of drive | Electric motor, turbine |
Installation position | Horizontal |
Maximum suction pressure | 40 bar |
Type of coupling | Geared variable speed coupling; Gear;Variable speed coupling;Direct |
Shaft seal type | Mechanical seal; Floating seal |
Maximum head | 5. 300,00 m |
Type of stage casing | Stage casing with diffuser |
Nozzle position | Variable |
Casing partition | Radially split |
- Q:any indian links for machinery and equipment?
- find as many as links from below site
- Q:Do you operate heavy machinery?
- not really, an electric chair
- Q:I am looking for the Leather Picker , Leather Buffer and Picking Stick use in Power Looms, Kindly make contact with me from Pakistan Only with cheap best quality . Any person who can help out me please make contact with me on this email address
- LEATHER PICKERS NO. 22 (L) FOR TURKISH MARKET. LEATHER PICKERS FOR CARPET LOOMS. LEATHER BUFFERS FOR SAKAMOTO LOOMS. HIGH COMPRESSED WOOD SHUTTLES FOR COTTON IN DIFIRENT SIZES. HIGH COMPRESSED WOOD SHUTTLES FOR AUTO LOOMS IN DIFIRENT SIZE. HIGH COMPRESSED WOOD PICKING STICK OF ALL TYPS. HIGH COMPRESSED WOOD SIDE LIVER.
- Q:I am thin and have this layer of fat over my abs that I want to get rid of. In order for your answe to be believable, please tell me your routine methods that you do thru out the work out time. I know Cardio will lose it, but I just want to know how long am I suppose to do it and how many days should I do it. Also, name me the foods I need to avoid and the ones I need to consume and how much of a portion should I eat (Im 5'11 weighing 171). My arms and legs are in pretty good shape, but the belly has got to go! My abs will be visible with your help
- this is a fun workout for abs (if you can get past the cheesy instructor and music) You should feel it work straight away. DO it once, twice or three times a day if you're up to it. As for cardio.. jump rope, running and swimming are all easy ways to get the heart pumping and fat burning.. go for a run/swim in the morning and at night, and jump rope in spare time.
- Q:About rubber machines, such as Intensive mixer, kneader, pelletizer, extruder, mixing mill...etc.
- Call one or look in the yellow pages.
- Q:On July 23 of the current year, Serena Mining Co. pays $4,612,500 for land estimated to contain 5,125,000 tons of recoverable ore. It installs machinery costing $512,500 that has a 10-year life and no salvage value and is capable of mining the ore deposit in eight years. The machinery is paid for on July 25, seven days before mining operations begin. The company removes and sells 490,000 tons of ore during its first five months of operations ending on December 31. Depreciation of the machinery is in proportion to the mine's depletion as the machinery will be abandoned after the ore is mined.how to calculate the first five months depreciation on machinery??
- While the machinery has a ten year life, it will only be used for eight years and then become abandoned. So we first do $512,500 - $0 and then divide by 8 years to get $64,062.50. That's how much depriciation the machinery accumulates per year. Since we're looking for the first five months of accumulated depreciation, we take $64,062.50 and multiply it by (5/12) months. That comes out to $26,692.71.
- Q:When a crematorium, for instance, which is not an industrial building but requires heavy machinery, is constructed, are the environmental systems, like HVAC and mercury abatement systems, or the actual furnaces themselves brought to site in pieces and assembled at first fix stage or put in place before the roof or slab above goes on? Or are they just serviceable by a separate large entrance?
- Large entrance is best. Long ago setting equipment then constructing the walls was a common practice. When the original machines need to be replaced it is a problem.
- Q:a) it involved a modified version of electron transportb)it was assembled from two anaerobic systems that had originated in different types of bacteriac)it evolved relatively late in the evolution of prokaryotes, sometimes after eukaryotes had arisend) it obtains electrons by splitting watere) it caused Earth's atmosphere to become an oxidizing one
- b) it was assembled from two anaerobic systems that had originated in different types of bacteria
- Q:i want to find some suppliers who can provide corn germ oil machine and macaroni machine
- corn oil; do you mean bio diesel or other? macaroni machine?
- Q:For example: Humans vs. Artificial humans (robots)
- Heres a few I could think of. Salmon vs Hydroelectric dam Barnacles vs Boat Weathering and Erosion vs Road Rust vs Car
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
CHTDHorizontal, ultra-high-pressure barrel casing pump
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 10 unit/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches
Related keywords