Cable control cable
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Specifications
high elastic silicone rubber
strong anti-tracking and radiation resistance
27.5kV XLPE cable indoor terminal
27.5kV XLPE cable outdoor terminal
27.5kV XLPE cable middle connector Features
1, reliable insulation: imported high elastic silicone rubber preform, always maintain the right radial pressure on the cable body accessories are installed, linked closely together, not for cable runs respiration and interface breakdown within the interface. Stress control part of the main insulation composite as a whole, to effectively solve the problem of electric cable outer shield the fracture stress concentration, to ensure that the insulation, the safe operation;
2, environmental adaptability: the product has a very strong anti-tracking and radiation resistance, excellent weather resistance, corrosion resistance, anti-foul, anti-aging advantages, suitable for high altitudes, cold areas, wet areas, salt fog areas heavily contaminated areas;
3, the selection of fit: the cold shrink structure, each specification is applicable to a variety of cable diameter;
Easy to install: all products are factory preforms, install and operate, no special training, saving time and effort. The shrink Installation solve cable accessories contraction is not tight or loaded into the phenomenon, reducing the quality accidents caused due to improper operation.
Technical parameters
27.5kV XLPE cable terminal
No. | Test item 1) | Test requirements | |
1 | AC withstand voltage or DC voltage withstand AC withstand |
124kV, 5min or 110kV, 15min 110kV, 1min, rain 2) Flashover, no breakdown |
|
2 | Partial discharge | At ambient temperature, 48kV, ≤ 5pC |
|
3 | Impulse voltage test in θt3 4) below) | 250kV, ± 10 times |
|
4 | Constant pressure cycle test (In air) | 3 cycles of 5), in 69kV and θt environment |
|
5 | Partial discharge | 48kV, at ambient temperature, and the θt environment, ≤ 5pC |
|
6 | Constant pressure cycle test (In air) | 60 cycles, in 69kV and θt environment |
|
7 | Soak Test 2) | 10 cycles |
|
8 | Partial discharge | 48kV, at ambient temperature, and the θt environment, ≤ 5pC |
|
9 | The short thermal stability (shielded and armored) | Cable shield ISC, short circuit, and no visible damage. |
|
10 | The short thermal stability (conductor) | Elevated to the cable conductor QSC, short circuit, and no visible damage |
|
11 | Short circuit dynamic stability | Id under short circuit, no visible damage |
|
12 | Impulse voltage test | 250kV, ± 10 times |
|
13 | AC withstand | 69kV, 15min |
|
14 | Wet test 6) | 34.5kV, 300h, no flashover, no breakdown, tripping over three times, and no significant damage 7) |
|
15 | Salt Spray Test 2) | 34.5kV, 1000h, flashover, without breakdown, the trip does not exceed three times, and no significant damage |
|
27.5KV XLPE cable middle connector
No. | Test item 1) | Test requirements | |
1 | AC withstand voltage or DC voltage withstand | 124kV, 5min or 110kV, 15min |
|
2 | Partial discharge | At ambient temperature, 48kV, ≤ 5pC |
|
3 | Impulse voltage test (In θt2) 3) below) | 250kV, ± 10 times |
|
4 | Constant pressure cycle test (In air) | 3 cycles 4), in 69kV and θt environment |
|
5 | Partial discharge | 48kV, at ambient temperature, and the θt environment, ≤ 5pC |
|
6 | Constant pressure cycle test (In air) | 30 cycles, in 69kV and θt environment |
|
7 | Constant pressure cycle test (In water) | 30 cycles, in 69kV and θt environment |
|
8 | Partial discharge | 48kV, at ambient temperature, and the θt environment, ≤ 5pC |
|
9 | Short thermal stability (Shielded and armored) | Cable shield ISC, short circuit, and no visible damage. |
|
10 | Short thermal stability (Conductor) | Elevated to the cable conductor QSC, short circuit, and no visible damage |
|
11 | Short circuit dynamic stability | Id under short circuit, no visible damage |
|
12 | Impulse voltage test | 250kV, ± 10 times |
|
13 | The middle joints machinery impact test 6) | The standard Appendix H.1 |
|
14 | AC withstand | 69kV, 15min |
|
- Q: What are the two power distribution equipment?
- Primary equipment is the equipment used in the main system of transmission, transmission and distribution
- Q: What are the general requirements for working on distribution equipment?
- Distribution equipment including high voltage power distribution room, substation, power distribution transformer platform, low voltage power distribution room (box), ring network cabinet, cable branch box] outage maintenance,
- Q: AC distribution equipment including distribution box
- Connect the power supply, transformer, converter and other equipment for load distribution box, and monitoring
- Q: What is the power equipment in the distribution room?
- 10kV and below voltage rating equipment, divided into high voltage distribution room and low-voltage distribution room
- Q: What is the difference between power supply and distribution
- The problem is you estimate from the injection test out the electric power, is the power system of power plant and the national grid is responsible for part of the design, the design of power plant and power lines, its design must be designed by a qualified electric power design institute
- Q: What is the role of transmission system and distribution system in power grid
- The distribution of power resources and power load centers in most countries in the world is inconsistent.
- Q: High and low voltage distribution equipment
- Low voltage distribution equipment: low voltage distribution panel, switch cabinet, switch board, lighting box, power box and motor control center.
- Q: Transmission lines are not electrical equipment?
- Transmission lines are not electrical equipment? The answer is: the device is a function of the assembly
- Q: Transmission and transformation equipment
- High voltage has a very high risk, and the target electrical appliances do not need such a high voltage, which needs to reduce the voltage through the transformer
- Q: Power distribution equipment should be prepared before the blackout?
- electrician received power outage notice, pull down the knife switch, accept fuse.
Send your message to us
Cable control cable
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords