GW22,126KV semi-pantograph disconnector switch
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 400 unit/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
GW22,single column,single arm,vertically shrinkable,AC,126KV semi-pantograph disconnector switch
- Q: What are the general requirements for working on distribution equipment?
- When the high voltage line is not cut off, the person in charge of the work shall explain to the whole staff that there is electricity on the line and strengthen the monitoring
- Q: DC transmission equipment
- Power supply operation of power plant and substation in nowadays are used in DC power supply, it provides power for the control of the load and power load and DC emergency lighting load, is the foundation of modern electric power system control and protection
- Q: What is the power equipment in the distribution room?
- 10kV and below voltage rating equipment, divided into high voltage distribution room and low-voltage distribution room
- Q: What is the difference between power supply and distribution
- The problem is you estimate from the injection test out the electric power, is the power system of power plant and the national grid is responsible for part of the design, the design of power plant and power lines, its design must be designed by a qualified electric power design institute
- Q: Distribution system equipment classification
- Special equipment used in a certain industry, such as artillery, automatic teller machine, steel making furnace, etc.
- Q: High and low voltage distribution equipment
- High voltage distribution equipment: high voltage fuse; high voltage isolation switch; high voltage load switch; high voltage circuit breaker.
- Q: What is the transmission line, what is the power distribution equipment
- Usually an overhead line, a very small number of lines (or some of them) is a cable line
- Q: Transmission and transformation equipment
- Transmission and transformation of basic electrical equipment, including the main wire, transformers, switchgear, high voltage insulators, etc.
- Q: Power distribution equipment should be prepared before the blackout?
- after the high and low voltage power failure, the work must be carried out before the first inspection
- Q: CHINT group in the transmission and distribution equipment to do it?
- The national grid is not purchasing some equipment of CHINT, CHINT group is now very powerful
Send your message to us
GW22,126KV semi-pantograph disconnector switch
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 400 unit/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches
Related keywords