• Building Construction Elevator with Max Hoisting Load 4t SC200/200 System 1
  • Building Construction Elevator with Max Hoisting Load 4t SC200/200 System 2
  • Building Construction Elevator with Max Hoisting Load 4t SC200/200 System 3
Building Construction Elevator with Max Hoisting Load 4t SC200/200

Building Construction Elevator with Max Hoisting Load 4t SC200/200

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
120 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

SC200/200 Description

Feature: Tower Crane                   Condition: New 

Application: urban construction      Rated Loading Capacity: 4T 

Rated Lifting Moment: 100MT        Max. Lifting Load: 4T 

Max. Lifting Height: 150M               Hoisting Speed: 34.4m/min

Model Number:  SC200/200 

Certification: ISO9001:2000; CE;Ukraine & Belarus Certificate 

Colour: Orange/ Yellow 

After-sales Service Provided: Overseas third-party support available 

SC200/200  Features

1. With automatic welding robot for tower crane structures.

2. Export to more than 20 countries with CE/ISO Certificate.

3. Stationary or Fixed or Inner Climbing tower crane

4. Impeller blasting or rust protection paint

5. Advanced painting process and excellent color 

6. New designed mast, can be used to Internal and external climbing

7. Famous brand mechanism system, Schneider Electronic control box, jiangte and jiuhe motor

SC200/200  Specification

Building Construction Elevator with Max Hoisting Load 4t SC200/200

SC200/200  Pictures 

 


Building Construction Elevator with Max Hoisting Load 4t SC200/200

Building Construction Elevator with Max Hoisting Load 4t SC200/200

Building Construction Elevator with Max Hoisting Load 4t SC200/200


SC200/200  FAQ

 My dear friends, If you need any building construction elevator , please tell us the below basic parameters:

1. Building height or tower crane working height.

2. Max load capacity and tip load capacity.

3. Span or jib length

4. Other Special requirements 

Welcome to contact us! Believe will be your best choice!


 

 

 

 


Q:Why is there as much evidence of Icabod Crane, as there is of god??
Ichabod Crane is real! He has big feet, just like in the cartoon! And you can't tell me otherwise!
Q:where can i find the xxx video of bob crane?
I think they're in police custody or destroyed. Some of the women in his videos were suspects (or at least persons of interest). Police feel his murder may have been by a jealous husband or boyfriend. In just recent years someone was tried for the murder and they were found not guilty. If you ever do find videos of Crane tell me where.
Q:An Episode Of War by Stephen Crane
Crane saturates his writing with similes and metaphors.
Q:who has made a origami crane? how hard was it?
A okorder /
Q:Does anyone know how to make an origami crane ring out of a single dollar bill? I know it's possible, because I've seen a picture.
Sorry I can't give you the specific information you want. This site might link you up to a site that is more helpful. members.
Q:Can anyone help me interpret the poem Fear by Hart Crane? or North Labrador?
Analysing Poetry Close reading may seem like a foreign and unfamiliar approach to analyzing a piece of text. However, it can often yield insights that will help you to create a unique paper developed from your own interpretation of the text. To analyze the work effectively, it is useful to concentrate on specific components of literature used to build and reveal the themes in the work. This process will help you explain how a passage relates to central themes in the text allowing you to reach an intelligent and creative thesis for a literary analysis. First, choose a passage (or a series of passages) that intrigues you.
Q:What is the name for a group of cranes?
Here okorder /.. For Magpieix - a sedge of cranes is equally correct, as is a construction of cranes; some collectives have more than one description! ;)
Q:A. Designated operatorsB. All construction site personnelC. InspectorsD. All of the above
Crane are extremely dangerous and complicated machinery , the operators need intensive education and training , they have to pass the required tests to be certified . Now even the signal guy on the ground who helps the crane operator needs to be certified . So your answer is A.
Q:Is there a certain direction and reason a construction worker will leave a crane facing a certain direction.
I don't think there is a particular direction unless prevailing winds are a factor. Here in Las Vegas, cranes, when idle don't seem to have a pattern. At least from what I have seen.
Q:do they get the concrete blocks up that hang at the end? Do they use another type of crane to assemble them?
Tower cranes assembly starts with the foundation of the crane with lot concrete blocks for fixing, then they fix the first bottom part of the crane then they fix the boom with the counter weights, when they want to extend the height, they fix a jack up machine which lift up the boom and then insert a vertical piece and so on till they reach the required height. During the first installation they use a small mobile crane and then after the crane it self lift and fix the pieces

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords