• Building Construction Elevator 2T SC200/200 System 1
  • Building Construction Elevator 2T SC200/200 System 2
  • Building Construction Elevator 2T SC200/200 System 3
Building Construction Elevator 2T SC200/200

Building Construction Elevator 2T SC200/200

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
120 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

2T SC200/200 Description

Feature: Tower Crane                   Condition: New 

Application: urban construction      Rated Loading Capacity: 4T 

Rated Lifting Moment: 100MT        Max. Lifting Load: 4T 

Max. Lifting Height: 150M               Hoisting Speed: 34.4m/min

Model Number:  2T SC200/200

Certification: ISO9001:2000; CE;Ukraine & Belarus Certificate 

Colour: Orange/ Yellow 

After-sales Service Provided: Overseas third-party support available 

2T SC200/200  Features

1. With automatic welding robot for tower crane structures.

2. Export to more than 20 countries with CE/ISO Certificate.

3. Stationary or Fixed or Inner Climbing tower crane

4. Impeller blasting or rust protection paint

5. Advanced painting process and excellent color 

6. New designed mast, can be used to Internal and external climbing

7. Famous brand mechanism system, Schneider Electronic control box, jiangte and jiuhe motor

2T SC200/200 Specification

Building Construction Elevator 2T SC200/200

2T SC200/200  Pictures 

 


Building Construction Elevator 2T SC200/200

Building Construction Elevator 2T SC200/200

Building Construction Elevator 2T SC200/200


2T SC200/200 FAQ

 My dear friends, If you need any building construction elevator , please tell us the below basic parameters:

1. Building height or tower crane working height.

2. Max load capacity and tip load capacity.

3. Span or jib length

4. Other Special requirements 

Welcome to contact us! Believe will be your best choice!


 

 

 

 


Q: Which kind is better, gantry crane or tower crane?
Each has advantages, the use of different conditions, the use of different cranes, tower cranes can not move, but the lifting height can be very high, the door machine has tracks can be vertical and horizontal movements, lifting height, tower crane is not high.
Q: how to do tower crane maintenance?
Tower cranes in construction is being inspected as part of everyday maintenance. Usually, Safety In charge or a mechanical engineer do the inspection on site. Some pointers for inspection are: 1. Machine checking including motor 2. Emergency break 3. Lifting cable checking 4. Power panel 5. others Not only the tower crane is being checked, the operator and rigger also attends daily safety toolbox to update themselves on daily safety hazards on site
Q: how many different types of cranes and winches are there?
A bit more information might help. In England there are Winches and then there are winches. As for Cranes are we talking about birds.........actually there are only a few type of each.......but there can be quite a few variations of the basic types. let's say 6 types of cranes and 4 or 5 winches.
Q: A. to make everyone become a CommunistB. to become rich at the expense of othersC. to kill all the villagersD. nothing in particular
The main idea of Cranes by Hwang Sun-Won is more of a symbolic thing; he uses different objects such as chestnuts and cigarettes, as well as the cranes in the story to convey his hope and his dream, along with his message. He is expressing the power of war, particularly civil war, which can rip apart families, neighbors and the best of friends. The story, unlike many other tragic civil war tales, is not focused on the idealogical difference btw Tok-Chae and Song-Sam. Rather, it is about the human tragedy of the Korean War. Tok-Chae and Song-Sam were ripped apart by the War. Song-Sam, on his return to his village, he finds Tok-Chae and decides to escort him to a Public Peace Police office a few miles away. On the way, he gets flashbacks and talks with Tok-Chae. These things help to change his mind and he frees Tok-Chae. This is symbolized by the two cranes which soared high into the sky. Hwang-Sun Won conveys his message effectively; unification will be achieved and is needed to repair such ties like Tok-Chae and Song-Sam. He is saying that the two cranes will fly together once more.
Q: I've been watching Passions for years and I don't understand what in the world is going on between Fancy and Pretty Crane... what did Pretty do to her??
i really want to know but they have not said yet. and i am a daily passions watcher :] record it every day !
Q: Can paper crane symbolise your love for a girl?
In the 1940's a girl named Sadako got leukemia from the atomic bomb that was dropped on Japan and she folded 1000 paper cranes to get a wish.... It has since become an international symbol of peace and the legend that it can grant a wish if 1000 are folded is still around.
Q: I want this as a tattoo but I want to know what it means. Why type of tree is it? What do the symbols translate into?
I believe you're beautiful I additionally consider self aware however I seem how I seem so simply be you and do not begin dressed in a lot of make up given that that's what I have performed and now i are not able to go away the apartment with out dressed in alot given that I believe I seem even uglier. Stay how you're
Q: What do lattice boom and hydraulic boom in cranes mean?
LATTICE BOOM: See first link. This is where the boom (the portion used to support the load) is made like a lattice ... i.e. interconnected trusses and girders. The cables for lifting the load are run from the base of the boom to the load over pulleys/gears located at the boom's tip. The boom itself is NOT adjustable in length or in angle. HYDRAULIC BOOM: See second link. This crane uses hydraulics to adjust either the length of the boom, or the angle at which the boom joints intersect. It looks more like a single beam construction, although its probably closer to a tube type design (hydraulics may be inside or outside the arm). The load is raised/lowered by cables operating at the end of the boom ... not necessarily tied back to the bottom of the boom.
Q: I want to make a sculpture out of 1,000 paper cranes. I have sometime to work on it, but not months. Has anyone ever known someone to do this, or done this themselves? How much time should I allow for such a project?
It depends on how big they are, and how fast you are at folding. If you can fold one crane a minute, 1000 minutes would translate to about 17 hours. How you then spread out 17 hours of paper folding is up to you.
Q: So, this might seem like an odd question, but here goes.I work in an office and outside the windows there's a crane. Every day I come in from work, it has turn a little. The half-finished building that it stands next to is not being worked on and there's never anyone using the crane during the day. There's no other construction going on in the area is stands at.It's pretty high up like 6th to 7th floot and it's in a windy town. Does that matter?Why would someone turn around a crane during the night? Is it all a scheme to make me paronoid because they know I'm starring out the window most of the day?
I guess it would be pretty windy up there at the top - maybe it is not fully locked, and the wind blows it around a little bit.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords