Bridge and constrction support cup lock scaffolding
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 10000 PCS
- Supply Capability:
- 10000 PCS/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Brand Name: | Rapid Scaffold | Model Number: | RS |
material: | steel | Surface finishment: | Hot-dip galvanized |
Packaging & Delivery
Packaging Detail: | pallet packing |
Delivery Detail: | 25-40 days |
Specifications
material Q345
tube size 48.3*3.2mm
surfacing hot-dip galvanized
the usual size 0.5-3m
Product Description
Why choose us
1. professional scaffold manufacturer
2. timely delivery
3. authorty certification
4. technical support
5. 8 years' experience
6. 6S management
We ensure your goods can be delivered safely:
1.Experienced packer and technician
2.Standard rack
3.Long-term cooperative freight forwarding and shipping company
We ensure your goods can be delivered safely:
1.Experienced packer and technician
2.Standard rack
3.Long-term cooperative freight forwarding and shipping company
Certificates
As a professional scaffolding manufacturer for years' experience in China, we have obtained many certification authority, including ISO9001:2008, ISO14000, CE, OHSAS18000 and our products are also tested to meet USA standard (ANSI A10.8), Australia/New Zealand standard, Japanese standard.
- Q: How to calculate the fastener type steel pipe scaffold
- The provisions of 1.1.4 in steel pipe scaffold structure thin-walled steel structure design, involved in the weld connection, the stability coefficient of the axial compression members, should use the "technical specification for Cold-Formed Steel Structures" (GBJ18-87).1.1.5 provides for the design and calculation of scaffolding:(1) the calculation of the overall stability of the frame (can be converted into the calculation of the stability of the opposite pole);(2) checking the strength, stability and stiffness of horizontal bar;(3) calculation of strength and stability of attached and continuous wall;(4) anti overturning checking;(5) checking of foundation and supporting structure.
- Q: The bottom of the cantilever scaffold must be provided with the sweeping rod
- Product quality certificate and inspection report. Rust must be replaced, not to be used to build the frame.
- Q: I'm trying to understand a problem in my physics book. The problem is this:A person is pulling on a rope, that is connected to a pulley on the ceiling. The rope then goes to a box with a pulley on it, and then up to the ceiling where the rope is connected (to the ceiling).The rope and pulleys are massless and frictionless.The book lists three forces (tension forces) going up and one weight force pulling down.My question is, why isn't there another force pulling against the tension of the rope from the guy pulling the rope?
- a million. pass to: study your answer on your question internet site. 2. form in: Newton/2nd regulation of action/guidance/info? 3. pass to: Newton's 2nd regulation of action, an get admission to on internet site considered one of headings provided. examine the precis on the precise of the internet site and something you prefer/prefer under the crimson field interior the middle of the internet site.
- Q: The latest JGJ130-2011 construction fastener type steel pipe scaffolding safety technical specifications, schedule A.0.2 what role, how to correctly use it?
- Schedule A.0.2 role: the calculation of scaffolding, the need to calculate the bearing capacity of the scaffolding
- Q: I think that'd be extremely entertaining.
- new jack dont want to work with wwe
- Q: why scaffold need for inspected within the preceding 7 days and after adverse weather condition?
- It is a work safety issue. Past experience has shown that scaffolding sometimes gets modified by unqualified people (or weather) resulting in injury or death.
- Q: Which loads are considered in the design of the scaffold
- 1 the weight of the frame structure: including the vertical rod, vertical horizontal bar, horizontal horizontal bar, scissors, fasteners, etc.;2) structure, accessories weight: including the foot board, railings, foot boards, safety nets, such as the weight of protective facilities.
- Q: A 67.0- painter is on a uniform 21- scaffold supported from above by ropes. There is a 3.8- pail of paint to one side. The ropes are 1m inside the scaffold on each side. The pail is 1m away from the left rope and 3m from the right rope. The scaffold is a 6m. How close to the right end can he approach safely? How close to the left end can he approach safely?
- First of all...no units, no answer. Second of all...according to OSHA (Occupation Safety and Health Administration), NO ONE can walk on a scaffold beam outside the support ropes OR SET ANY OBJECT DOWN outside the support ropes. Hence the answers for both questions are 1 meter. It doesn't matter what a calculation will yield...NO ONE can walk on the beam outside the support ropes safely. Even if a torque balance yields that it will not put the ropes in compression and buckle them...it still isn't considered to be safe by OSHA if the painter is outside the ropes.
- Q: From the Scarlet Letter, Ch. 10-12
- Haven't read this book in years but I believe he goes back to the scaffold at night because he is being eaten away by guilt. It is a type of redemptive action, just as Hester had to stand there and be judged for her sins he feels the need to also stand there on the scaffold with Hester (theoretically) and be judged/punished as well, the only difference, of course, is that he does it under the cloak of night, when no one can see him.
- Q: Which accessories are included in a movable scaffold
- Mobile scaffolding is the main frame, cross frame, cross diagonal brace, foot board, adjustable base and other components. The cross rod is also called the diagonal pull rod, and is a cross connecting rod which is vertically connected with the two door frames. The part of both ends of the rod part is punched with a pin hole, and the locking pin on the vertical rod of the door and the frame is locked when assembling.
Send your message to us
Bridge and constrction support cup lock scaffolding
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 10000 PCS
- Supply Capability:
- 10000 PCS/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords