• Shoring Frame Scaffold/  Ladder Frames  System System 1
  • Shoring Frame Scaffold/  Ladder Frames  System System 2
  • Shoring Frame Scaffold/  Ladder Frames  System System 3
  • Shoring Frame Scaffold/  Ladder Frames  System System 4
  • Shoring Frame Scaffold/  Ladder Frames  System System 5
  • Shoring Frame Scaffold/  Ladder Frames  System System 6
Shoring Frame Scaffold/  Ladder Frames  System

Shoring Frame Scaffold/ Ladder Frames System

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
100 set
Supply Capability:
10000 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Shoring Frame Scaffold/  Ladder Frames  System 


Outside Diameter: 1.625" 
Wall Thickness: 0.095" 
Lock: Drop Lock 
1st Lock: 6" from top of frame leg 
Lock Span: 4'

Coupling Pin Hole: Drilled at 45° Angle 
Coupling Pin Hole Location: 2½" from the top of the frame leg. 
red powder coating prevents rust and minor scratches.

 

Frame Scaffolding Advantages:
1) Reasonable structure, simple assembly, quick operation, safety & reliability;
2) Easy to carry and operate

3) Wide applications, for both inside and outside construction


Name

Shoring Frame Scaffold/  Ladder Frames  System

Size

As your request 

Main Material

Q345

Surface Treatment

powder coating

Color

blue

Certificate

OSHA

Service

OEM Service available

MOQ

one 20'container

Payment

L/C,T/T

Delivery Time

About 20-30 days after confirmation

Packing

in bulk or steel pallet or as your request





Shoring Frame Scaffold/  Ladder Frames  System

Shoring Frame Scaffold/  Ladder Frames  System

Shoring Frame Scaffold/  Ladder Frames  System


Shoring Frame Scaffold/  Ladder Frames  System



Shoring Frame Scaffold/  Ladder Frames  System

Shoring Frame Scaffold/  Ladder Frames  System

Shoring Frame Scaffold/  Ladder Frames  System

Shoring Frame Scaffold/  Ladder Frames  System

Shoring Frame Scaffold/  Ladder Frames  System




why you  choose  us ?

1)Highest quality -never use any equipment that is damaged or deteriorated in any way

2)Safety -inspect all equipment before using

3)Competitive price - factory suppler direct

4)We have strong engineering team that can give best solution for your project

5)Cutting -Edge product development

 

Consult your scaffolding supplier when in doubt-scaffolding is his business .Never take chances

Our firm belief that our customer's success are the only guarantee of our success .




OEM severice avalible

1)our ability to customized production to meet customer's specifications and requirements

2)our focus on building deep long-lasting relationship with our customers 

3)our commitment to meet customers needs  

Quality comes first ,customers are the highest ,operate with honest





Q: Said chrysanthemum disc scaffolding system, disc scaffolding system, wheel type scaffolding system, buckle scaffold, layher frame
Crossbar HG-30 3001.67HG-60 6002.82HG-90 9003.97HG-120 12005.12HG-150 15006.28
Q: Exterior wall scaffold construction plan?
Vertical pole:Double row scaffolding pole, pole top high eaves 1.5m structure. Single tube base for vertical rod bottom. The vertical rod joint is connected with a butt fastener, and the vertical rod and the large cross bar are connected by a right angle fastener. When the joint is staggered, the two adjacent column joints are avoided to be in the same span, and the distance between them is not less than 50cm; the distance between each joint center and the main node is not greater than 60cm.
Q: Cantilever scaffold technical disclosure
Steel pipe anti rust paint. Vertical rod and bar brush yellow rust proof paint, scissors and handrails with red and white tube brush. The maximum quality of each steel pipe shall not be greater than 25Kg. Steel pipe is strictly prohibited.
Q: If you have two workers say standing on a scaffolding, their are downward forces from the weight of the workers along with the weight of the scaffold, and upward forces from tension suspending the scaffolding in place. The opposite forces add to zero and thus the scaffolding remains at rest.My question has to do with what would occur if more/less workers were on the scaffolding. It appears to me that the scaffolding would always remain at rest. Would there always be a ΣF=0 regardless of the amount of workers? As the decreases in weight from removing a worker would also cause the tension force to be weaker? And vice versa if there were more workers?I
You are correct so long as the scaffolding is not allowed to move. I.e. the cables suspending it are locked and not unwinding from their spools as more workers get on. More weight added would necessarily increase the tension in this type of case. However, if, when another worker got on and the tension could not increase for what ever reason, a downward acceleration would take place that is proportional to the worker's weight. Hope that clears things up.
Q: Fastener type steel pipe scaffold accessories
Foot plateThe foot board can be made of steel, wood, bamboo and other materials, each quality should not be greater than 30kg. Stamping steel foot board is commonly used as a foot board, usually with thick 2mm steel plate pressing, length 2-4m, width 250mm, the surface should be anti slip measures. Wooden feet can be used for the thickness of not less than 50mm of cedar wood or pine production, length 3~4m, width 200-250mm, both ends should be equipped with galvanized steel hoop two, in order to prevent the end of the wooden hand foot damage.
Q: I had my scaffold pierced yesterday and now it is swollen and red. Its throbbing and painful. I have cleaned it and applied ice and antiseptic spray.I don't own any sea salt.HELP ME! I'M SO TEMPTED TO REMOVE IT.
Antiseptics are too harsh for a healing piercing, the pain, swelling and redness is completely normal. Stop using antiseptic and go to the grocery store to get some non-iodized sea salt, its only a few dollars and you can find it in the spice aisle where the regular salt is.
Q: Electric basket accessories are generic
Electric basket among many different parts, such parts have effect to better play its electric basket. Safety rope and the Rieter electric basket frame connection, because the rope with a diameter of not less than 13mm diameter steel wire rope length is arranged. One way is to use the rope around a basket frame bottom and the safety rope prison card (at least 4 buttons) each card once left not greater than 1m lifting weight, basket case from off bearing wire rope or wire rod chain, safety rope hanging basket frame plays the role. This method is very troublesome, each 1m will lift an insurance card rope, and in case of loss Ping An, rope there will be no more than 1m about free falling impact. Therefore newly developed into a safety self-locking device (LSL63 type hanging scaffold with a safety lock, at the same time, set in peace on the wire rope, the normal lift safety lock with electric basket frame along. The risk of wire rope lifting, in case the basket falls off, the safety lock can automatically lock the cradle body on the safe wire rope
Q: I know people have different pain thresholds. But I was wondering if it was more painful than a lobe piercing? It will be done with a needle and are they aloud to freeze it? Or is it not needed?
I got my lobes pierced 5 years before my industrial so I can't compare the pain but everyone says industrial. Idk if they can freeze or not. The pain is completely tolerable.
Q: Specific requirements, the civil code is what ah! Thank you very much, I am lack of this kind of information, I hope you can tell me which of the following
The surface of the steel pipe shall be smooth and free of cracks, scars, delamination, dislocation, hard bending, burrs, indentation and deep scratches.The outer diameter of steel pipe 48mm allowable deviation is 0.5mm; the thickness of the wall 3.5mm allowable deviation of.0.5mm; steel pipe surface cutting oblique deviation 1.7mm;Dressing should be checked once a year. When the examination, should be in serious pipe corrosion in the selected three roots in each part of the serious corrosion of transverse sampling inspection, the outer surface of the steel pipe corrosion depth allowable deviation is less than 0.5mm, more than the provisions shall not be used.All new and old steel pipes must be painted with anti rust paint.
Q: Disc scaffolding and bowl buckle scaffolding which kind of bridge support better?
3 products have a high degree of economic, the use of more convenient and efficient in use, only need to put the plug into the hole of the ends of the cross rod pole corresponding, and then knock tightly, the quality of the demolition ride fast and overlapping is the traditional scaffold cannot do. Its erection speed is 4-8 times more than 2 times that of steel pipe scaffold. Reduce labor time and labor remuneration, reduce shipping costs to reduce the overall. The joint is reasonable in structure, easy in operation, light and handy. Vertical rod weight than the same length of the size of the bowl buckle 6-9%.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords