Black Scaffolding Tube 48.3*2.5 Q235 Steel EN39/BS1139 CNBM
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 50 m.t.
- Supply Capability:
- 30000 m.t./month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details of Black Scaffolding Tube 48.3*2.5 Q235 Steel EN39/BS1139
Material :Q235 (Carbon 235 Steel)
Size : 48.3*2.5
Surface treatment :Black/Painted/Galvanized
Color : black
Standard:EN39/BS1139
Futures of Black Scaffolding Tube 48.3*2.5 Q235 Steel EN39/BS1139
Scaffolding tubes performance various functions in building & construction applications.
Especially recommended for high-floor construction & decoration projects with potential safety hazard, but requiring a convenient & safe decoration & construction operation with safeguard & perimeter safety nets.Low cost & high load bearing capacity
Easy installation & operation& transport
FAQ
1. What is considerations of Scaffolding installation?
There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,
(1) scaffold frontage hurtful to prevent falling objects protection is required.
(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator
2.What are the certifications of your products?
Certified by SGS, BS1139, EN74, Local Test Report.
3. How long is the warranty period for your product?
Our products warranty is 2 years.
- Q: Exterior wall scaffold construction plan?
- Big bar:The large cross bar is arranged above the cross bar, and the inner side of the vertical rod is fastened with a right angle fastener and a vertical rod, and the length of the utility model is not less than 6m of the span of the 3m. The large cross bar is connected with a butt fastener, and the joint is arranged in a staggered way, not in the same time and in the same distance. The horizontal distance of adjacent joints shall not be less than 50cm. The distance from the joint to the riser is not more than 50cm
- Q: How to calculate the fastener type steel pipe scaffold
- 1 "Uniform provisions" on the scaffolding structure design calculation method?1.1 requirements for design methods and design requirements1.1.1 stipulates that the scaffolding structure will be based on the probability theory based on the limit state design method (referred to as the probability limit state design method, that is currently China's engineering structure design method) for design.
- Q: What are the full house scaffolding specification
- Preparation of "full house scaffolding construction plan" according to the specification including but not limited to the following:1 "steel pipe scaffold fastener" (GB15831-2006)2 "technical code for safety of high level construction work" (JGJ80-1991)3 "technical code for safety of scaffold for building construction" (JGJ202-2010)4 "code for safety of steel tubular scaffold with couplers in construction" (JGJ130-2001)
- Q: Specification for construction steel pipe scaffolding and construction safety rules?
- 48mmX3.0mX6m is a national standard, but you can pay attention when you buy the shelf, generally said that they are 3 thick, but the pipe is under the difference, but the number of questions. There are 2.5 under the difference also has a difference of 111 layers of this standard is certainly enough, most of the South with a cover of 20 layers of it, they are basically the same price
- Q: What are the main safety problems when dismantling the scaffold
- 5, all construction materials must be set according to the material classification management requirements must be neatly stacked, "work finished, as material, the site is clean before work".6, on-site construction waste in a timely manner to clean up and deal with the designated place.7, scaffolding workers must be trained and qualified, safety examination, hold certificate to posts jiazigong.
- Q: If I know the length , width and height of the area for the scaffold, how do I calculate the tonnage?
- tonnage is related to the volume of a certain material to be used in a certain project... so as to volume, tonnage is just the volume of the material to be used, given the specifiations in this case, scaffolds. consult your design and count the distribution of the scaffolds to be used.. average ratio of scaffolding tonnage is a ton per 10 square meter... also depends on the quantity of the project.
- Q: Scaffold removal should comply with those requirements......
- Preparation of scaffold safety demolition before demolition1 check the scaffold fastener connection, the wall, the support system is in line with safety requirements.2 according to the inspection results, supplement and improve the design of the demolition process, and after the implementation of the approval.
- Q: I've wanted an industrial/scaffold piercing for ages! My mum is finally looking into letting me have it done. Any advice about it? How can I hide it for school? What's the healing time? :) thank you for any feed back.
- Most piercings need 6 months to fully heal. Industrial will take up to a year to do so. You have to keep the jewelry in and do not take it out ( not even once ) for the whole period of 1 year. This means that you can't hide it for school. You can't put a retainer on also, cause only titanium or stainless steel material are proper for an open wound aka a new piercing. This piercing is not easy to heal and can stay irritated for long. It goes through cartilage and you have to be really careful with the aftercare and the piercer's info if you want to keep the piercing and yourself healthy. You have to be careful and not touch it or play with it and twist it or take it out. You clean this piercing with sea salt soaks or non alcohol antibacterial soap 2-3 times a day. You dry it with paper towels. If you can do the above daily and be extra careful go get it done. Gluck
- Q: What heights do u need a harness for(had to repost as didnt explain correctly in last 1)
- That first answer is correct. When I worked as a construction electrician back in the 1980's the OSHA requirements were not so strict, but now the harnesses and tie-offs are required for any work platform over 6' from the ground.
- Q: What could you do with 100,000 jumbo cotton balls, 50 gallons of honey, and three story scaffolding?
- Take them on the road-trip of course....we'll find some use for them along the way.....
Send your message to us
Black Scaffolding Tube 48.3*2.5 Q235 Steel EN39/BS1139 CNBM
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 50 m.t.
- Supply Capability:
- 30000 m.t./month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords