16 TON FLAT-TOP TOWER CRANE QP7527 TCP7527
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 3 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Feature: Tower Crane
Condition: New
Application: All construction projects
Max. Lifting Load: 16 tons
Max. Lifting Height: 210.7m
Place of Origin: China (Mainland)
Brand Name: CNBM
Model Number: QP7527
Certification: ISO9001, CE Certificate, GOST Certificate
After-sales Service Provided: Engineers available to service machinery overseas
Main Fatures
TC7527 tower crane is a company based GB/T5031-2008 《tower crane》design and manufacture of a construction crane. It can be applied widely in high-rise civilian building, bridge and water-conservancy project, big-span industrial workshop and high-rise building, etc. the tower crane is high level slewing self-erecting tower crane which adopts horizontal jib and trolley-jib. The main features as follows:
Height of the tower crane is confirmed according to height of building, lifting ability of the tower crane is independent of height.
The tower crane with features as high working speed, stead work condition and high efficiency.
Hoisting jib has 75M. This meets project needs more widely.
The eyeshot of cab is well, and the cab is installed independently,which creat preferable working condition for handlers.
Location of the tower crane is reasonable, and the externality of the crane is beautiful.
Lifting jib adopts rigid double tension bars with features as light structure.
the operation is simple and the maintenance is convenient
Specificaction Parameter
Packaging & Shipping
All our packing ways are standard packing. In wood case or carton, as you like. After the production, we will do our best to do the shipping as soon as possible. Best Service is our sart of business.
Our Services
1.We can make special sample according to the customer’s requirement.
2. We have more than 60 professional technical team, provide best after-sales service
3. Fast delivery time
4. We have CE, ISO9001 and GS certification.
Please note that we can supply both standard mechanism and frequency mechanism, and the rope capacity can be adjusted as per clients' specific requirements.
- Q: If a friend folded a thousand paper cranes for you what would you think?
- that they must have a lot of time:)god bless
- Q: i am having trouble finding out 2 points that Stephen Crane makes about courage in this story. can anyone please help me? =(
- Please see the website below for much more information. There are many good notes about the book, The Red Badge of Courage. Chapter 11 Fear of Battle 7: The burst of courage that Henry feels is purely produced by the actions of those around him; he feels compelled to be like the idealized warriors he perceives the men in front of him to be. Yet, his internal doubt of being able to fulfill the social expectations that he feels ultimately holds him back from acting on this burst of courage. Chapter 12 Fear of Battle 8: With Wilson's newfound maturity comes an acceptance of battle, which is neither the quaking fear of the new regiment or the biting sarcasm of the veteran soldiers. This is the first glimpse of the true internal strength that Henry searches for within himself. It is a glimpse of something that does not surface often among the soldiers who have found it, for Henry sees that the veterans often cover up this internal strength with a cocky sarcasm that is both imposing and difficult to see through. Chapter 17 Fear of Battle 9: Fear of battle has perhaps given way to something more subtle; with Henry's acceptance of battlefield reality comes a more pervasive feeling of injustice that Henry felt on the previous day when he felt pushed along by his regiment. This feeling is one of a desperate helplessness, breeding an all-encompassing hatred. This sense of hate, ironically, helps Henry to achieve the storybook ideal of the warrior, and find inner peace.
- Q: analysis of jib crane?
- I would suggest that you delete this question and submit a new question with enough details for someone to give you an answer. This is not a question I can give you much help on
- Q: I caught this crane fly in my garage but is almost the size of a dragonfly. It has a 3 inch wingspan. I saved it in a jar because I though no one would believe me. so do they really get this big or is this thing a freak?
- Giant okorder /
- Q: I need to draw an injured crane (the bird) with an arrow in its wing, lying on the ground...preferably with a splayed wing.How do I draw this? Sketches would help.Thanks.
- Shoot a crane with an arrow and take a picture. Life drawing and technology mesh well.
- Q: What are the lifting moment requirements for tower cranes?
- 3, tower crane, such as lifting weight limiter, amplitude limiter, height limiter and load torque limiter limiting device, and travel limit switchestower lights wind instrument, wind clip rail device ladders athletic supporter circlewalkways and railings. The driver's cab is comfortable, easy to operate, with good vision and perfect communication facilities.
- Q: What is the difference between a tower crane QTZ31.5 and a QTZ40?
- Lifting moment, arm length, elevation is not the same ah! Specifically, the maximum lifting weight of QTZ315 is 3 tons, the length of the arm is from 38-42 meters, the elevation is 27-28 meters; the maximum QTZ40 is 4 tons;
- Q: Before the Advent of the Railroad Steam Recovery Crane Car (pictures below), how were Locomotive Steam Engines recovered after a derailment from the 1830's to the 1890's?
- Its been carried out till now, many early vehicles have been steam powered. genuine it may burn renewable fuels alongside with trees, inspite of the undeniable fact that it has to hold those fuels with them (check out a steam loco - extensive soft or coal that's extra compact capability than trees) draw back may be the load of the part of get the overall performance needed, the smoke (and then smog), and the capability needed totransport the boiler, water tank and gasoline till now you even thinkabout the burden it is going to hold. extra suitable for busses could be to pehaps generate electrical energy and grant that to the bus - and thats been invented too -a tram! reward are that the gasoline doesnt could desire to be carried with the vehicle (extra useful - lighter), brakes canbe used to generate electrical energy, cleanser inthe cities, and the turbines could have scrubbers on the chimneys to take out the harmfull gasses
- Q: A site would be nice...
- For themes, I wrote Fast Rode the Knight, written by Stephen Crane, is a short poem about a knight going into battle, and his forgotten horse. Some themes in this poem are love and devotion, battles in war, the passion that drives the soldiers, or knights, into it, the forgotten aftermath of the battles, and what has to be left behind for such a battle to be fought. The passion of the knight can be found in the lines Ever waving an eager sword/’To save my lady!’. The knight rides at a furious pace, driven by love and a blinding devotion to his love, or perhaps his Ruling Lady. thats just like the beginning, hope it can help you :D It's not nearly finished, but hope it is okay all the same :)
- Q: I have preliminary data: up to 2 tons of weight; work range of 40 meters; lifting torque 800KNm; lifting height 45m.. I encountered problems in the design, and some of its specific reference, I would like to ask here, for example, how much is the weight of its whole machine, how much is the balance weight, the balance of the radius of gyration? Super boom weight? (it's better to have the approximate weight of each component). And when I design this tower crane, is it necessary to use planetary gear for the gear reducer?Thanks to your advice, Liu is here to thank you
- The weight of the whole machine is 36.1 tons (independent height). Its balance weight is 15 tons, and the balance weight is 11.82 meters. The boom weight is 5.72 tons. It is necessary to use planetary gear.Usually use two rotary speed reducer of 8000 nm.
Send your message to us
16 TON FLAT-TOP TOWER CRANE QP7527 TCP7527
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 3 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords