TOWER CRANE H7030B TC7030 HIGH QUALITY 16Ton
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 1 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Brief Description
Feature: Tower Crane
Condition: New
Application: tower crane
Rated Loading Capacity: 16T
Rated Lifting Moment: 250MT
Max. Lifting Load: 16T
Max. Lifting Height: 183.7M
Span: 70M
Place of Origin: China (Mainland)
Brand Name: CNBM
Model Number: H7030B
Colour: Orange/ Yellow
Certification: ISO9001:2000; CE ;Ukraine & Belarus Certificate
Capacity: 16tons
Main Fatures
TC7030 tower crane is a company based GB/T5031-2008 《tower crane》design and manufacture of a construction crane. It can be applied widely in high-rise civilian building, bridge and water-conservancy project, big-span industrial workshop and high-rise building, etc. the tower crane is high level slewing self-erecting tower crane which adopts horizontal jib and trolley-jib. The main features as follows:
Height of the tower crane is confirmed according to height of building, lifting ability of the tower crane is independent of height.
The tower crane with features as high working speed, stead work condition and high efficiency.
Hoisting jib has 55m or 60m and 65m three ranges. This meets project needs more widely.
The eyeshot of cab is well, and the cab is installed independently,which creat preferable working condition for handlers.
Location of the tower crane is reasonable, and the externality of the crane is beautiful.
Lifting jib adopts rigid double tension bars with features as light structure.
the operation is simple and the maintenance is convenient
Packaging & Delivery
Packaging Details: | In Nude/40'HQ/ Wooden case |
---|
Model | Tower Crane H7030B |
Packaging & Shipping
All our packing ways are standard packing. In wood case or carton, as you like. After the production, we will do our best to do the shipping as soon as possible. Best Service is our sart of business.
Our Services
1.We can make special sample according to the customer’s requirement.
2. We have more than 60 professional technical team, provide best after-sales service
3. Fast delivery time
4. We have CE, ISO9001 and GS certification.
- Q:I know that you have to unfold the origami paper crane, but how do you find the surface area of it???????????????????????????/ please help...........
- Do you remember the formula for determining area? For a flat object (like your paper) the formula is Length X Width = Area. or LW=A So unfold your paper, and measure the length and the width, and simply multiply the two numbers. The resulting number will be your area. Of course, that is the area of the unfolded paper. Your crane in it's folded form will have a much different, and harder to find, surface area value.
- Q:Tower crane (tower crane)
- Fixed tower crane, mobile tower crane, flat tower crane, movable arm tower crane
- Q:I'm researchign for this demonstration speech on origami and uncovered a legen that says in the Japenese custom if you fold 1000paper cranes you are granted a wish. Just wondering, has anyoen ever tried this? and the outcome?I'm goign to do it this weekend!
- There are many stories of this, who is to say if they are true or not. A young girl dying of cancer folded 1000 paper cranes and she miraculously recovered. I don't think it is like a I really hope Jimmy takes me to the prom!! type wishing though. It is a nice thought nonetheless. . . .
- Q:What are the safety devices in a tower crane?
- 1 torque limiter. There are two kinds of mechanical electronic.2 weight limiter. There are two kinds of mechanical and electronic.3, lifting limit device.4, slewing limit device.5, amplitude limiter.6, car anti break shaft device.7, the car anti broken rope device.8, jacking up anti stripping device.9, the collision lights.10, luffing tower crane luffing speed protection.11, walking crane limit limiter.12, all kinds of warning signs.
- Q:my friend is in the hospital with really bad burns
- A really long string. Or have I misunderstood the question?
- Q:What was the mekhane (crane) used for in Greek plays?To remove scenery between actsTo lift the king and his court to their viewing boxFor actors playing the godsIt was only used in building and tearing down the set
- for actors playing gods. that's where the phrase deus ex machina comes from -- god in a machine.
- Q:As a building gets taller, the crane is raised. How is this done? And when the building is done, how do they get the crane back down?
- they use a process called jumping. iron workers use a special fixture to unbolt the tower and lift the crane up high enough to slide in another section and bolt it down. breaking down of the crane goes in reverse order.
- Q:Is there a certain direction and reason a construction worker will leave a crane facing a certain direction.
- I don't think there is a particular direction unless prevailing winds are a factor. Here in Las Vegas, cranes, when idle don't seem to have a pattern. At least from what I have seen.
- Q:i need help with my essay,Question: Analyze the poem om terms of its structure, its themes, and its imagery. If youre stuck on themes consider God's absence indifference of nature, or the inronies of war. What is ironic about the poem? How does Crane criticize the romantic hero?
- War Is Kind Analysis
- Q:Our company is responsible for the general contracting construction project foundation pile by Party A but other subcontractor for the construction of pile foundation of a pile foundation the company has quickly completed the construction scheme of the party and the supervision of tower crane foundation now has been reported by the audit Party B must contact us pile pile. We believe that Party A shall bear it at one time. Ask the net friend is this so?
- 1, the pile foundation of the pile and tower crane foundation pile is not the same item, cannot pile foundation pile and tower crane foundation pile together to talk about.2, you did not say who is tower crane?. Who is responsible for the tower crane installation, including tower crane foundation construction.3, but, in fact, in most cases, the mechanical leasing company only provides technical requirements, providing tower crane foundation section. Piling and foundation concrete are the responsibility of the contractor.4, if the contract does not have a definite agreement on the construction of the tower crane foundation, the general contractor shall be responsible for the cost of piling the tower crane foundation. The piling Team can be the construction unit of the pile foundation, and also can be found by the general contractor.5, in the future tower crane foundation construction program should be clear about this matter, avoid controversy.These are only personal opinions.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
TOWER CRANE H7030B TC7030 HIGH QUALITY 16Ton
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 1 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords