• Yufei Rail Mounted Container Gantry Crane System 1
Yufei Rail Mounted Container Gantry Crane

Yufei Rail Mounted Container Gantry Crane

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Rail Mounted Gantry Crane



Quick details



Feature: Gantry Crane


Rated Loading Capacity: 10-100T


Max. Lifting Height:No limited


Brand Name: KUANGYUAN


Warranty: One year


GB/T 19001-2000 idt ISO 9001:2000:Passed


Weight overload protection function:Included


Buffer:Polyurethane materials


______________________________________________

Condition:New


Rated Lifting Moment:Different


Span:    
18~35m (it can de redesigned) as client's requirements)


Model Number:U Model


After-sales Service Provided:

   
Engineers available to service machinery overseas


GB/T 28001-2001,OHSAS18001:1999:Passed


Crane traveling limited switch:Included


Motor:High quality,famous brand


__________________________________________________

Application:Widely


Max. Lifting Load:100T


Place of Origin: Henan China (Mainland)


Certification: CE/SGS/GOST/ISO


GB/T 24001-2004 idt ISO14001:2004:Passed


Current overload protection system:Included


Emergency stop system:Included


Electric main parts:Siemens brand



__________________________________________________

Packaging & Delivery


Packaging Detail:Electricals and other parts are packed by high quality

plywood crates. Main beam packaged by plastic film and woven plastic cloth.


Delivery Detail: Within 45days after receiving your deposit



__________________________________________________

Specifications

Container Gantry Crane Loading/unloading containers with high efficiency, CE/ISO/SGS Certificate Loading capacity:10~100t

Rail Mounted Container Crane - (RMG) Gantry Cranes

Capacity: 20t/10t ,32t/10t ,36t/16t, 40t,50t,65t,
Usage: container terminals, open storage yards and along the railway lines to load or unload container






Technical Introduction:

 

The electrical equipment is accommodated in robust steel plate control cubicles.


All movement can be switched off by actuating the emergency-off switch at the control station via a main contactor.


The entire equipment is easy to install and dismantle due to the use of threaded bolts and top-hat rails. Cable inlet from the cable gland.


Power supply cable and control cable along the girder

A protective earth conductor is fitted as standard, a crane switch is provided.

Travel end switches, long and cross travel limited y means of preliminary and final limited switches and overload protection:



Design Structure


it runs on a runway at the floor level. The bridge is supported by a pair of rigid steel legs which are carried by a pair of end trucks along

the floor level runway.



Design Structure


it runs on a runway at the floor level. The bridge is supported by a pair of rigid steel legs which are carried by a pair of end trucks along the floor

level runway.



Mechanical feature



Double welding box girder, DIN/FEM standard deflection



Steel tube legs



Material Fe37 or Fe52



Whole length CNC cutting for complete web plate, high deflection accuracy



High quality autometic welding and NDT inspection



Shot-blasting Sa2.5 for complete girder after welding, stress release



Epoxy zinc rich high quality paiting, 2x2 with 140um



10.9 class High tension bolts mouting between girder and legs, life time safety connection

Vertical gear motor driving,more safety and smaller space




Q: Does anyone have a time machine that I could useI'm seriousIs there any way that I could just go back to this morning and change something? Any way possible at alllPlease I will pay anything
Paula is trying to cheat youMy time machine is MUCH less expensive ($4,800), and I'll gladly ship it to you free of charge upon receipt of paymentPayment must be made to a post office box, and in the form of a postal money orderIf you also want the Brooklyn Bridge, I'll give you a discounted price.
Q: Hi, I need to find a way to test a crane lifting performance to its limits (around 100 metric tons)One idea is to dig a big hole and fill it with concrete and then try to pull it out of the groundTo propery size a the hole or column I need to find out what is the force of friction acting on the columnThese would help save some money on concreteI welcome any help on finding the answer to this question as well as alternate ideas on how test the crane
i didn't hear of pulling out a column , the friction can't be neglected according to my POV , but u can carry steel instead u'll even less volume well ,, that gauges idea is very nice , i liked it , u are a real innovative person , now i beleived u are an eng.
Q: what would be a good all around cam for a chevy 350 bored .030 overI'm not really that worried about gas mileageIt already has a 276 Hydrolic Comp cam but i dont know if its a low end tourqe or high end tourqe cam and i'm not sure if i should re use it when i rebuild the engineBut all i know It has really big lopes and i like the hear of it haSo if anyone knows of a hard hitting cam that will give some all around hp let me knowOh and this motor is in an 1982 Chevy 2wd c10 with a turbo 350.
Without knowing what else has been done to your 350, your best bet would be to go to the web site of a good parts house like Summit racing or a cam company like Comp or Crane and talk to a tech repThe important thing to remember is that the bigger the cam is, the more mods you need to make to the rest of the engine, trans,and to the vehicle itselfA 276 degree cam is really fairly big for a street engine and a 292 would most likely be too much for a full size truck that sees any real time on the roadAlso, you want to stick with a hydraulic cam unless you really enjoy pulling the valve covers every week or two so that you can reset your valve lashIt's like they say How fast do ya wanna go and how much do ya wanna spend? Anything can be made to work, but, it can get expensive REAL fast! I'm building a 383 Chevy that will be going into an '85 GMC 3/4 ton 4x4 for my daughter right now, and I've got over $3500 in it already just in parts, and, I'm still not done with it.
Q: Or a guySo i live in a apartment, and the only times i wear pajamas in public are when i have to wake up to move my car in the mornings to avoid a ticket, go downstairs to the basement to do laundry, and only once went out to the local grocery store which is 1 block awayI started noticing that when i see someone in the elevator (coming back from laundryOr moving my car), my neighbors look at my pajamasI mean they dont seem to give me a dirty look about, but it seems annoying when they look at itMy pajamas are a bit big/baggy and plaid pajamas and my t-shirt are a bit big(im a medium but my pajama shirt is a large )
Are you joking to expect an aluminum plate can produce enough current to let a current meter to readYou should try it with selenium plate that could produce a few uA , and that has been proved over 60 years agoOr you should let the plate input to a at least 100,000 times dc current amplifier ( multi stage low noise Op-amp) to enlarge it before the DC current meter might give an indication.
Q: the different between a mobil home a double and a margerler home?
Lots and lots of peaches and orangesyour digestive track needs all the help it can getso eat your fruits and veggiesmy dad bought me a whole box of peaches and pulled me around the ward in a wagon till I ate every single oneAnyone who has been on chemo will know why datesyou can buy them in blocks and they're full of iron and fibredon't forget Fig newtonsYop yogurt drinks do they still make those? I lived off them when i was on chemo Macdonalds Pizza which unfortunatly isn't made in most placesI think it may be the cure to cancer because I ate so much of it when I was in hospitalonce you find a food you can stomach eat as much of it as you wanttry to get some fruits and veggies in there but when it boils down to it you need to eat something.
Q: k the first person say 1 then the second is 2 the third is 3 and so on to c how many we can get :-)
take a bowl and line it with tin foilthen add dish washer detergent and water and scrub it.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords