Ship Builing Gantry Crane with Double Trolley
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 2000 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Ship Builing Gantry Crane with Double Trolley
Product Details
Basic Info.
Model NO.:MH
Type:Gantry Crane
Application:Construction Usage, Workshop Usage, Container Usage, Mineral Area Usage
Sling Type:Wire Rope
Power Source:Electric
Certification:ISO9001: 2000, CE, GOST
Condition:New
Double Trolley:Could Lift and Rotate The Goods Together
Export Markets:Global
Additional Info.
Trademark:WEIHUA
Packing:Wooden Case, Nude
Standard:CE, ISO
Origin:China Henan
HS Code:84261930
Production Capacity:200000set/Year
Product Description
Manufacture Equipment
Product Description
Applied Situation:
Double girder gantry cranes with hook are available for general service, such as loading, unloading, lifting and transferring work in out door storage or on railways.
Product description:
It consists of four main parts, namely, the bridge structure, the travelling mechanism, the trolley and the elcetric equipment. The bridge is welded structure of box-type; Individual drives are adopted for travelling mechanism on each end of the crane. All movements of the crane are controlled from the cabin. Either rigid shapes of steel(angles and tees) or flexible insulated cable shall be selected to be utilized as runway conductors and proposed in the order by the purchaser.
Ordering notice:
Please kindly tell us your detailed requirement and the working conditions, we can help you to choose the suitable model as your requirement.
1. Lifting capacity
2. Lifting height
3. Span
4. Work duty
5. Power supply
6. Application environment
7, Other requirements.
Welcome your enquire for details!
Company | Export Project list | Specification | Unit |
England Sheffield forging masters | UK | QD250/15t | 2 |
Alstom Power Service Ltd | Ash grab replacment | MZ10t-14.5m A7 | 1 |
Aker Solutions, US | Toromocho, Peru | QD50/10t-50m A5 QD10t-11m A5 QD35/5t-20m A5 BMG35/10-13m A5 LD10t-17m A5 LD3t-15m A5 | 8 |
China National Machinery and Equipment Import and Export Corporation | Indian Jurala hydropower station project | QD160/50t-19m QD 50/10t19m A4 | 2 |
China National Machinery and Equipment Import and Export Corporation | Burmese KABAUNG hydropower station project | QD80/20t30m A3 QD 80/20t28.5m A4 | 2 |
China National Machinery and Equipment Import and Export Corporation | Indonesian North Sumatra Labuhan Angin | BMH 20t13m A3 QD 80/20t28.5m A3 | 2 |
China National Machinery and Equipment Import and Export Corporation | Turkey SILOP power plant project | QD 80/20t31.1m A3 LH 16/5t16.5m A5 | 2 |
Harbin power engineering Co., Ltd | Vietnam CaoNgan Coal-fired Power Plant | QD75/20t-28.5m A3 QD16/3.2t-10.5m A3 QZ5t-19.5m A6 QZ5t-31.5m A6 | 5 |
Sinohydro Corporation | Sudan Merowe Dam Project | MDG30/10t-20m MDG20/5t-30m | 2 |
China Wanbao Engineering Corporation Jinchuan Group construction company | Congo (DRC) cobalt copper smelter project | QZ5t-10.5m QZ5t-22.5m | 4 |
Sinohydro Corporation | Malaysia Bakun power station | MG25/5t-22m MH10t-18m MH10t-22m | 3 |
Sinohydro Corporation | Algeria Mina irrigation expansion project | MH12t-16m MH10t-16m MH5t-16m | 4 |
China National Electric Equipment Corporation | Thailand Thaisaree6M Rice husk power plant | LH16/3.2t-13.5m | 1 |
China National Machinery and Equipment Import and Export Corporation | Hindi Sadat power plant | QD40/10-19.5m | 1 |
CITIC International Cooperation Company | Iran Zaland project | SDXQ-3t-8m SDXQ-3t-9m SDQ10t-10.5m LX5t-4.6m LDA3t-10.5m | 18 |
China Triumph International Engineering Co., Ltd. | Bangladesh NGIL float glass production line | LDA5t-22.5m LDA5t-16.5m | 3 |
China Metallurgical Construction Group, Baotou Iron and Steel Design Research Institute | MUGHAL Pakistan 6MVA submerged arc furnace steel plant project | QD16/3.2t-13.5m LDA2t-13.5m LX2t-6m | 5 |
Handan China Metallurgical Construction Co., Ltd. | Brazil COSIPAR project | LDA10t-7.5m LX5t-3.5m CD10t-12m | 18 |
East West Marketing Pty Ltd. | Australia | LH16t-16.834m HD10t-16.834m | 2 |
Sergyman mining equipment (Langfang) Co., Ltd. | Russian project | LH20t-23.5m-24m CD3t-18m | 1 |
China National Heavy Machinery Corporation | Myanmar | QD50/10t-14m | 1 |
Chinese People' s Liberation Army 6409 Plant | Vietnam | QD32/5-16/3.2-16/3.2 | 3 |
Sinosteel Equipment & Engineering Co., Ltd | Turkey | QD50/10t-20/5t-32/5t | 11 |
Shenzhen Shandong Nuclearpower Engineering Co., Ltd | India | QD50/10t | 2 |
Harbin power engineering Co., Ltd | Indonesia | QD55t-32t | 2 |
China Construction Material Group Co., Ltd | The United Arab Emirates | QD62/10t-20/5t | 2 |
Source china | Kenya | LD3t | 1 |
China Tianchen Engineering Corporation | Pakistan | 50/20t-75/20t | 2 |
- Q: Hi, i have 2 months old siberian husky and im worried about his peeing and pooping all over the houseBecause we live in hot climate he drinks a lot of water every day so he sometimes pees every 40 minutesHe was peeing on pee pads but now he started peeing and pooping on our carpetsI take him out often but most of the time he doesnt go out and then goes out inside when i take him back I know that larger huskies ( about 6 ) months already stop peeing like that and pee 2-3 times a day so i was wondering if i can teach him to use pee pads now and when he grows up a little bit or when winter comes to teach him fully to go outside because i cant take him out every 30 minutes and i am very exhausted becouse all i do every day is to watch him not to poop on carpets
- You don't say where you are, but there are small, independent mills all around the countrySome will do small batches, some need a minimum to operate their machineryIt's all the set-up and clean-up that really costs, so the more you do, the betterYou can also find many spinners that will do the work for you, but you are going to have to pay a higher priceHowever, the yarn is usually of a nicer quality when hand spunGet a sample of each and then you can decide which you like bestAnd of course, you might also find some off-shore mills that will do the work for you at a lower cost than you can get done in your own country.
- Q: How ignorant could a person be to believe we came from nothing and nothing formed usEvolution is true, but to say that no life form created human life is under my headIts like santa clausThis is only if you know the complexities of the human body and the creation processes of creating a human life formHuman DNA and RNA working together is way to complex to be an accident let alone to not be invented by an extremely smart minded life formI could input more stimulating theories of purposeful theories to initiate the microscopic neurons in your varied minded powers of individual compromise strenth, but you just need to think for yourselves with our new technologys at hand which darwin didn't possess at his timely theory of evolutionHe was unsmart.
- If I understand correctly, some recyclables are recycled back into the same exact thing and some are notThis is true for metals like aluminum and steel, and also for glass, because they're just melted downPlastics, on the other hand, have to be down-cycled into another type of plastic that is slightly harder to recycle So the cycle of a 1 plastic may be something like 1 - 3 - 7- dump whereas with an aluminum can you can go aluminum can - aluminum can - aluminum can - aluminum can - aluminum can - aluminum can - aluminum can - aluminum can - aluminum can - aluminum can - aluminum can - aluminum can - and so onForever and ever.
- Q: and can you please support your reasons?(im doing research)
- Gallbladder Removal And Colon Cancer
- Q: What is the meaning of the girder of the gantry and the right girder?
- N ④ When the bridge is assembled in the field, the diagonal should be checked to be relatively poor; r n⑤ The girders should be bent to the outside and should be measured at the web of 100mm from the upper flange.
- Q: i saw a semi rig make a close turn almost hitting a traffic lightthen had to back up a little was without hitting the traffic light that was behind himthen pulled up ever so slowly going forword trying to not hit a few street signs, and a construction signthe trucker managed to get through that turn, but had a bigger obstacle as the intersection ahead was halfway closed off because of constructioni was walking home the other direction, so i didn't get the chance to see if the trucker made it through that spoti did see him trying to make the other tight turn, but unknown if he got through.truckers i'm sure you've all had such big dangerous and difficult turns, how did you all manage to get throughmy hats off to you all how have to driver though such dangerous trips.
- I drove for Yellow Freight(YRC now) before I became disabled and the most dangerous turns were always at the BNSF rail yard in FTWorth TexasMaking any turn there is bad because there are so many other drivers running up and down the tracks looking for their trailer and not paying attention to their surroundings(Trains, other trucks, hosteling buggies and not to mention the crane picking up the trailers or containers off the trainIt was even worse at night.
- Q: Also what does grip and second grip do?I allways seen this in credits and never knew what it ment.
- YeahHis answer covers the definitive termBasically a Grip is a set of handsThat is why they are gripsThey move things and serve as hands for the productionIt can be a fun position to work although it can be physically laboring at times.
- Q: Ok i am getting tired of my elevator keep breaking down every 3 days and when people get stuck i am the only one who have to call 911 for help even though i live in a 20 story high building.However my family are all asthmatics and we live on the13 floor complaining about the elevator every week the land lord takes a week to fix it every time it breaks down.My whole entire family was hospitalized after they were forced to climb 13 flights of stairs to get to their homes however my family is unqualified for insurance for unknown reason no matter how much they try to get insurance they dont get paid much when they work.Our medical bills put together was 2 million dollars because each of us had to stayed in the hospital for a month because or our asthma was severe.We talked about not paying rent since every 3 days the elevator keep breaking down and it takes a week to fix it.there 7 of us in the family who whose asthmatic do i have a case?
- Don't blanketI live much farther north than you and I have never blanketed my thoroughbredWhen the weather's bad she just comes into her stall and she's inside overnight tooUnless you are clipping them, horses do fine in the coldThey grow a great thick winter coat which is perfect for keeping them warm! Unless it's wet or windy, they can go down to around 20-30 degrees with no blanketJust put a waterproof rainsheet on them when it's wet/windy and you'll be all setThe big problem I have with blankets is that they make horses who aren't clipped way too hotHorses already have the natural insulation of a thick winter coat, and adding a blanket on top of that often causes them to overheatWhen they overheat, they sweat, and the sweating causes them to get very coldso they go from very hot to very cold with a blanket onMuch better to just leave it off and let them regulate themselvesIf they are outside 24/7, then just put a waterproof sheet on when it's very windy or rainingOtherwise just bring them inside when it's raining and you don't need to put anything on them.
Send your message to us
Ship Builing Gantry Crane with Double Trolley
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 2000 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords