• Ship Builing Gantry Crane with Double Trolley System 1
  • Ship Builing Gantry Crane with Double Trolley System 2
Ship Builing Gantry Crane with Double Trolley

Ship Builing Gantry Crane with Double Trolley

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
2000 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Ship Builing Gantry Crane with Double Trolley


Product Details

Basic Info.

Model NO.:MH

 

Type:Gantry Crane

Application:Construction Usage, Workshop Usage, Container Usage, Mineral Area Usage

 

Sling Type:Wire Rope

Power Source:Electric

 

Certification:ISO9001: 2000, CE, GOST

Condition:New

 

Double Trolley:Could Lift and Rotate The Goods Together

Export Markets:Global

Additional Info.

Trademark:WEIHUA

 

Packing:Wooden Case, Nude

Standard:CE, ISO

 

Origin:China Henan

HS Code:84261930

 

Production Capacity:200000set/Year

Product Description

Manufacture Equipment

Ship Builing Gantry Crane with Double Trolley






Product Description

Applied Situation:
Double girder gantry cranes with hook are available for general service, such as loading, unloading, lifting and transferring work in out door storage or on railways.

Product description:
It consists of four main parts, namely, the bridge structure, the travelling mechanism, the trolley and the elcetric equipment. The bridge is welded structure of box-type; Individual drives are adopted for travelling mechanism on each end of the crane. All movements of the crane are controlled from the cabin. Either rigid shapes of steel(angles and tees) or flexible insulated cable shall be selected to be utilized as runway conductors and proposed in the order by the purchaser.
Ordering notice:
Please kindly tell us your detailed requirement and the working conditions, we can help you to choose the suitable model as your requirement.

1. Lifting capacity
2. Lifting height
3. Span
4. Work duty
5. Power supply
6. Application environment
7, Other requirements.



Welcome your enquire for details!


  Company 

Export Project  list

Specification 

Unit 
England Sheffield forging mastersUKQD250/15t2
Alstom Power Service LtdAsh grab replacmentMZ10t-14.5m A71
Aker Solutions, USToromocho, PeruQD50/10t-50m A5    QD10t-11m A5    QD35/5t-20m A5        BMG35/10-13m A5      LD10t-17m A5      LD3t-15m A58
China National Machinery and
Equipment Import and Export Corporation
Indian Jurala hydropower station project QD160/50t-19m    QD 50/10t19m A42
China National Machinery and
Equipment Import and Export Corporation
Burmese KABAUNG hydropower station projectQD80/20t30m A3            QD 80/20t28.5m A42
China National Machinery and
Equipment Import and Export Corporation
Indonesian North Sumatra Labuhan AnginBMH 20t13m A3    QD 80/20t28.5m A32
China National Machinery and
Equipment Import and Export Corporation
Turkey SILOP power plant projectQD 80/20t31.1m A3    LH 16/5t16.5m A52
Harbin power engineering Co., LtdVietnam CaoNgan Coal-fired Power PlantQD75/20t-28.5m A3        QD16/3.2t-10.5m A3              QZ5t-19.5m A6              QZ5t-31.5m A65
Sinohydro Corporation Sudan Merowe Dam Project MDG30/10t-20m        MDG20/5t-30m2
China Wanbao Engineering Corporation Jinchuan Group construction companyCongo (DRC) cobalt copper smelter projectQZ5t-10.5m              QZ5t-22.5m4
Sinohydro Corporation Malaysia Bakun power stationMG25/5t-22m  MH10t-18m    MH10t-22m3
Sinohydro CorporationAlgeria Mina irrigation expansion projectMH12t-16m  MH10t-16m    MH5t-16m4
China National Electric Equipment CorporationThailand Thaisaree6M Rice husk power plantLH16/3.2t-13.5m1
China National Machinery and
Equipment Import and Export Corporation
Hindi Sadat power plantQD40/10-19.5m1
CITIC International Cooperation CompanyIran Zaland project SDXQ-3t-8m  SDXQ-3t-9m  SDQ10t-10.5m        LX5t-4.6m      LDA3t-10.5m18
China Triumph International Engineering Co., Ltd.  Bangladesh NGIL float glass production lineLDA5t-22.5m  LDA5t-16.5m3
China Metallurgical Construction Group, Baotou Iron and Steel Design Research InstituteMUGHAL Pakistan 6MVA submerged arc furnace steel plant projectQD16/3.2t-13.5m    LDA2t-13.5m    LX2t-6m5
Handan China Metallurgical Construction Co., Ltd.Brazil COSIPAR projectLDA10t-7.5m    LX5t-3.5m  CD10t-12m 18
East West Marketing Pty Ltd.Australia LH16t-16.834m  HD10t-16.834m2
Sergyman  mining equipment (Langfang) Co., Ltd.Russian project LH20t-23.5m-24m    CD3t-18m1
China National Heavy Machinery CorporationMyanmarQD50/10t-14m1
Chinese People' s Liberation Army 6409 PlantVietnamQD32/5-16/3.2-16/3.23
Sinosteel Equipment & Engineering Co., LtdTurkeyQD50/10t-20/5t-32/5t11
Shenzhen Shandong Nuclearpower Engineering Co., LtdIndia  QD50/10t2
Harbin power engineering Co., LtdIndonesia QD55t-32t2
China Construction Material Group Co., Ltd The United Arab EmiratesQD62/10t-20/5t2
Source chinaKenya   LD3t 1
China Tianchen Engineering CorporationPakistan50/20t-75/20t2


Q: Hi, i have 2 months old siberian husky and im worried about his peeing and pooping all over the houseBecause we live in hot climate he drinks a lot of water every day so he sometimes pees every 40 minutesHe was peeing on pee pads but now he started peeing and pooping on our carpetsI take him out often but most of the time he doesnt go out and then goes out inside when i take him back I know that larger huskies ( about 6 ) months already stop peeing like that and pee 2-3 times a day so i was wondering if i can teach him to use pee pads now and when he grows up a little bit or when winter comes to teach him fully to go outside because i cant take him out every 30 minutes and i am very exhausted becouse all i do every day is to watch him not to poop on carpets
You don't say where you are, but there are small, independent mills all around the countrySome will do small batches, some need a minimum to operate their machineryIt's all the set-up and clean-up that really costs, so the more you do, the betterYou can also find many spinners that will do the work for you, but you are going to have to pay a higher priceHowever, the yarn is usually of a nicer quality when hand spunGet a sample of each and then you can decide which you like bestAnd of course, you might also find some off-shore mills that will do the work for you at a lower cost than you can get done in your own country.
Q: How ignorant could a person be to believe we came from nothing and nothing formed usEvolution is true, but to say that no life form created human life is under my headIts like santa clausThis is only if you know the complexities of the human body and the creation processes of creating a human life formHuman DNA and RNA working together is way to complex to be an accident let alone to not be invented by an extremely smart minded life formI could input more stimulating theories of purposeful theories to initiate the microscopic neurons in your varied minded powers of individual compromise strenth, but you just need to think for yourselves with our new technologys at hand which darwin didn't possess at his timely theory of evolutionHe was unsmart.
If I understand correctly, some recyclables are recycled back into the same exact thing and some are notThis is true for metals like aluminum and steel, and also for glass, because they're just melted downPlastics, on the other hand, have to be down-cycled into another type of plastic that is slightly harder to recycle So the cycle of a 1 plastic may be something like 1 - 3 - 7- dump whereas with an aluminum can you can go aluminum can - aluminum can - aluminum can - aluminum can - aluminum can - aluminum can - aluminum can - aluminum can - aluminum can - aluminum can - aluminum can - aluminum can - and so onForever and ever.
Q: and can you please support your reasons?(im doing research)
Gallbladder Removal And Colon Cancer
Q: What is the meaning of the girder of the gantry and the right girder?
N ④ When the bridge is assembled in the field, the diagonal should be checked to be relatively poor; r n⑤ The girders should be bent to the outside and should be measured at the web of 100mm from the upper flange.
Q: i saw a semi rig make a close turn almost hitting a traffic lightthen had to back up a little was without hitting the traffic light that was behind himthen pulled up ever so slowly going forword trying to not hit a few street signs, and a construction signthe trucker managed to get through that turn, but had a bigger obstacle as the intersection ahead was halfway closed off because of constructioni was walking home the other direction, so i didn't get the chance to see if the trucker made it through that spoti did see him trying to make the other tight turn, but unknown if he got through.truckers i'm sure you've all had such big dangerous and difficult turns, how did you all manage to get throughmy hats off to you all how have to driver though such dangerous trips.
I drove for Yellow Freight(YRC now) before I became disabled and the most dangerous turns were always at the BNSF rail yard in FTWorth TexasMaking any turn there is bad because there are so many other drivers running up and down the tracks looking for their trailer and not paying attention to their surroundings(Trains, other trucks, hosteling buggies and not to mention the crane picking up the trailers or containers off the trainIt was even worse at night.
Q: Also what does grip and second grip do?I allways seen this in credits and never knew what it ment.
YeahHis answer covers the definitive termBasically a Grip is a set of handsThat is why they are gripsThey move things and serve as hands for the productionIt can be a fun position to work although it can be physically laboring at times.
Q: Ok i am getting tired of my elevator keep breaking down every 3 days and when people get stuck i am the only one who have to call 911 for help even though i live in a 20 story high building.However my family are all asthmatics and we live on the13 floor complaining about the elevator every week the land lord takes a week to fix it every time it breaks down.My whole entire family was hospitalized after they were forced to climb 13 flights of stairs to get to their homes however my family is unqualified for insurance for unknown reason no matter how much they try to get insurance they dont get paid much when they work.Our medical bills put together was 2 million dollars because each of us had to stayed in the hospital for a month because or our asthma was severe.We talked about not paying rent since every 3 days the elevator keep breaking down and it takes a week to fix it.there 7 of us in the family who whose asthmatic do i have a case?
Don't blanketI live much farther north than you and I have never blanketed my thoroughbredWhen the weather's bad she just comes into her stall and she's inside overnight tooUnless you are clipping them, horses do fine in the coldThey grow a great thick winter coat which is perfect for keeping them warm! Unless it's wet or windy, they can go down to around 20-30 degrees with no blanketJust put a waterproof rainsheet on them when it's wet/windy and you'll be all setThe big problem I have with blankets is that they make horses who aren't clipped way too hotHorses already have the natural insulation of a thick winter coat, and adding a blanket on top of that often causes them to overheatWhen they overheat, they sweat, and the sweating causes them to get very coldso they go from very hot to very cold with a blanket onMuch better to just leave it off and let them regulate themselvesIf they are outside 24/7, then just put a waterproof sheet on when it's very windy or rainingOtherwise just bring them inside when it's raining and you don't need to put anything on them.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords