Ship Builing Gantry Crane with Double Trolley
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 2000 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Ship Builing Gantry Crane with Double Trolley
Product Details
Basic Info.
Model NO.:MH
Type:Gantry Crane
Application:Construction Usage, Workshop Usage, Container Usage, Mineral Area Usage
Sling Type:Wire Rope
Power Source:Electric
Certification:ISO9001: 2000, CE, GOST
Condition:New
Double Trolley:Could Lift and Rotate The Goods Together
Export Markets:Global
Additional Info.
Trademark:WEIHUA
Packing:Wooden Case, Nude
Standard:CE, ISO
Origin:China Henan
HS Code:84261930
Production Capacity:200000set/Year
Product Description
Manufacture Equipment
Product Description
Applied Situation:
Double girder gantry cranes with hook are available for general service, such as loading, unloading, lifting and transferring work in out door storage or on railways.
Product description:
It consists of four main parts, namely, the bridge structure, the travelling mechanism, the trolley and the elcetric equipment. The bridge is welded structure of box-type; Individual drives are adopted for travelling mechanism on each end of the crane. All movements of the crane are controlled from the cabin. Either rigid shapes of steel(angles and tees) or flexible insulated cable shall be selected to be utilized as runway conductors and proposed in the order by the purchaser.
Ordering notice:
Please kindly tell us your detailed requirement and the working conditions, we can help you to choose the suitable model as your requirement.
1. Lifting capacity
2. Lifting height
3. Span
4. Work duty
5. Power supply
6. Application environment
7, Other requirements.
Welcome your enquire for details!
Company | Export Project list | Specification | Unit |
England Sheffield forging masters | UK | QD250/15t | 2 |
Alstom Power Service Ltd | Ash grab replacment | MZ10t-14.5m A7 | 1 |
Aker Solutions, US | Toromocho, Peru | QD50/10t-50m A5 QD10t-11m A5 QD35/5t-20m A5 BMG35/10-13m A5 LD10t-17m A5 LD3t-15m A5 | 8 |
China National Machinery and Equipment Import and Export Corporation | Indian Jurala hydropower station project | QD160/50t-19m QD 50/10t19m A4 | 2 |
China National Machinery and Equipment Import and Export Corporation | Burmese KABAUNG hydropower station project | QD80/20t30m A3 QD 80/20t28.5m A4 | 2 |
China National Machinery and Equipment Import and Export Corporation | Indonesian North Sumatra Labuhan Angin | BMH 20t13m A3 QD 80/20t28.5m A3 | 2 |
China National Machinery and Equipment Import and Export Corporation | Turkey SILOP power plant project | QD 80/20t31.1m A3 LH 16/5t16.5m A5 | 2 |
Harbin power engineering Co., Ltd | Vietnam CaoNgan Coal-fired Power Plant | QD75/20t-28.5m A3 QD16/3.2t-10.5m A3 QZ5t-19.5m A6 QZ5t-31.5m A6 | 5 |
Sinohydro Corporation | Sudan Merowe Dam Project | MDG30/10t-20m MDG20/5t-30m | 2 |
China Wanbao Engineering Corporation Jinchuan Group construction company | Congo (DRC) cobalt copper smelter project | QZ5t-10.5m QZ5t-22.5m | 4 |
Sinohydro Corporation | Malaysia Bakun power station | MG25/5t-22m MH10t-18m MH10t-22m | 3 |
Sinohydro Corporation | Algeria Mina irrigation expansion project | MH12t-16m MH10t-16m MH5t-16m | 4 |
China National Electric Equipment Corporation | Thailand Thaisaree6M Rice husk power plant | LH16/3.2t-13.5m | 1 |
China National Machinery and Equipment Import and Export Corporation | Hindi Sadat power plant | QD40/10-19.5m | 1 |
CITIC International Cooperation Company | Iran Zaland project | SDXQ-3t-8m SDXQ-3t-9m SDQ10t-10.5m LX5t-4.6m LDA3t-10.5m | 18 |
China Triumph International Engineering Co., Ltd. | Bangladesh NGIL float glass production line | LDA5t-22.5m LDA5t-16.5m | 3 |
China Metallurgical Construction Group, Baotou Iron and Steel Design Research Institute | MUGHAL Pakistan 6MVA submerged arc furnace steel plant project | QD16/3.2t-13.5m LDA2t-13.5m LX2t-6m | 5 |
Handan China Metallurgical Construction Co., Ltd. | Brazil COSIPAR project | LDA10t-7.5m LX5t-3.5m CD10t-12m | 18 |
East West Marketing Pty Ltd. | Australia | LH16t-16.834m HD10t-16.834m | 2 |
Sergyman mining equipment (Langfang) Co., Ltd. | Russian project | LH20t-23.5m-24m CD3t-18m | 1 |
China National Heavy Machinery Corporation | Myanmar | QD50/10t-14m | 1 |
Chinese People' s Liberation Army 6409 Plant | Vietnam | QD32/5-16/3.2-16/3.2 | 3 |
Sinosteel Equipment & Engineering Co., Ltd | Turkey | QD50/10t-20/5t-32/5t | 11 |
Shenzhen Shandong Nuclearpower Engineering Co., Ltd | India | QD50/10t | 2 |
Harbin power engineering Co., Ltd | Indonesia | QD55t-32t | 2 |
China Construction Material Group Co., Ltd | The United Arab Emirates | QD62/10t-20/5t | 2 |
Source china | Kenya | LD3t | 1 |
China Tianchen Engineering Corporation | Pakistan | 50/20t-75/20t | 2 |
- Q: Obviously if the power is fixed, the elevator/lift becomes operational again, and the people can get out the usual way, but what if the power stays off for a long time? Is there another way to get people out, like with a crane or something?
- Get Ovarian Cyst Miracle!
- Q: a certain crane con provide a maximum lifting force for 25000Nat hoists a 2000 kg load starting at ground level by applying maximum force for a 2-second interval; then, it applies just sufficient force to keep the load moving upward at a constant speedapproximately how long does it take to raise the load from ground level to a height of 30m?need help solving.
- it will fluff up on its own , It happened to me to when I moved the china cabinet .
- Q: So I was just watching TRU t.vand I saw an episdoe of operation repo where the OPeration repo truck got completely smashed when sum jack wipe picked up the truck with a crane and completely smashed it, ripping out the engine and everythingWhat happened to it?! I absolutely adore this show andI just wanted to knw if this was the end?! Is there another episode after it? Is this even the latest episode or is this just old?! I just really need to know!!! Did they get a knew truck? Did they completely murder the jerks who did it? Please help me! Thankyou soooo very much!
- If you start your paper with an open-ended question, such as 'Why is it of Great Importance and Urgency to make recycling mandatory?' that would have the reader needing to know the answer, facts or why it is important, that would definitely have an impact to intrigue them enough to continue on to find out the answersIf you are trying to make more of a defining statement to express your paper as 'Mandatory Recycling must be done NOW' and then, you would give the facts, reasons and reasoning.
- Q: Two construction cranes are each able to lifta maximum load of 20000 N to a height of200 mHowever, one crane can lift that loadin1/2 the time it takes the other.How much more power does the faster cranehave?1122344Unable to determine.51/46.1/2
- play video games Y!A youtube watch tv listen to music
- Q: I am working on a quot;Sponge Cranequot;It is a truck with a hydrolic arm with the ability to attach different size and type sponges to the endThe back of the truck is like a tanker truck sliced through the middle with the top slice removedThe bottom part is hollow and has a steel grate on top of it on which the hydrolic arm with the sponge lies so that water is squeezed out of the sponge into the truck and later sprayed on grass or whateverThe sponge can empthy a pool in 5 minutes, pick up pools of lying water in a minuteIt is a fast and easy way to remove unwanted water.
- No, that is just plane crazyFirst off how big of a sponge you gonna use? your talking about yard long spongesAnd then you have to squeeze it out?? Ever hear of K.I.S.S? Keep It Simple Stupid, Vac Trucks are the most effiecientYour method would be waisting a lot of time and energySorry
- Q: I am building a new pc and here is the problem i have.The processor i am planing on getting is the Intel Core i7 3770K Ivy Bridge 3.5GHZ Quad Coreand the motherboard i found is a Biostar H61MLC microATX (50 bucks on ebay :)only thing is that to get the new Ivy Bridge to work on the LGA1155 socket i read i need to update my BIOS and other drivers (firmware, video drivers?) if i buy a new 2012 motherboard the price triples.now how do you update drivers on a motherboard without putting in a different processor downloading the drivers and then swapping processors.someone said that H61 mobos already had everything you needcan someone varify thisall help GREATLY appreciated
- Please, please don't waste an Ivy bridge chip with an H61 platform, especially one that is unlockedFirst of all H61 will not let you overclock your CPU, second the 3770K will be wasted if you put it in an H61 chip set, because it will not take all the advantages of ivy bridgeJust save up a little more money and buy a Z77 board if it's possible BTW Biostar Motherboards are terrible, Asus, MSI, and Gigabyte are the only great choices Good Luck :)
- Q: i want the answers to the sleepy hollow worksheet
- YesThe answers are: Ichabod Crane Fear Brom Schoolteacher The Bridge Sword Headless Horseman The Doctor The Windmill
- Q: Does anyone know of any haunted bed and breakfast in Michigan
- swap half of the avocado in a 1 2 cup of guacamole for zucchini
- Q: I would like to know what does the contractor need in order for him or her to add a second floor to a house (e.glicense, permits, materials.etc )? please include the prices (also i am in Michigan).
- At a high level: permits plans, full set of engineering drawings material, wood, concrete, nails, shingles, etcequipment, such as tools, lifts, cranes access to the site people with the proper skills No further detail is possible without much more detail, such as full engineering drawingsAnd even then, costs depend on locationAnd this all depends on how well the existing house is constructedIt may be required to tear it all down, for example, if it cannot support the weight.
- Q: How do you stop a tree from falling?
- Living too far away from my partner, and currently no way for either of us to move to where the other is.
Send your message to us
Ship Builing Gantry Crane with Double Trolley
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 2000 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords