Yuchai YC6A 199kw-2300rpm bus engine
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Yuchai YC6A 199kw/2300rpm bus engine
Type | Model | Displacement | Emission | Rated Power | Maximum Torque |
YC6A | YC6A240-20 | 7.255 | Euro II | 177/2300 | 860/1500 |
YC6A260-20 | 191/2300 | 950/1500 | |||
YC6A280-20 | 206/2200 | 1100/1500 | |||
YC6A240-30 | Euro III | 177/2300 | 900/1400-1600 | ||
YC6A260-30 | 191/2300 | 1000/1400-1600 | |||
YC6A240-40 | Euro IV | 177/2300 | 900/1400-1600 | ||
YC6A260-40 | 191/2300 | 1000/1400-1600 | |||
YC6A270-40 | 199/2300 | 1000/1400-1600 |
Keywords:bus engine,yuchai bus engine,diesel engine, weichai engine,weichai,chinese engine
Yuchai slogan:Outstanding Quality Global Yuchai
Feature:
Higher efficiency, lower fuel consumption, better for environmental protection
Bosch E-control high pressure Common Rail, Meeting the Euro-II,III,IV and V standard of emission
Power range covering 66-294 kW
- Q: What are pieces of HEAVY equipment?
- if okorder
- Q: Find a Dirty Jobs clip, 10 points! Mike and the Hawk from the mud mineral episode!?
- when I saw the question I was like oh this is easy but when I started looking it wasn't very easy. oh well I tried for ya ;)
- Q: okay so my first question is, do you need the achievement from the DLC with the Shang gru la (or however it is spelled) zombies map in it? Also how.do you time the excavator perfect so the egg guy goes onto the satellite after you hit em
- So i be attentive to that map is particularly stressful with those escavators they ar set to random on the place they are going to hit yet you ultimate possibility is to make as plenty funds as you are able to by utilising the 2d or third around so which you will turn on the flexibility verify u save a crawler so u can play the sam says interest and even have the scientist do each thing yet whilst the escavators come and it does not hit corridor variety six only restart it because of the fact its going to in basic terms get extra sturdy in case you do the beginning up by utilising around 3 the escavator comes by utilising around six or seven I even have all of it carried out by utilising around 12 plenty extra perfect and much less puzzling in case you like halp I do supply help to those that want it I do it for acquaintances all the time I even have all the easter eggs my GT MATT TR0P0LIS the O's are zeros only message me in case you or everybody desires help
- Q: What are the various professions in real estate industry likeReal Estate AgentsBuilders and DevelopersArchitectsInterior DecoratorsVaastu ConsultantsWhat are the other popular professions that I have missed to mention above?
- Engineering consultants who work for structural designs Equipment manufacturers and suppliers (Earth movers, excavators, dumpers, pumps, etc) HVAC (Heat,ventilation and air conditioning design, supply and erection) Waterproofing agencies Registration authority for transfer and registration of property. Surveyors and town planners Electrical installation suppliers and erectors (for DG sets, inverters etc ) Banks for loans etc ...etc..
- Q: A friend has told me that there is a product (he thought the name was something like Essomite) that is a liquid that when poured into a crevice or drilled hole in a rock or cement will harden and expand with enough force to crack the rock or cement material. He thinks that it is a product that was developed by a Japanese company. I've tried searching on the name but have come up with nothing. Anyone know of such a product? Thank you.
- I work in the Concrete Industry and it called Betomonite (not sure of the spelling). Most people use a jackhammer, excavator, or a concrete saw to get rid of concrete. The other three that I mentioned would serve the same purpose, and probably cheaper. most of the Chemicals used in our industry are extremely expensive, and with times as they are right now, most of your contractors are trying to save money. Not spend money that can be saved doing it the conventional way.
- Q: Dump trucks, earthmoving, shovel loading, vehicle distance from 48km, according to 2014 valuation quota,
- .Five. For sprinkler (northern) 1-1-22 sprinkling water, filling water = filling volume * earth dry density * (optimum moisture content - natural moisture content) / (1+ natural water content).Six, fee, gasoline and diesel price, distance and other information according to the actual selection. Pay attention to the budget quota supplement, this is critical.Must have unit price, so give you count, dig, install 3.5 yuan + freight 48 yuan + rolling (sprinkler) 4 yuan, about 45.5 yuan /m3, without tax, management fees and so on.Also no matter what your site construction machinery, machinery is not allowed to swap quota, specifically to see the "interpretation" is not a detailed quota.Non professional, self-study. If there is any mistake, please correct me.
- Q: Im building a new house and i am currently arranging to have the excavator contractor there to install septic and excavate for the foundation. Then im having the foundation contractor come in to do his job. I live in Nova Scotia if that makes any difference. Should any of these guys be asking for money up front or part way through? Or do they finish then bill me with 30 days to pay? Whats the normal procedure?
- I just built a house. I paid the architect after final billing and paid the contractor first a deposit, and from then on had a planned payment schedule of 3 sums with the successful completion of each stage as described in our contract. There was also a final payment for requested extras not included in our quote. Our builder is a very stand up guy.
- Q: I'm 18 and I live in Massachusetts, I recently committed a Vandalism crime that included my smashing a few windows on an abandoned (seemingly abandoned) excavator with a couple of friends. The damage came to (based on the police officers quick estimate) upwards of $250. I don't know why I or any of us did it but we feel horrible. The police came a few days ago at the scene of the crime and took our information. They also told us we would receive a summons to court in about 6 weeks. I and all of my friends are 18 and we all have perfectly clean records prior to this. We did a stupid thing and want to do anything and everything we can to rectify what we did. With a clean record and the cost of the damage done in mind...what's the worst that could happen to us? And is there any chance that this won't be put on our records if we take the proper steps...?
- Vandalism, or destruction of proper over $250 is a FELONY in Massachusetts. $250 is the felony limit for any crime in Massachusetts, unfortunately, we#x27;re on the lower end of felony limits. Pennsylvania is one of the highest around $2000 or $2500 if I remember correctly. Considering your age AND your clean record, you#x27;ll most likely be offered a CWOF (continued without a finding) where you admit to the facts, agree there would be enough evidence to convict you, but you#x27;re not pleading or being convicted. It is filed away and dismissed. You#x27;re still responsible for the court costs and don#x27;t get in trouble again. They won#x27;t keep handing out CWOFs to repeat offenders. Otherwise, it#x27;ll be dropped to a misdemeanor, but again, court costs will still be required. $150 or 15 hrs community service for court appointed attorney if you qualified for one. I#x27;d be willing to bet you#x27;ll get the CWOF. Massachusetts is lenient like that you#x27;re first time. Even on certain felonies. Good luck!
- Q: How long approx will it take a new operator (I am going to get the feel for it first, just saying no prior expeirence) to dig this hole? (8ft deep)I am aware I have to shore it. I plan on building 2 plywood/2x4 walls across the long side of the hole and connect them across at the corners, then buildthe other 2 shorter walls and attach. Will this work good any sugestions?
- If you are a first time operator, you CAN'T make a hole that size, regardless of how you attempt to shore it. Keep your cell phone handy so you can call for help from UNDER the excavator inside the hole.
- Q: What should we pay attention to when purchasing excavators?
- Excavators should pay attention to the chassis, hydraulic systems, walking systems, walking systems of steel (especially rail training and bucket teeth) is normal.Open the engine cover and check the exhaust pipe for signs of smoke. You can pull out the dipstick and check whether there is smoke. Too many usually illustrate the need to replace the piston rings of smoke, and may soon have to overhaul the engine also includes basic inspection and check the radiator and engine oil liquid, the corrosion degree of the engine and check the battery, check around there is no obvious leakage.Excavator, also called excavating machinery, is a kind of earthmoving machine that uses bucket to excavate material that is higher than or lower than the machine surface and is loaded into transportation vehicle or unloaded to the stacker. Excavators are mainly made of soil, coal, sediment, and soil and rocks that have been pre - loosened. From the development of engineering machinery in recent years, the development of excavator is relatively fast, excavator has become one of the most important construction machinery in engineering construction. The three most important parameters of excavator are operation weight (quality), engine power and bucket bucket capacity.
Send your message to us
Yuchai YC6A 199kw-2300rpm bus engine
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords