• wing nut series/building material 1 System 1
wing nut series/building material 1

wing nut series/building material 1

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Quick Details

Model Number:
10/12 15/17 20/22
Type:
Scaffolding Parts
Scaffolding Part Type:
tie rod wing nut
material:
QT450-10
specs:
15/17
tensile strength:
above450Mpa
percetage elongation:
above10%
surface finish:
electro galvanized
paking:
bags and pallet
payment:
30% in advance, balance against the B/L copy
customizable:
available
MOQ:
1000 pcs

Packaging & Delivery

Packaging Detail:bags and pallet
Delivery Detail:3 days

Specifications

wing nut series/building material
high quality reasonable price
process: sand casting
surface :electro galvanized

wing nut series/building material

formwork wing nut, tie rod wing nut





product mechnical properties:

Castings of superior quality produced from electric furnace instead of cupola furnace


most suppliers use,thus ensure the homogeneity and stability of the composition and


reduce the casting defects to minimum.all material properties including composition,

tensile/yield strength,elongation conform to the Chinese Standard GB QT450-10 (DIN

GGG450/NF FGS450-10).

Material: ductile Iron QT450-10


Process: sand casting


Tensile Strength: ≥450Mpa


Percentage Elongation: ≥10%


Surface Finish: electro galvanized


Packing: Bags and Pallet


payment: 30% in advnce ,balance against the B/L copy


MOQ:1000pcs


Q: Please help me in building professional people (scaffolding)
Door type scaffolding when used in general decoration, that thing is a direct product, a simple spell on the line, who rent who fightBowl buckle scaffold is also finished steel pipe, but there is no fastener, his fastener is a kind of fixed in the steel pipe instead of the demolition of the scaffolding is more convenient than ordinaryRent depends on the specific market
Q: How to calculate the rental price of portal scaffolding
According to the daily calculationSeparate accessories, such as pulleys, pedals, base, three foot and so on
Q: How to calculate the double wall scaffolding
The adjustment coefficient of the bearing capacity of the foundation: KC = 0.400;The average pressure of the bottom of the vertical rod foundation, P = N/A =84.900 kN/m2;Among them, the superstructure to the top surface of the axial force design value: N = 7.641 kN;Basal area (M2):A = 0.090 m2.P=84.900 = fg=200.000 kN/m2. Calculation of bearing capacity of foundation!
Q: Do the external wall decoration (from the top down to do) scaffolding is to wait until after the completion of the indoor and outdoor decoration before the demolition?If the first interior decoration, can make a layer of a layer of it is to remove all the work finished I mean I finished all the interior decoration, wall decoration only, then I do a wall decoration on the demolition of a layer of scaffolding, this site useful no
Two, removal of scaffolding, should meet the following requirements:1, the demolition work must be from top to bottom layer by layer, prohibited from top to bottom operation at the same time;2, even the wall must be removed with the scaffolding layer by layer, is strictly prohibited even after the first wall or a few layers of the demolition of the demolition of the scaffolding; demolition of the height difference should not be greater than 2 steps, such as the height difference is greater than the step, should be added to strengthen the wall;3, when the scaffolding down to the bottom of a long rod height (about 6.5m), should be in the appropriate position to set up temporary support reinforcement, and then dismantle the wall;4, when the scaffolding to take the sub section, the demolition of the sub elevation, the demolition of the scaffold should not be removed at both ends, should be added to the wall and lateral oblique reinforcement.
Q: The latest JGJ130-2011 construction fastener type steel pipe scaffolding safety technical specifications, schedule A.0.2 what role, how to correctly use it?
Schedule A.0.2 role: the calculation of scaffolding, the need to calculate the bearing capacity of the scaffolding
Q: opinions on scaffolding piercing and how to hide it from school :)?
While they're healing, they need to stay in so there's no way of hiding it. Wait until the beginning of the summer and get it done then
Q: For indoor use of mobile scaffolding safety construction plan! Four support points with four pulleys with brake!The construction scheme of scaffolding safety belt for indoor high Jiqiu braking pulley, for about 12 meters of buildings, indoor emergency please heroes!
Wall point setWhen the height is not less than 6.0m, you must set the uniform distribution of wall, its setting should meet the following requirements:Door type steel pipe scaffold: when height is less than or equal to 20m, less than 50m2 of a wall, and even the vertical spacing wall point should be less than or equal to 6m; when the frame of high >20m, not less than 30 M2 a point, and even the vertical spacing wall point should be less than 4m.The other floor (or bottom bracket) scaffolding frame: when high than 20m, a point of not less than 40m2, and even the vertical spacing wall point should be less than or equal to 6m; when the high frame >20m, a point of not less than 30m2, and even the vertical spacing wall point should be less than 4m.The free height of the upper wall of the scaffold is not more than 6m.
Q: I really want a scaffold piercing and I can pay for it, I get good grades, I do all the chores I have to do, I spoke to them calmly and everything. Yet they still won't let me. My dad said that I will be grounded forever and everything but last time I got grounded, I went to a party the next day so what should I do?
dont do it. when your parents say grounded, you may be let off easy but if is about your body then if you get it your in deep ****. also your parents could see this question and then you would be in even more trouble. please dont get it. also things like that are really hard to hide from parents. if your 18 years or older llegally they cant stop you from doing it. i dont think you should do it.
Q: The basic form of external scaffolding
The limit pin of the upper bowl buckle and the upper bowl buckle is arranged on the steel pipe upright rod according to the 60cm distance, wherein the lower bowl buckle and the limit pin are directly welded on the vertical rod. When the utility model is assembled, the notch of the upper bowl buckle is aligned with the limiting pin, the cross rod joint is inserted into the lower bowl buckle, and the upper bowl buckle is pressed and rotated. Bowl buckle joints can be connected at the same time 4 bars, can be perpendicular to each other or deflect a certain angle.
Q: Fastener type steel pipe scaffold composed of which components?
Reference to "construction safety of steel tubular scaffolding safety technical specifications" JGJ 130 - 2011, 8, page parts3.1 steel pipe3.1.1 scaffolding steel pipe should be used in the current national standard "straight welded steel pipe" GB/T13793 or "low pressure flowQ235 steel pipe for the welded steel pipe used for conveying body; the steel quality of the steel pipe shall be GB/T3091In accordance with the existing national standard "carbon structural steel" GB/T700 Q235 steel provisions.3.1.2 scaffolding steel pipe should be used 48.3 * 3.6. The maximum quality of each steel pipe shall not be greater than25.8kg.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords