Weihai Wanfeng Tower Crane TC6015
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 35 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Weihai Wanfeng Group is located in Manshan Town, Weihai City-Model Town of National Small Town Construction, where
traffic is convenient and industry is developed.
Weihai Wanfeng Group, originally founded in 1995, is one of the first enterprises that restructured in Wendeng City
in 1997. The present group company was founded in 2003 and composed of four companies-Wanfeng Steel Structure, Wanfeng
Door & Window, Wanfeng Leasing and Yifeng Properties. It has 400 staff, fixed assets of about RMB70 million and land
area of 90,000m2. Main products include FO/23B, 7030, QTZ125, QTZ80, QTZ63, QTZ40 and QTZ315 series tower crane,
construction lifts and material elevator, as well as construction steel structure and high-grade aluminum-plastic doors
and windows. Its products are sold in more than 10 provinces and cities in China and over 20 foreign countries.
Weihai Wanfeng Group is Top 10 Tower Crane Enterprises of Shandong Province, Top 100 Private Enterprises of Weihai
City, Top 20 Enterprises of Wendeng City, "AAA" Level Banking Credit Enterprise, Provincial-level Advanced Equipment
Management Unit, Provincial-level "Contract Honored and Promise Kept" Unit and Top 100 Provincial-level Honest
Enterprises. "Wanfeng" trademark was rated as Shandong Famous Brand, and Wanfeng tower crane is honored Shandong Brand-
name Product.
Weihai Wanfeng Group has always been adhering to the business tenet of "quality first, credit first", regarding
customers as God and workers as source of development, paying attention to technology development, service and product
quality, introducing and innovating brand products, and injecting endless vigor and vitality to the company development.
Weihai Wanfeng Group has strong technical force and excellent testing equipment. In 2001 it passed IS09001: 2000
Quality Management System Certification, and enhanced both management and service quality. With China's entry into WTO,
Wanfeng Group keeps an eye on the world development and continuously expands foreign markets. In 2004, its products
entered the international market, in 2006 took the lead to achieve license to enter the Russian market, and in 2007
passed CE certification and opened the door to the EU market, winning favorable opportunity for construction in foreign
market. With good reputation and services, our products attracted are more and more foreign customers.
After nearly 10 years of development, Wanfeng Group has developed into an enterprise engaged in multi industries-
construction machinery, construction steel structure, building doors and windows, and real estate. The opening Wanfeng
Group always marches ahead.
Mr. Ma Shangquan, chairman of Wanfeng Group, said, "We serve your need, and promise to meet your satisfaction", and
welcomes cooperation with old and new customers to expand business opportunities and seek common development.
The developing Wanfeng Group will continue to innovate and take part in market competition both at home and abroad
with confidence and determination, produce newer and better products based on self-encouragement and strict management,
and strive in the new century future development to accept the challenge.
- Q: How much height should tower crane work at M?
- When the crane in the layout to drawing, especially in real estate development area, residential buildings, such as tower crane, but also to consider the safety distance of adjacent tower crane, two in horizontal and vertical direction to ensure the safe distance of not less than 2m, the adjacent tower crane tower crane and interference can not occur.
- Q: A crane that docks is capable of doing 550 J of work. How high can it lift a load that weighs 45N?
- A crane can lift it's rated limits to full extension. Provided 45N is within it's rated capacity, it can lift it as high as the crane can lift items.
- Q: I recently read that adult crane flies consume nectar or do not eat at all, their only purpose is to mate. After a crane fly mates, is starvation the cause of its death, or is there something else that ends its life such as age?
- Adult crane flies survive from all the fat they have, from their larval and pupal stage.When they run out of it, they eventually cannot find food, and by that time, they should die of age.It's probably both causes, if not because of predators,disease..etc
- Q: Just wondering i am so confused
- It's a crane thing. Seriously though - overhead crane, gantry or polar crane!
- Q: Secured to a concrete floor with 12 30mm bolts
- That can only be answered by analizing it. A crane as you are supposed to know has different loads and directions of impact due to the moving bridge, the trolley, and break loads. So what it can lift depend on the whole structure. Besides depends as much on the type of crane
- Q: what is the crane track base ?
- Assuming mechanical I suppose that is the size of the area of the two tracks on a crawler type crane. The tracks or treads are similar to those on a tank or bulldozer. One track covers a rectangle in contact with the ground. Both tracks are spread apart, parallel and form some kind of rectangular (length x width) base area for the crane.
- Q: the lifting capacity of a hydraulic crane is based on two primary design factors what are they?
- Stability(when it tips) and mechanical structure (when it breaks). Bomba is right: when it comes to a simple hydraulic cylinder. The complete crane is a more complex beast than that though.
- Q: In order to ensure the stability of tower cranes, generally along the height of the tower and building a number of meters attached
- Self lifting tower crane tower 45 meters high to prevail, such as height of over 45 meters, each increased to 10 meters (less than 5 meters, excluding) demolition costs increase 20%, off-site transportation costs increased by 10%.
- Q: How many meters does the tower crane installation height require expert proof?
- Circular of the Ministry of housing, urban and rural construction on Issuing the measures for the safety administration of sub hazardous and sub divisional projectsAnnex No. [2009]87 [Annex two]"More than a certain size of the risk of larger sub sub project scope."Three, lifting and installation, demolition works(1) lifting projects with unconventional lifting equipment and methods with single lifting weights of 100kN and above.(two) lifting equipment installation with lifting weight 300kN and above; demolition work of climbing crane within height 200m and above.The installation and disassembly of the tower crane in accordance with the provisions of the above provisions shall be verified by the expert panel.
- Q: how to make an simple electromagnetic crane?
- STEP 1 Buy a Crane Step 2 put a electromagnet on iy Step 3 stick ur name on it you get DIY crane
Send your message to us
Weihai Wanfeng Tower Crane TC6015
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 35 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords