Waterseal Mastic Moisture Seal Overwrapped with Vinyl or Rubber Tape
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 roll
- Supply Capability:
- 500000 roll/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Description of KC86 Tape
• KC 86 is a self-amalgamating mastic tape used for moisture sealing on all types of telecommunications and solid dielectric power cable splices and connections.
• It is a tacky, temperature stable mastic with excellent conformability and adhesion to metal and all types of cable insulations and jackets.
• It is put up on a white release coat separator in roll form without any core.
• Once applied, KC 86 mastic should be overwrapped with a vinyl or rubber tape which will encapsulate it and, throug centripetal force, make it into every crevice and indentation in a cable jacket thereby giving a superior moisture seal in a splice or aroun any connection.
• The tape is also RoHS compliant, resistant to corrosion, chemicals and salt water and has no adverse effect on cable insulations.
• Its 2.5mm thickness facilitates rapid protection build-up.
• Use in conjunction with KC 63 premium vinyl electrical tape for optimal performance.
Dimensions of KC86 Tape
2.5” x .1” x 23.6”
63mm(width) x 2.5mm(Thickness) x 0.6m(length)
Consult us for other sizes
Specifications of KC86 Tape
Applications of KC86 Tape
• Moisture seal and insulation in power cable through 600 volts
• Moisture seal and insulation of telecommunication cable connections in base stations, antennas and aerial feeders
• Other moisture sealing applications
FAQ
1.Before placing order, can we make sample firstly?
Sample can be arranged to send to you to test before placing order.
Sometimes sample is free ,sometimes sample charge should be included if more than 3 pcs with material .
But we are afraid freight charge will be paid by yourself.
Certainly, we will adjust additional sample and freight charges into your bulk order.
2.How can I get your sample?
Of course, we can send you some samples. Most samples are free, but sometimes we will take small sample fees.
Maybe you also send us your DHL or EMS/UPS/TNT etc account ,so you can pay for air freight to your carrier company directly.
3.Whether we can print our logo or need our color or size or not?
Yes, because we have our own factory and R&D team, so we can make products as your demands.
We can print your logo, we also can make as your size and print it as your color.
4.How many kinds of payment terms you can accept?
About payment terms, we would like 100%TT if less than $1000.00
Usually for bulk order , would like can be paid pay 30%- 50% advanced payment and the rest should be paid before dispatch.
We hope this information will be helpful to you, if you have any question, please feel free to contact us, we are always at your service.
- Q: How to do waterproof bathroom, construction process is what
- 2, brush the second time waterproof coating. It should be noted that the first coating to be dry before the second brushing, the specific time depending on the product characteristics may be. If the interval is too short, the first pass of the paint has not been dry, waterproof effect will be greatly reduced.
- Q: Eastern rainbow waterproof how to do
- especially small places to pay attention, such as: sewer such as. And then dry about 10 hours or more, (see the environment may be, like a dry) so repeated 3 side painting is appropriate.
- Q: What decoration materials, light and water, and the wall, the perfect combination of glass
- Four, pressure glue Hold the 45 ° angle along the gap to press out the glass compound to ensure that the glass compound is in close contact with the substrate surface. Glue gun moving speed according to the size of the gap, the depth of the line evenly move the glue gun, cloth evenly full, do not pile material and broken. When the seam width is greater than 15 mm, need to repeatedly glue.
- Q: Find the construction steps for waterproof coatings
- 3, note (1) rain weather and five wind above the weather shall not be construction. (2) coating waterproof layer shall not have bottom leakage, cracking, holes and other defects and peeling, bubbling, carcassing and wrinkle phenomenon. Coating waterproof layer and the base should be bonded between the solid, no hollowing, trachoma, delamination and so on. (3) the coating site should be continuous, solid, shall not appear Alice, hollowing parts. (4) rigid protective layer before the completion of any personnel shall not enter the construction site, so as not to damage the waterproof layer; coating of the overlapping parts should be care by the staff. (5) roof should be used lime soil, clay or sub-clay for backfill, thickness 50 cm, backfill shall not contain stones, gravel, ash and organic matter. Artificial compaction of each layer 25 cm, mechanical compaction of each layer 30 cm, rammed to prevent damage to the waterproof layer. In the backfill thickness of more than 50 cm, it is allowed to use mechanical backfill rolling.
- Q: Cabinet is to buy finished products, or directly to the decoration company to do?
- Do the cabinet can be in accordance with your size, finished cabinet moldy, which is not necessarily. You have to buy some of the Well
- Q: What should you pay attention to before the construction of the basement waterproofing membrane?
- Plastic runway construction should pay attention to: 1, before the construction, must be on the asphalt concrete foundation for quality acceptance, acceptance criteria according to design standards and technical specifications, the plastic runway in the corresponding drainage facilities, can be used around the clock. The ambient temperature should be controlled at 5 ℃ ~ 38 ℃, to avoid below 5 ℃, 38 ℃ above the ambient temperature operation, the relative humidity control below 70%, the foundation requires a clean, according to the temperature and relative humidity to adjust the amount of catalyst The curing speed control appropriate. Color paste and prepolymer storage, the lid to be tightened, before use to detect moisture, qualified after use, the water in the foundation should also be controlled to avoid the bubble after the glue. Plastic pavement materials must be carefully checked when the quality inspection certificate and validity period.
- Q: What are the key points and contents of the quality control of waterproof material?
- 3, infiltration of crystalline cement-based waterproof coating: on-site fraud is to use ordinary cement mixed with seafood powder (or 801 glue) so that the cement after the solidification of the color, it will not crack. Genuine infiltration of crystalline cement-based waterproof coating will have a hydrophobic effect that is the effect of lotus leaf water droplets (of course, this hydrophobic effect can not be too much, otherwise it will affect the next process of bonding).
- Q: What is the car material so that the car can be waterproof, in the rain will not leak in?
- ?C. metal technology and other: metal technology refers to the aluminum plate and other metal plate through the machine to suppress the concavity and convex surface, and then made of metal paint color, and finally after grinding, drawing and other production of the car stickers (car standard); Area can not be too large, can only be used for a small range of iconic car stickers.
- Q: Rigid (concrete) waterproof roofing shop SBS coil can brush a layer of waterproof paint before?
- First, rigid (concrete) waterproof roofing SBS membrane should not be painted before the coating of any waterproof coating, otherwise it will damage the bonding strength of the coil and the grassroots.
- Q: Roof sunscreen waterproof layer leakage, brush milk white plastic can solve it?
- Second, check the plaster layer is empty, if not empty easy to use polyurethane brush twice, the surrounding multi-coated 10 cm. If the empty drum, then use the cutting machine to remove the plaster within the scope of the plaster, along the cracks on both sides of the expansion of 10 cm brush twice the polyurethane, brush the cement slurry and then do the surface layer. If a large area of ??leakage, it is recommended to use acrylic waterproof coating brush twice, because the polyurethane black too heat in summer affect the indoor temperature.
Send your message to us
Waterseal Mastic Moisture Seal Overwrapped with Vinyl or Rubber Tape
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 roll
- Supply Capability:
- 500000 roll/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches