• Wanfeng Tower Crane FLATOP System 1
  • Wanfeng Tower Crane FLATOP System 2
  • Wanfeng Tower Crane FLATOP System 3
Wanfeng Tower Crane FLATOP

Wanfeng Tower Crane FLATOP

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
12 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Weihai Wanfeng Group is located in Manshan Town, Weihai City-Model Town of National Small Town Construction, where

traffic is convenient and industry is developed.
  Weihai Wanfeng Group, originally founded in 1995, is one of the first enterprises that restructured in Wendeng City

in 1997. The present group company was founded in 2003 and composed of four companies-Wanfeng Steel Structure, Wanfeng

Door & Window, Wanfeng Leasing and Yifeng Properties. It has 400 staff, fixed assets of about RMB70 million and land

area of 90,000m2. Main products include FO/23B, 7030, QTZ125, QTZ80, QTZ63, QTZ40 and QTZ315 series tower crane,

construction lifts and material elevator, as well as construction steel structure and high-grade aluminum-plastic doors

and windows. Its products are sold in more than 10 provinces and cities in China and over 20 foreign countries.
  Weihai Wanfeng Group is Top 10 Tower Crane Enterprises of Shandong Province, Top 100 Private Enterprises of Weihai

City, Top 20 Enterprises of Wendeng City, "AAA" Level Banking Credit Enterprise, Provincial-level Advanced Equipment

Management Unit, Provincial-level "Contract Honored and Promise Kept" Unit and Top 100 Provincial-level Honest

Enterprises. "Wanfeng" trademark was rated as Shandong Famous Brand, and Wanfeng tower crane is honored Shandong Brand-

name Product.
  Weihai Wanfeng Group has always been adhering to the business tenet of "quality first, credit first", regarding

customers as God and workers as source of development, paying attention to technology development, service and product

quality, introducing and innovating brand products, and injecting endless vigor and vitality to the company development.
  Weihai Wanfeng Group has strong technical force and excellent testing equipment. In 2001 it passed IS09001: 2000

Quality Management System Certification, and enhanced both management and service quality. With China's entry into WTO,

Wanfeng Group keeps an eye on the world development and continuously expands foreign markets. In 2004, its products

entered the international market, in 2006 took the lead to achieve license to enter the Russian market, and in 2007

passed CE certification and opened the door to the EU market, winning favorable opportunity for construction in foreign

market. With good reputation and services, our products attracted are more and more foreign customers.
  After nearly 10 years of development, Wanfeng Group has developed into an enterprise engaged in multi industries-

construction machinery, construction steel structure, building doors and windows, and real estate. The opening Wanfeng

Group always marches ahead.
Mr. Ma Shangquan, chairman of Wanfeng Group, said, "We serve your need, and promise to meet your satisfaction", and

welcomes cooperation with old and new customers to expand business opportunities and seek common development.
  The developing Wanfeng Group will continue to innovate and take part in market competition both at home and abroad

with confidence and determination, produce newer and better products based on self-encouragement and strict management,

and strive in the new century future development to accept the challenge.

Q: I have a problem in discovering the breakdown in the tower crane control panel. If you can give me a procedure to follow the problem in the control panel.
Generally tower cranes have their electrical panels at the ground floor. Troubleshooting in the tower crane is not different to any other electrical system. First check the power circuit healthiness--switches,fuses,contactors and then go for control circuit. The cranes have few additional interlocks for excessive forward movement, extra long travel etc. Just go through the drawing and u will get the problem solved
Q: I've heard that daddy longlegs aka crane flies contain the most deadly venom of all insects. The only reason they aren't dangerous or deadly is because they have no mouth or 'straw' to inject the venom. But I'm not sure what's correct. Although they cannot harm us humans, is it possible for them to be able to inject the venom into other creatures?Also, I've heard that dragonflies contain deadly venom too, but just like with the crane flies, they cannot transfer the venom any way. Is this true?Any zoology professionals? Note: I may need correcting, and this may even be just an urban myth.Thanks for your time!
Most Venomous Insect
Q: What kind of tower cranes are available? How about the scope of all kinds of tower cranes?
Tower crane is divided into fixed tower crane, mobile tower crane, jack up tower craneThe mobile tower crane is divided into track type, tire type and automobile typeThe jack up tower crane is divided into two parts: internal climbing type and attached typeUsage: loading and unloading concrete by hanging tank for general construction and installation
Q: hiya :) for my birthday i want an arcade style grabber machine that can pick up sweets and accept real money etc. I dont want small plastic ones because they are pretty pathetic tbh. I know its a bit random but i really appriciate it because my birthday is coming up ;) i want it being in the range of ?60-?100 :) thanks
Do okorder / There's some at the bottom there for sale for only $2175 if you're willing to shell out that much. Cheers
Q: the question is :Two cranes can unload a ship together in 15 hours. The faster crane takes 16 hours less than the slower crane, if each were to unload the same ship alone. How long doesi t take for each crane to unload this ship? I done most of the math but i am stuck with this last part .15+- radical 1185/2
No. of hours for the slower to unload alone—x: 1/x + 1/(x - 16) = 1/15 (x - 16 + x)/(x? - 16x) = 1/15 15(2x - 16) = x? - 16x 30x - 240 = x? - 16x x? - 46x = - 240 x? - 23x = - 240 + (- 23)? x? - 23x = - 240 + 529 (x - 23)? = 289 x - 23 = 17 x = 40 No. of hours for the faster to unload alone: = 40 - 16 = 24 Answer: slower crane, 40 hrs; faster crane, 24 hrs Check: = 15(1/40 + 1/24) = 15([3 + 5]/120) = 15(8/120) = 15(1/15) = 15/15 or 1
Q: My science teacher wants to know why cranes make work easier rather than just lifting an object yourself. She refers to the formula of force x distance. So i have to compare (in a way) the work of a human lifting an object and a crane lifting an object. Grrrr.... I hate this project!
The type of crane she is referring to ia a simple pole with a fulcrum placed between the person operating the crane, and the mass to be lifted. Imagine a weightless pole with a rope tied to one end attached to a mass of weight 224 lbs The pole is 9 feet long Let's say the human weighs 112 lbs, or half of what is to be lifted. Without a crane, it will be difficult to lift that much and swing it around. With the crane, though, let's look at the advantage when a fulcrum is placed under the pole and the person pushes down on the pole to lift the weight. First, note that gravity is in favor of the person to use their weight on the pole. Using physics, with the fulcrum place at x from the mass to be lifted, the downward force of the person is F*(9-x)=224*x or F=224*x/(9-x) now plug in some values for x and compute the force: x F 4.5 224 3.5 143 2.5 86 1.5 45 0.5 13 I started by placing the fulcrum exactly in the middle and then moving the fulcrum in increments of 1 foot closer to the weight to be lifted Notice that the more pole towards the person pressing down, the less force the person has to apply to lift the weight. Also, note that when the fulcrum is in the middle, the person must apply a downward force equal to the weight - which willl be difficult foir a person that weighs 112lbs. However, once the fulcrum is placed 2.5 ft from the weight, the person only need apply 86 lbs of downward pressure. Leverage. j
Q: I got the crane gold 1.6 roller rocker I'm trying to install on my 95 z28 w/ an lt1 and it doesn't seem like they are installing quite right. I got the tall black nuts that hold the rocker down around the stud and the pushrods, that's it. Do I need to use those things that go below the rockers themselves (the things that slide over the stud and the rocker goes over it from the original rockers) or do I just install how I already am with just the crane rockers, black nuts and pushrods?
Lt1 Roller Rockers
Q: Do they have any symbolic-ness about them? any thing like that is good! THank you!
There okorder /.. The crane is a symbol of long life, prosperity, and good health, according to Japanese culture.
Q: For anyone who has read/studied Stephen Crane - do you know of any connecting theme within his most famous short stories (the open boat, the blue hotel, the bride comes to yellow sky, the monster)?I was think naturalism b/c it is so prevalent in the open boat but is really the only short story naturalism is in
sorry, i haven't read any Crane short stories, but i'm a HUGE fan of his poetry. it's some of the most bleak, raw, yet honest poetry i've ever read.
Q: i cant find a poetry site that will let me read this portion of The Bridge, the epic poem. i need help
I okorder /.. Try searching lines from the poem if that doesn't work for you like imponderable the dinosaur sinks slow.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords