• Up-slung launching gantry System 1
Up-slung launching gantry

Up-slung launching gantry

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Description

1) Double main girder andtwo-span structure, more secure, faster. Applicable to the low pier andclearance under bridge is not demanded. Simple construction, needless todismantle the main girder and outside mould parts;

2) Outside mould system opens and closes transversely,original design and ingenious conception;

3) Transverse movement and hoisting is propelled bythe power, easily and fast;

4) Lifting and opening, closing are controlled by thehydraulic pressure, with steady movement which is secure and reliable. Reducethe labor intensity and upgrade the construction efficiency;

5) All the legs can pass through the whole automaticallyand erect, reducing the investment of auxiliary equipments, reducing theconstruction cost.

Performance and parameters

Applicable longitudinal gradient: 2.0%
Applicable curve radius:
≥1500m
Requirements for environment wind pressure:

Maximum allowable wind pressure during shifting: 150N/

Maximum allowable wind pressure during casting: 800N/㎡ ( or to be anchored)
Total power by using the whole machine:About 95kw
Kinetic condition: 4Ac, 380v, 50Hz
Hydraulic system pressure: 32Mpa
Shift speed: 0-1.5m/min
Deflection of main girder: Less than L/700( only considering the deflectioncaused by the concrete loading and internal mould weight)

Via Hole Stability Factor: k>1.5
Transportation condition: meet the limits of railway and highwaytransportation.
Unit Weight: About 530t (without separated mould situated in the support)
Construction cycle: 10 days/span


Q: title says it alllWill it ever be possible for scientists to physically stop a earthquake with any machinery or something like that
I doubt it Earthquakes are caused by Teutonic plate movement. Teutonic plates are big.
Q: What are the large machinery in the construction project?
Hoisting machinery, such as tower cranes, self-propelled cranes, mast cranes, clamshell cranes, etc.. Compaction machinery such as tire roller, smooth wheel roller, single foot roller, vibratory roller, tamping machine, tamping machine, etc..
Q: The mechanical engineer applies for the condition English to say is must four above, but I did not achieve 4 levels, may have other ways
Mechanical Engineer conditions apply: the applicant must have good occupation behavior, comply with the code of ethics, and to provide the following documents: (1) university graduation certificate; (2) foreign language certificate; (3) computer certificate; (4) mechanical engineers' comprehensive qualities and skills examination qualification certificate; (5) in China machinery the engineering society promulgated "a course in mechanical engineering professional and technical personnel to continue education provided subjects guide" in training and obtain a certificate;
Q: I want Civil construction machineries manufactures list
I don’t know where you would find a complete list but I know some of the most popular brands. Caterpillar John Deere Case New Holland Alles Chalmer Bucyrus-Erie Clark International Austin-Western Galion Aveling Barford leeboy Champion Adams Dormash Dresser Faun Huber Terex Dynapac Euclid JCB Fiat Bobcat Volvo Hitachi Komatsu -
Q: If I took off the machinery cover off my AK-47 rifle and I was to insert a loaded 30 round clip in the magazine well. And I was to pull back the charging handle, aim at the target, and then pull the trigger. Will it be a safe thing to do? Or will I get hurt?
Actually yes. The only purpose it serves it has is to keep dust out. Plus maybe some help with the aesthetics.
Q: I'm trying to get a quote on shipping a heavy sand blaster from New York to Oregon, but I'm can't figure out what this freight class is that I'm being asked for. Thanks
I've okorder /
Q: On 1st January, 2000 a firm purchased machinery worth Rs.100,000. On 1st September, 2002 it buys additional machinery worth Rs.27,000 and spends Rs.3,000 on its erection. The Accounts are closed each year on 31st December. Depreciation is written off 15% p.a. using Straight Line Method. You are required to prepare a Machinery Account for five years.
1.1.2000 Purchased machinery $100,000 Depreciation for 2000 $15,000 Nbv 31.12.2000 $85,000 Depreciation for 2001 $15,000 Nbv 31.12.2001 $70,000 1.9.2002 Purchased new machinery $30,000 Depreciation for 2002 $16,500 Nbv 31.12.2002 $83,500 Depreciation for 2003 $19,500 Nbv 31.12.2003 $64,000 Depreciation for 2004 $19,500 Nbv 31.12.2004 $44,500 Depreciation for 2005 $19,500 Nbv 31.12.2005 $25,000* *this nbv comprises $10,000 of the old machine and $15,000 of the new machine.
Q: How is cantilever technology used in heavy machinery?
anytime the load is extended out from beyond the structure, for example: 1 container cranes 2 shiploaders 3 ship unloaders 4 building a bridge over empty space (river, gully, road, railways) from both sides, especially evidenced in fixed stay bridges where the next segment is attached to the previous construction although the shooting bridge takes some of the loads 5 diving board at a pool
Q: What does CNC in machinery stand for?
Computer Numerical Control
Q: too young, sick, drunk, high, crazy?
How about just ignorant - I dont know how to operate any motorized machinery.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords