• Tower Crane  The Product model-TC5010(angle bar) System 1
Tower Crane  The Product model-TC5010(angle bar)

Tower Crane The Product model-TC5010(angle bar)

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

TC5010 hydraulic self-lifting tower crane is a new-style hoisting and transporting machine designed to meet the need of assembling high-level construction equipment. The product is an upper rotary self-lifting kind with horizontal jib, trolley amplitude. The length of the jib is 50m, rated maximum lifting capacity is 5t, Tip load at 50 m is 1t and rated maximum lifting moment is 570kN.m. The following is the main characteristics.

1. Wide applicability. The applicability is ranging from civil construction in small and medium cities, to high-rise, multi-layered civil construction in big cities. It can also be used in the construction of multi-layered industrial factories, in the slip-form construction of huge chimneys and silos and in goods loading in port or goods yard.

2. Easy to assemble and disassemble. Hydraulic jacking device is employed to increase or reduce crane standard section to adjust crane height to construction height.

    3. High speed, easy adjustment, stable operation and high efficiency. Low speed with heavy load and high speed with light load can be realized through lifting structure. Two kinds of speed of trolley can meet operational needs. Open stopper is equipped to slewing structure, enabling precise placement and easy assembly of crane.

4. Complete protective and reliable safety devices. The product is equipped with weight limit, moment limit, height limit, trolley limit and slewing limit to ensure normal operation. Besides rest platform, protective railings are also equipped.

5. Driver’s cabin is separately set. It is broad, bright, comfortable, safe and easy to operate.

The product is supplied with the basic height (Free standing) 32.5m.If it is used in high-rise construction, the number of standard sections and attached devices can be increased to meet consumers’ needs. The maximum height of the product is 120m.

Free standing height is 32.5m and  attached height 120m are the maximum lifting height of crane lifting hook.

 

 Parameter listlist 1

List 1     parameter list

      Max.working range

m

50

Rated load moment

kN.m

570

Max.Load

T

5

Min.working range

m

3

KN

T

a=2

a=4

1.045

1.036

        Max.lifting load range

m

a=2

a=4

24.17

12.92

Lifting Height

Free height

m

32.5

Attached height

a=2     120

a=4     60

Size of the whole

Foundation base

M

5×5

Overall height

Free height

42.23

Attached height

128.43

Tip to slewing center

51.13

Balance jib to slewing center

11.18

Whole machine weight

Free height

(without counterweight)

T

20.98

Attached height

(without counterweight

T

43.98

Counterweight

T

10.5

Other

Total power

KW

25.9

Wind speed

m/s

Working         ≤20

Jacking mast section   ≤12

Operating temperature

0C

-20~+40

 Facilities datalist 2

Trolley Mechanism

Motor

Model

YDES112-4/8

Speed

r/min

1380

710

Power

KW

2.4

1.5

Decelerator

Model

BE2450X

Gear ratio

39

Trolley speed

m/min

40/20

Lifting Mechanism

Motor

Model

YZTDE200L3 -4/8/24

Speed

r/min

1440

720

220

Power

KW

18

18

5

Decelerator

Center distance

Mm

460

Gear ratio

I

18.2

Rope capacity

M

280

Brake

Model

YT145Z/5

Brake force

N

450

Lifting speed

m/min

65/32.5

32.5/16

7.3/3.6

         Rated load

T

1.25/2.5

2.5/5

2.5/5

Min.speed of descent

m/min

<7.3

Total weight

T

1.2

Slewing Mechanism

Motor

Model

132M2-4

Speed

r/min

1410

Power

KW

3.7

Decelerator

Model

100Z

Gear ratio

I

150

Output torque

N·m

8300

Pinion gear

Modulo

M

10

Teeth no.

Z

15

Stand-off error

X

+0.5

Hydraulic coupling

Model

YOX280A

Rotary support

Model

011.40.1120

Speed

r/min

0.71

Hydraulic jacking

device

Hydraulic oil station

Working pressure

Mpa

25

power

KW

4

Oil cylinder

Rated pressure

Mpa

20

Bore

Mm

Φ140

Stem diameter

Mm

Φ90

Travel

Mm

1300

Installation distance

mm

1748

Jacking speed

m/min

0.4

KN

t

30

Loading capacity

50M Ratio two

R(m)

3~24.17

25

26

27

28

29

30

31

32

33

34

35

36

Load C (KG)

2500

2406

2302

2205

2115

2031

1953

1879

1811

1746

1686

1629

1575

R(m)

37

38

39

40

41

42

43

44

45

46

47

48

49

Load C(Kg)

1523

1475

1429

1385

1344

1304

1267

1231

1196

1164

1132

1102

1073

R(m)

50

Load C(Kg)

1045

50M Ratio four

R(m)

3~12.92

13

14

15

16

17

18

19

20

21

22

23

24

Load C (Kg)

5000

4968

4589

4260

3972

3718

3493

3291

3109

2944

2795

2658

2533

R(m)

25

26

27

28

29

30

31

32

33

34

35

36

37

Load C (Kg)

2418

2312

2213

2122

2037

1958

1883

1814

1748

1687

1629

1574

1522

R(m)

38

39

40

41

42

43

44

45

46

47

48

49

50

Load C (Kg)

1473

1426

1382

1340

1300

1261

1225

1190

1157

1125

1094

1065

1036

Tower crane mast section

 

Product photo

Q: Preferable short poems or phrases in Chinese.
this one is about cranes We thought they were gulls at first, while they were distant- The two cranes flying out of a natural morning, They circled twice about our house and sank, Their long legs drooping, down over the wood. We saw their wings flash white, Frayed at the black tip, And heard their harsh cry, like a rusty screw.
Q: Ok I got these huge mosquito things in my house and found out they are crane flies. I got up this morning and there are several hanging from my ceiling on a long single strand of silk or web. Is this unusual? Its really weird.
Most okorder
Q: How do they get big cranes up on skyscrapers for renovation? and how do they bring it down? And where they keep the cranes after done?
IT IS BUILT UP SECTION BY SECTION AND THEN TAKE IT DOWN THE SAME WAY.
Q: A crane lifts a 1265 kg steel beam vertically 26 m, it then stops and swings the beam 3 m horizontally into a position where the welders can secure it into its proper position. What is the work done on the beam by the crane? What is the work done by the force of gravity on the beam?
the work done on the beam by the crane = 1265 * 9.81 * 26 + 1265 * 9.81 * 0 = 322651 J answer work done by the force of gravity on the beam = 1265 * 9.81 * 26 + 1265 * 9.81 * 0 = 322651 J answer
Q: how do you win at the crane game?
im the master of the crane game. You gotta scope out the animal first! If it looks heavy then dont even bother. Whenever you grab hold of something its gonna pull it up and shake when it hits the top right? Thats why you go for something close to the hole it drops in. They have one where I work so I lock the wheels, grab the animal and pull the whole machine forward so that it just falls in the hole lol.
Q: Where do Cranes (the bird), typically live in ohio?
yes
Q: They;re ENORMOUS!!! Do they take them apart or something?
They are broken down into smaller unit pieces and are transported by truck or rail.
Q: What kind of personnel should be installed for the tower crane installation and disassembly?
2, with special construction operation qualification certificate of construction, lifting machinery, installation, demolition workers, lifting signal workers, lifting drivers, cable operators and other special operations personnel.And an electrician.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords