Tower Crane TC5613 Construction Machiney
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 15 set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Introduction:
Tower crane is used to lift, lower and horizontally move materials in construction and other industry. It has large lifting capacity and lifting height, wide moving range, and can rotate. It basically consists of base foundation, mast, slewing unit, working jib, counter jib, counterweight, hook, and operating cabin.
Features:
1. Provide stepless speed regulation. Outstanding in working efficiency, operating stability and reliability,
2. This Tower Crane equipped with hydraulic lifting and connecting. This Tower Crane' s height can accordign to the actual height of the building and at the same time unchange the lifting capacity.
3. LVF:Frequency control, variable speed, smoothness and high stability, non-striking.
4. Moment motor, high stability, long working life.
5. SM:Three-speed change pole motor, simple in structure, economical ,fitting.
6. has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on.
Specifications:
- Q: I am currently in the Air Force reserves as a heavy equipment operator. I really want to learn how to become a tower crane operator. How would I go about doing this? I live in CA.
- Hey Patrick, I was formerly a tower crane erector out of Washington DC. BUt, to yor question, I wold highly recommend you go to your town's Operator engineers Union Hall and inquire as to the qualifications and requirements to enroll in their apprenticeship program. Yes you will have to go thru the apprenticeship program. A tower crane operator is a coveted job among operators... You have to learn to hold your 'P for long periods as well as have great depth perception You coming out of the service, you should be given some preference Good luck
- Q: Only two magnification and four magnification are seen in the data, and the difference in weight is 0.1T. 10How does this magnification change during construction? Do you know that the door crane is changing the grab tower?
- Magnification, in simple terms, refers to several ropes through the hookIf it is one in and out of two wire rope, that is two magnificationSimilarly, two into two out is four magnification
- Q: What are the types of common tower cranes?
- (2) according to the transition typeSlewing tower crane: slewing support tower mounted on top of tower. It can be divided into tower cap, rotary tower, top rotating type, upper slewing platform type and rotary column type.The rotary tower crane, slewing tower body is arranged at the bottom, the tower to tower crane chassis rotation.
- Q: I have an odd fear of construction cranes. I literally get chills and almost dizzy anytime I see cranes. I get very nervous and almost want to cry. I know this is so odd but, I've seen phobias of things that are even more odd so I wonder...is there a phobia for my fear? Does anyone else share my fear?
- It took some research but here goes nothing. Aeorema were the cranes used in greek theatre. If the fear of cranes is specifically related to a fear of being snatched up by one, maybe Aeoremaphobia would be a more correct term. Cheers
- Q: carribean crane jobs?
- try okorder you can post your job there. Hope this help you out
- Q: A crane lifts a 2355 N bucket containing 1.81 m3 of soil (density=2084 kg/m3) to a height of 7.56 m. Calculate the work the crane performs.
- I will try to make it very simple. First lets convert the 2355 into a mass. 2355/9.81 = 240.06 Kg Then, we need to get the mass of the soil. Density (p)= m/v m= pv m= 2084*1.81 = 3772.04 Kg Total mass= 4012.1 Kg The final step is to calculate the work done. It can be solved from two perspectives and both will lead to the same solution. Sol. 1: Since that the crane is lifting an object, then the work the crane is doing is against gravity which is calculating the gravitational potential energy gained by the bucket. GPE= mgh= 4012.1*9.81*7.56 = 2.99*10^5 Sol 2: Work done= Force*distance moved in the direction of the force The force in this case will be the weight of the bucket. Work done= (4012.1*9.81)*7.56 = 2.99*10^5
- Q: how do i win stuff in a crane machine?
- you win by putting the crane where you want it to be
- Q: I just wonder they use cranes at such heights, how do they carry the cranes at such height? Helicopter or something? This is a picture of what I'm talking
- The cranes are jack-up cranes. They have their own self-contained jacks. As one floor is completed, they jack up to the next level. The cranes are on top of the buildings. They are designed by structural and mechanical engineers to loift a given weight.
- Q: Climbing process of an internal climbing tower crane
- The tower is sleeved on the ladder climbing, lifting hydraulic cylinder is articulated in the body of the beam, and the lower end (piston rod end) the middle beam is hinged on the activities. The two sides of the tower are provided with legs, and the two sides of the movable beam are also provided with legs, and the two supporting legs are alternately supported on the ladder steps so as to cause the tower to rise.
- Q: any kind of sayings
- You could just say whooping crane in another language, like Grue blanche (French) or Grulla blanca (Spanish). .
Send your message to us
Tower Crane TC5613 Construction Machiney
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 15 set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords