• TC5613B Tower Crane System 1
  • TC5613B Tower Crane System 2
  • TC5613B Tower Crane System 3
TC5613B Tower Crane

TC5613B Tower Crane

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
30 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

·  Customer can tell Masan the detailed specifications and Masan can make the suitable products for customers.

·   Manufacturing Year: 2014

·  Jib Length: 56m

·  Free Height Under Hook: 46m

·  Max. Load: 6T

·   Tip load: 1.3T

·  Mast Section Dimension(m): 1.6x1.6x3 (L44A1)

·  Hoisting Speed(m/min) & power: 8.5/40/80 24Kw

·   Slewing Speed (r/min) & power: 0~0.8 2x5.5Kw frequency

·   Trolleying Speed (m/min) & power: 43.7/21.7 3.3/2.2kw

·   Cable specification: 3x162 +2x102

·   Power Supply: 400V(+6% -10%)50HZ

Q: Do they have to be taken apart... if so, how are they taken apart... by another crane? - but how did that one get there etc etc
it depends on the crane over the road mobile cranes drive them selfs to the job site and they have a dolly for the conter weights and then on the larger ones a semi brings in the conter weights. Then on a latise boom crawler crane it depends on the size of the crane if its a small one say a 150 ton crane the body and tracks can usally be moved together on a semi and the lattice boom will come on a seperate truck and is usally assembled with a all terrain fork lift. Then say on a larger crawler crane like a 500 tonner the body and tracks and carrige all come in seperate peices and are ussally put togther with a RT crane(more on the latter) and these cranes are held together with massive pins i saw a crew build a 400 ton manitowac crane with 150 feet of stick in less then a day. Now if they have to add more stick like say 200 feet of main stick and 150 feet of luffing jib they will build it all on the ground and then another crane will help lift the stick up Then there are RT cranes or rough terrain cranes they are moved on a semi to and from the job site and usally require no assebley thats all i know about i cant say how a tower crane is build iv never see one build hope this helps
Q: Crane lifts a 600-kg bin with an initial acceleration of 2 m/s^2. Determine the force in each of the supporting cables due to this motion.?
F = ma Assume the crate is uniformly loaded, both cables will carry the same force F(AB)(4/5) = (600/2)(9.8 + 2) F(AB)(4/5) = 3540 F(AB) = 4425 N F(BC) = 4425 N F(B-Crane) = 600(9.8 + 2) F(B-Crane) = 7080 N As a form of exchange, please remember to vote a Best Answer from among your results. This is not the same as like or thumbs up which are also nice and do boost points, but only after asker awards initial points with their vote.
Q: What is the definition of lifting, slewing and luffing of tower cranes?
Rotary is cantilever tower crane tower crane rotary shaft winding;Is the hook shaft distance amplitude change;
Q: What does tower crane jacking up mean?
Attached tower crane upper work structure and the lifting sleeve frame connected to the lifting sleeve frame is installed on the lifting jack.
Q: carribean crane jobs?
try okorder you can post your job there. Hope this help you out
Q: inventor of junk yard electromagnetic crane?
Who Invented The Electromagnet
Q: what is that max torque it can with stand when the max laod it can handle is 811 N?i can NOT get this question, its driving me crazy!HELP????? thank you
The easy answer is that the applied torque is the cross product of the radial arm and the force, or in this case T = 811*17*cos(13.5). The hard (it's actually not that hard) answer will depend on the design and material properties of the crane. Since the problem asks for max torque, I'd find the bending stress due to the moment found above (T = 811*17*cos(13.5)) where bending stress = Ty/I. Next, compare this to the yield stress of the crane's material and an appropriate failure criterion.
Q: Today, my boyfriend surprised me with an origami bird he'd made for me the night before, just for no reason. He told me he'd tried to make a crane but it got to be to complicated. I thought an was an incredibly sweet gesture, and I thanked him thoroughly. I was wondering if it would be nice to give him an origami something back? I found a really easy video on how to make cranes and I made one, but I don't want it to seem like I'm trying to show him up, I just want to show my gratitude. Would it be best to give him the crane, give him a different origami animal, or just let the whole thing go? Sorry if it seems like I'm over thinking this, I just really like him :)
NOT the crane, another origami animal perhaps or give him something different. The crane will so seem as if you're trying to show you're better :P so sweet he gave you a bird though! Be happy! :D
Q: The earthing resistance of tower crane shall not be greater than that of the tower crane
Three. Technical specification for temporary power safety on construction site JGJ 46-20055.4.2 within the construction site crane, derrick and Longmen machinery equipment, metal structure and steel scaffolding and under construction in construction projects, when lightning protection devices in adjacent buildings, structures and other facilities outside the protect zone of lightning arrester, lightning protection device should be installed in accordance with the provisions of.5.4.7 lightning protection electrical equipment machinery, connected to the PE line must repeat grounding at the same time, with a repeat of the mechanical and electrical equipment grounding and lightning protection grounding machines can share the same grounding body, but should be consistent with the repeated grounding resistance of grounding resistance requirements.The electrical equipment of 9.2.1 tower crane shall comply with the requirements of the current national standard "safety regulations for tower cranes" GB5144.9.2.2 tower cranes shall be subjected to repeated earthing and lightning protection grounding as specified in Clause 5.4.7 of this code. The earthing device of the track type tower crane shall comply with the following requirements:L the two ends of the rail are respectively provided with a grounding device;The joint of the 2 track is electrically connected, and the ends of the two tracks are electrically connected in the loop;3 long track every is not more than 30m and a grounding device.
Q: Tower crane body standard section connection bolt screw upward or downward, why?.
Up or down, there is no change in the firm torque of the connecting bolt. Simply choose to go up or down for convenience. Generally no special requirements, it is recommended that the thread upward, so that it is not easy to rust.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords