Tower Crane TC5013A Construction Machiney
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 15 set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Introduction:
Tower crane is used to lift, lower and horizontally move materials in construction and other industry. It has large lifting capacity and lifting height, wide moving range, and can rotate. It basically consists of base foundation, mast, slewing unit, working jib, counter jib, counterweight, hook, and operating cabin.
Features:
1. All the components are designed to minimize the total number of trucks required to transport them.
2. The jib components can house the jib tiesto, which makes transport easier and quicker. Easy assembly of the jib and counter-jib ties.
3. The mechanisms are always used at full power. When hoisting, the speed is optimized according to the load and command. In distribution, progressive variation of speed and the maximum speed are adapted to the weight of the load. In orientation, there is controlled proportionalspeed with optimal acceleration and deceleration in accordance with the maximum admissible torque for the mast.
4. The auxiliary winch can be used on the derrick: this provides user with the possibility of a motorized derrick at the base of the machine.
5. DVF Distribution
The jib-footDVF mechanism is easily accessible in total safety.
Progressive speed variation by proportional control.
The speed depends directly on the controls manipulated by the crane operator.
To make driving the crane easier, 2 hard spots integrated into the controlsprovide better pinpointing of the speed.
6. RVF + orientation
The RVF Optima + orientation enables gentle rotating movements without jerking.
7. Fully integrated progressive control. Driving adapts to the behavior of the crane operator. The slow-down phase of the jib is managed by the frequency variator, Or by an inverted command in the slow-down phase, called a "counter-orientation" command.
Specifications:
- Q: if someone have formula for that, one telescopic crane is lifting and i know about the boom lenght and redius,then how i can calculate the angle,if crane crane angle indicator is not working.thankyou.
- You can figure out your angle with the Pythagorean method. Also, you should NEVER operate a crane with any indicator device not functioning. This in violation of OSHA law and many state and local laws. If there is any damage or injury you will be held negligent..
- Q: I've always wondered, how do they lift cranes? Bigger cranes? What do you think/know?
- They have a dragon.
- Q: My best friend is going to live in Japan for about a year soon, and I want to send him a birthday present while he's there. A lot of the places I've looked say it's common to make 1000 cranes for people as a wedding present, or in preparation for your own wedding so I'm not sure this is an appropriate gift -___- Also, I have no idea how I would ship them to him...
- One idea would be to send one crane that you've made using airmail paper. Write your wish for your friend tell him that you have 999 more cranes waiting for him to return home again.
- Q: Is there a crane lifting chart where I can enter info. to determine what size crane I need, if so where?
- Sorry, it's not quite that simple.
- Q: Safety rules for tower cranes
- Three. Check after shutdown3.1 after the tower crane has stopped operation, it is necessary to select the suitable position of the barrier and the middle of the track when the turret is turned and the arm to stop along the wind, and then lock all the rail clamps.All 3.2 tower crane rotary mechanism with a normally closed or braking device, in the stop after the operation, the driver must remove the handle, release the brake for crane in the wind blowing in under the direction of rotation.3.3, the hook should be lifted to the minimum distance from the lifting wall, not more than 5m position, hanging on the hook is strictly prohibited. Not to take reliable measures, not by any means, limiting the boom rotate with the wind.
- Q: I had a dream and it wos really scary so realistic i woke up crying and could go to work the next dayi was in my house and woke up and came downstairs and there were letters on the floor and someone was picking them up then i looked outside and there wos a big fire and a crane had fallen down and explosion and everyone was dying their faces burnt i burst out crying. what does it mean?
- Probably some stress or fear is looming large in your subconscious mind. Scary dreams often occur when you have something that is stressing you. That is assuming you didn't read some book or watch some movie that brought it on, that is another possibility. Often we replay images we have in our heads from the day before. I don't think it is an omen or anything. So, be glad to say it was only a dream.
- Q: I herd that there was some sort of legend that if you make a certain # of paper cranes you get a wish! Do you believe this to be true? Do you have to make 100 cranes or 1000 cranes?
- For the best answers, search on this site Right now, that my contacts answer my questions for a change!
- Q: sun/rising/etcBQ: how often are your winnings
- i'm very bad at those machines..... be it the crane or any other kind, i just failed it again and again (kind of reminded me of squidward's failure to beat spongebob) well, i never had the talent to be the crane..... always failed even at getting the animals, it's so hard to pick them up! oh well~~ scorpio sun and rising
- Q: What are the climbing claws on the tower crane?
- You mean the set section? Used to be rubber, and later found that when the top of the friction is too large, not too good, plus plus the festival, but also always remove the standard section paint, and now basically the pulley
- Q: i want to know about the origami cranes
- im pretty sure the origiami craft originated in Japan. i'm not too sure, but i did look it up, and it said japan. so im guessing thats right.
Send your message to us
Tower Crane TC5013A Construction Machiney
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 15 set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords