Tower Crane of Jing Kui Model Number QTZ4208
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 35 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
QTZ4208 Description
Feature: Tower Crane
Condition: New
Rated Loading Capacity: 4t
Rated Lifting Moment: 400
Max. Lifting Load: 4t
Max. Lifting Height: 120
Span: 42
Place of Origin: Shandong, China (Mainland)
Brand Name: JINKUI
Model Number: QTZ4208
Warranty: one year
After-sales Service Provided: Engineers available to service machinery overseas
Certification: ISO9001:2000; CE;Ukraine & Belarus Certificate
Colour: Orange/ Yellow
QTZ4208 Features
1.Thirteen years of experience in supplying new self-erecting tower crane with Huiyou Brand.
2. Export to more than 20 countries with CE/ISO/GOST Certificates.
3. Stationary/Travelling, external/ internal climbing tower crane
4. Impeller blasting/rust protection paint
5. Advanced painting process
6. Potain masts designed with dismountable panels, making teansport easier and cheaper.
7. New designed mast, can be used to Internal and external climbing tower crane
8. Famous brand mechanism system, Schneider Electronic control system, jiangte and jiuhe motor
QTZ4208 Specification
QTZ4208 Pictures
QTZ4208 FAQ
Q: What kind of steel used for tower crane?
A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.
Q: What is tower crane?
A: Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.
Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?
A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.
Q: What is the function of the monitor?
A: Monitor, namely inspection system (like black box), which could store 10000 tower crane operation reports, and it is recommended to be installed in big cranes more than 16t.
- Q: how can I get rid of what looks like small crane flies in my yard and house. they seem to get in the grass?
- First determine if they are hurting anything. If they are true crane flys they will go a way soon. If they are not hurting anything I would not treat them. If you want to identify exactly what they are capture some and take them to you County Extension agent and he/she will be able to tell you what they are and if they pose a danger to you and your family.
- Q: What do you do to become a crane operator, do you go to school and how long is it?
- OK, first, what kind of crane? there are many different kinds that do many different things. From loading containers at the seaport to high rise buildings. One does not just go into cranes. The more experienced ones, started out as oilers or greasers. Some started out as signal persons. They learned by watching and listening. In the following states you must hold National certification: CA, HA,MT,OR,WA,MN,WV,NM,RI,NJ,NV,NY UT. PA and SC have restrictions now but will be added sometime soon. You can attend a crane school that prepares you for the national certification, but it expensive and not easy for someone without a background working around cranes. There is a lot of terminology and mathematics involved. Not to mention the Federal, state, local and OSHA rules you must practice. Go to your state employment office. They have all the information you need. get to know one of the counselors and pursue your dream. It is not as easy as it seems. But is it a well paying career. Good luck Bill
- Q: What should be included in the disassembly plan of the tower crane?
- - 3 - tower crane demolition special program should include the following1. General situation of engineering;2, the tower crane position of the plane and elevation;3. Disassembly order;4, unit weight and hanging point position;5, remove the auxiliary equipment types, performance and arrangement position;6, the power set;7, the construction personnel configuration;8. Rigging and special tools;9, major sources of risk and safety technical measures;10, emergency plans, etc..Note: (1) the special construction plan for the installation and disassembly of tower cranes shall be examined and approved by the units, technology, safety, equipment and other departments, and shall be implemented after approval by the supervisor.(2) the contents and requirements of the special construction scheme for tower crane installation;Compiled from the "building construction tower crane installation, use and disassembly safety technical regulations" JGJ196-2010, please refer to the implementation. Attached: 1, Zhifu Wanda Plaza Tower Crane installation program 2, Muping District Cultural Center project PT7528 tower crane demolition program
- Q: Is the tower crane a special type of work?
- Certainly, it belongs to the high-altitude workers, not the special workers, what is the tower crane talent network is a platform for the exchange of tower.
- Q: I don't like the cranes that use a wired pulley systems for controlling the camera.The crane will need to carry a 7 pound camcorder.
- Camera okorder /
- Q: Ever felt like a paper crane?
- Made to fly, bended to will, broken in the process because some jerk knocked you down. At the end of the day tossed away because you're nothing more than a delicate pretty thing in their eyes, with a skin as thick as the tissue paper you're made of. Yep.
- Q: from the legend of sleepy hollow, his background, characater, personality, life etc.
- uhh...by reading sleepy hollow?
- Q: What did Stephen crane contribute to history?
- I think his greatest contribution was The Red Badge of Courage. It was the most ealistic portrayal of a Civil War soldier written at the time; so real, in fact, that veterans swore the had fought alongside him during battle (Crane wasn't even alive during the war).
- Q: how to calculate load capacity of crane?
- must be sble to left one in half times weight
- Q: I read a book a year ago about sadako sasaki who tried to make all 1000 paper cranes to live. Do you have to keep saying your wish over again when your making them, and when you finished making all 1000 how long did you wait until your wish came true??
- you make your wish once your done cause you only get the wish if you have 1000 cranes right so saying your wish when you only have 6 won't do anything. it can come true the next day till the next year or ten years it not something definite. I've never made 1000 but I think I will.
Send your message to us
Tower Crane of Jing Kui Model Number QTZ4208
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 35 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords